2025 AGM Presentation Materials
Released
Released
Announcement PDF
talismanmining.com.au
ASX: TLM
AGM
Presentation- 6 November 2025
A well-funded explorer with a diversified
portfolio in NSW and South Australia
2
Well-funded, strong exploration DNA, highly leveraged to
exploration success
The Talisman Investment Proposition
NSW - Lachlan and Macquarie Arc
• Three projects covering ~6,600km2
• World-class metal province
• New phase of drilling planned
• Significant zones of high-grade lead-zinc-silver-copper-gold
mineralisation at South Lachlan
• Exciting new Gold exploration project at Walkers Hill
• Porphyry copper-gold project at Yarindury
SA - Gawler Craton
• Mabel Creek IOCG Project
• ~1,040km2 in under-explored terrain
• Close to major world-class mines (Prominent Hill, Olympic Dam)
• Gravity targets of significant scale to drill
WA - Wonmunna Iron Ore Royalty
• Uncapped 1% gross revenue royalty
• Operated by Mineral Resources (ASX: MIN)
• Production commenced March 2021
• $32.8m in receipts to date
NSW Lachlan
Wonmunna
Head office
Gawler Craton
NSW Lachlan
Hillston Cu-Au Project
Lachlan Cu-Au Project
Macquarie Arc Cu-Au Project
3
Capital Structure Shareholder Ownership
Experience Board & Management
188.3M
Shares on issue
11.6M
Unlisted options
(Exercise Prices: 20.1c – 33.4c)
A$21.7M
Market Capitalisation
A$4.5M
Cash & Liquids
(30 Sept 2025)
(11.5c/share – 4 November 2025)
Nil
Debt
A$17.2M
Enterprise value
ASX: TLM
Kerry Harmanis
Non-Executive Chairman
Andrew Munckton
Managing Director
Peter Benjamin
Non-Executive Director
Brian Dawes
Non-Executive Director
Jeremy Kirkwood
Non-Executive Director
Tim Sharp
Exploration Manager
Board & Management
HNW Investors
Harmanis Holdings
Retail
Corporate Overview
4
Wonmunna
MinRes recently released for Pilbara Hub
Ore Reserve – 51Mt at 57.5% Fe – 5 years at 10Mtpa
Mineral Resource - 161Mt at 57.0% Fe
Wonmunna plays a roles as blending material to lower P% and
Al2O3% to meet customer specifications
Talisman royalty payments
• To date - A$32.8M
• FY25 - A$9.0M
• SQ25 - A$1.55M
Lamb Creek first ore scheduled Q4 FY26
Production rate up to 7.5Mtpa
Displaces Wonmunna, with scheduled winddown in Q3 and Q4 FY26
A significant Mineral Resource remains at Wonmunna plus
exploration opportunity to extend from mined projects
Exploration and Definition Drilling – FY26 to expand Reserves of low
P% and Al2O3% ores at Wonmunna
Note 1. MinRes ASX announcement 27 August 2025, TLM announcement 29 October 2025
5
Extensive, high-quality portfolio in a world-class mineral
districts
• Lachlan North Project
• 8 EL’s, 2215km2 (33% of the Lachlan Project)
• Cobar Basin Epithermal-style lead-zinc-silver-copper-gold
• $4.1M by TLM over 6 years
• Prospective for Copper and gold rich deposits
• Nearby established producers – Harmony, Aeris
• Lachlan South Project
• 9 EL’s, 2004km2 (30% of Lachlan Project)
• Cobar Basin Epithermal-style lead-zinc-silver-copper-gold
• $29.4M spent by TLM over 6 years.
• Contains Rip n Tear, Kaolin Shaft, Blind Calf and Durnings.
• Current exploration projects at Walkers Hill
• Gold Dominant
• Sheepyard
• Maroonbah
Lachlan Base Metals and
Copper-Gold Project
6
Lachlan Project NSW
Durnings Prospect
Follow Up Drill Test
• Initial 24 RC and DD holes drilled in 2 phases
• Two new zones Discovered
• Southern Durnings DRRCD0006 and DRRCD0019 Results3
• High grade, Base Metals mineralization
• 6m at 10.3% Pb, 3.5% Zn, 126g/t Ag, 0.4% Cu, 1.93g/t Au from 274m
• 7.4m at 6.7% Pb, 2.9% Zn, 137g/t Ag, 0.2% Cu, 0.24g/t Au from 198m
• Second Zone High grade, Cu-Au and Base Metals mineralisation
• 28m at 4.03g/t Au, 0.9% Cu, 3.8% Pb, 0.7% Zn, 26.5g/t Ag from 370m
incl.
• 10m at 7.94g/t Au, 1.0% Cu, 9.9% Pb, 1.5% Zn, 61.3g/t Ag from 374m
• Northern Durnings DRDD0023 Results3
• High grade, Cu-Au mineralisation
• 4m at 12.6g/t Au, 0.5% Cu, 0.4% Pb, 0.6% Zn and 11.4g/t Ag from 90m
• 13m at 1.35g/t Au, 0.3% Cu, 2.7% Pb, 0.3% Zn and 18.1g/t Ag from
65m
• Adjacent to Mineral Hill (Kingston) processing facility
Note 3. ASX:TLM - 27 March, 29 April, 7 June & 20 November 2024.
7
Lachlan Project NSW
Walkers Hill Prospect
Initial Drill Test
• Sheepyard4
• Initial 5 RC Holes
• Large Coherent gold and arsenic-in-soil anomaly 1km x 1km
associated with significant geological contact
• Shallow RC results
• 40m at 0.46g/t Au from 3m - PMV005
• 42m at 0.44g/t Au from 4m – SYRC0003
• Strong IP chargeability target at depth intersected
• +25mV/V
• 16m at 0.38g/t Au from 124m – SYRC0002
• 24m at 0.58g/t Au from 124m – SYRC0004
• Follow up with AC program, 2500m targeting higher grade near surface
mineralisation in Dec Quarter 25
• Maroonbah4
• Large coherent gold and arsenic in soil anomaly 3.5km x 2.5km
associated with significant geological contact
• Historical shallow RC results
• 20m at 0.48g/t Au from 16m – TBC015
• Follow up with infill soil Geochem in CY26
Note 4. ASX:TLM – 17 June 2025, 23 July 2025 & 15 September 2025
8
Lachlan Project NSW
Walkers Hill Prospect
Initial Drill Test
• Sheepyard4
• Initial 5 RC Holes
• Large Coherent gold and arsenic-in-soil anomaly 1km x 1km
associated with significant geological contact
• Shallow RC results
• 40m at 0.46g/t Au from 3m - PMV005
• 42m at 0.44g/t Au from 4m – SYRC0003
• Strong IP chargeability target at depth intersected
• +25mV/V
• 16m at 0.38g/t Au from 124m – SYRC0002
• 24m at 0.58g/t Au from 124m – SYRC0004
• Follow up with AC program, 2500m targeting higher grade near surface
mineralisation in Dec Quarter 25
• Maroonbah4
• Large coherent gold and arsenic in soil anomaly 3.5km x 2.5km
associated with significant geological contact
• Historical shallow RC results
• 20m at 0.48g/t Au from 16m – TBC015
• Follow up with infill soil Geochem in CY26
Note 4. ASX:TLM – 17 June 2025, 23 July 2025 & 15 September 2025
9
Two Project Areas
• Junee Narromine Belt
• Grassroots to advanced Exploration
• 4 significant blocks of ground – 766km2
• Tenure spans Ordovician age Volcanics containing
complex deep-seated intrusions
• Adjacent to North Parkes (Evolution) and Tomingley
(Alkane) operations
• Molong Belt7
• Yarindury EL9679 – 180km2
• Previously explored by Newcrest and Golden Cross
• Coincident gravity-magnetic anomalies on major
basin structures
• Tenure spans Ordovician age Volcanics containing
complex deep-seated intrusions confirmed by
Newcrest drilling 2018
• New exploration targets revealed by geophysical IP-
MT) surveys
Macquarie Arc Project NSW
Exposure to Tier-1 Cu-Au
deposit discovery potential
Note 7. ASX:TLM – 6 August, 30 September, 30 October 2024, 23 July, 29 October 2025.
10
Note . T. Hoschke,
A. Harris, J Hoyle
2020. Geophysical
Response of
Alteration and
Mineralisation at
the Cadia and
North Parkes
Porphyry District,
NSW, Australia
Note . T. Hoschke,
A. Harris, J Hoyle
2020. Geophysical
Response of
Alteration and
Mineralisation at
the Cadia and
North Parkes
Porphyry District,
NSW, Australia
11
Note . T. Hoschke,
A. Harris, J Hoyle
2020. Geophysical
Response of
Alteration and
Mineralisation at
the Cadia and
North Parkes
Porphyry District,
NSW, Australia
12
Macquarie Project NSW
East Peak Hill
Initial soils program not effective
• Cover too deep >12m in places didn’t allow the Auger rig to penetrate the
cover
• Requires AC program to test for underlying gold mineralisation
• Anomalous Au-As-Mo in soils to date
• Program approved and ready to implement
• 100 holes for 5000m
• 10 lines at 400m line spacings over 6km strike length
• Scheduled to commence Jan-Feb 2026
• Same mineralisation assemblage and alteration indicators in soils
as 1.5Moz Tomingly deposits of ALK 10km NW
• Next steps
• $220k AC program over main target lithology
• Wallis drilling booked and confirmed.
• Results MQ 2026
• Potential second program over red areas in 2026 (land access
currently being negotiated) if successful
• Recommendation
• Undertake to EPH AC program as planned
Note 5. ASX:TLM – 17 June 2025, 23 July 2025 & 11 September 2025
Note . T. Hoschke,
A. Harris, J Hoyle
2020. Geophysical
Response of
Alteration and
Mineralisation at
the Cadia and
North Parkes
Porphyry District,
NSW, Australia
13
Note . T. Hoschke,
A. Harris, J Hoyle
2020. Geophysical
Response of
Alteration and
Mineralisation at
the Cadia and
North Parkes
Porphyry District,
NSW, Australia
14
Yarindury Cu-Au Project7
• Exploration Licence (EL9679)
• Tenure spans Ordovician age Volcanics
containing complex deep-seated intrusions
• Previously explored by Newcrest 2017 and
Golden Cross 2010
• 20km N of Boda-Kaiser (Alkane)
• Coincident gravity-magnetic anomalies on
major basin structures
• Detailed magnetic and regional gravity data
acquired. Landholder engagement for on-
ground activities complete
• New geophysics (IP-MT) surveys reveal buried
chargeability targets
• Planned drilling in December 2025
Macquarie Arc Project NSW
Exposure to Tier-1 Cu-Au
deposit discovery potential
Note 7. ASX:TLM – 6 August, 30 September, 30 October 2024, 23 July, 29 October 2025.
15
Yarindury Cu-Au Project7
• Exploration Licence (EL9679)
• 100km north of Cadia (Newmont)
• 20km N of Boda-Kaiser (Alkane)
• Both Cadia and Boda Kaiser show substantial
chargeability anomalies associated with NW-
SE trending structural features immediately
above the very large Cu-Au deposits
• New geophysics (IP-MT) surveys reveal buried
chargeability targets of substantial scale and
high chargeability associated with interpreted
NW-SW trending structural features
• 2 deep diamond holes planned to test first two
IP targets
• Commence December 2025
Macquarie Arc Project NSW
Exposure to Tier-1 Cu-Au
deposit discovery potential
Note 7. ASX:TLM – 6 August, 30 September, 30 October 2024, 23 July, 29 October 2025.
talismanmining.com.au
Contact Mr Andrew Munckton
Managing Director
+61 8 9380 4230
info@talismanmining.com.au
17
Appendix 1: Competent Persons’Statements
Exploration Results and Exploration Targets
Information in this presentation that relates to Exploration Results an Exploration Targets is based on and fairly
represents information and supporting documentation complied by Mr Andrew Munckton, who is a member of
the Australasian Institute of Mining and Metallurgy. Mr Munckton is a full-time employee of Talisman Mining Ltd
and has sufficient experience which is relevant to the style of mineralisation and types of deposits under
consideration and to the activities undertaken to qualify as a Competent Person as defined in the 2012 Edition of
the “Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Munckton
has reviewed the contents of this presentation and consents to the inclusion in this presentation of all technical
statements based on his information in the form and context in which they appear.
No new information that is considered material is included in this document. All information relating to
exploration results has been previously released to the market and is appropriately referenced in this document.
JORC tables are not considered necessary to accompany this document.
The Company confirms that it is not aware of any new information or data that materially affects the Exploration
Results information included in this report from previous Company announcements.
Share your feedback
Discover