June 2023 Quarterly Activities Report
Extensive exploration campaign advances across NSW Lachlan Project, with
multiple gold and base metals intercepts
Highlights:
Lachlan Copper-Gold Project, NSW
• Reverse Circulation (RC) drilling program continues with nine targets tested during the quarter over
five Exploration Licences (EL), including two additional targets that were generated during the
quarter.
• 24 holes for 5,590 metres of RC drilling completed during the quarter, with the program delayed by
inclement weather and now planned to be completed subsequent to quarter-end.
• Drilling is focused on testing priority conductive and gravity anomalies from Talisman’s landmark
2022 regional geophysical surveys 1.
• Two additional high-priority targets were generated during the quarter as a result of Induced
Polarisation geophysical surveys.
• Auger drilling was completed over two prospect areas on EL8571 and EL8615 and is progressing
on a third greenfields area on EL8414 with the aim of identifying additional geochemical anomalies
for future exploration testing.
Lucknow Gold Project, NSW
• Completed technical consultation and planning in conjunction with Talisman’s joint venture partner,
for a 2-hole drill program to test a conceptual target at the Lucknow Gold Project with drilling
scheduled to commence in the second half of 2023.
Corporate
• Completion of the acquisition of the Mabel Creek IOCG Project, located in South Australia’s Gawler
Craton, with the transfer of project tenure to Talisman now finalised and negotiations underway on
a native title agreement to enable the commencement of on-ground activities.
• Royalty cash receipts from the Wonmunna Iron Ore Project of $2.25 million received for the quarter
with a further $0.53 million received subsequent to quarter-end 2.
• Talisman remains well-funded with cash on hand at 30 June of $9.8 million.
1
Refer Talisman ASX announcements dated 17 January 2022, 30 March 2022, 26 July 2022 and 16 November 2022 for full details.
2 Refer Talisman ASX announcement dated 15 April 2021 for royalty details.
1
Lachlan Copper-Gold Project, NSW
Through the June 2023 quarter, Talisman progressed three key exploration workstreams across the
Lachlan Copper-Gold Project in NSW (Appendix 2). These interlinked workstreams are designed to
rapidly test priority drill targets while screening areas below cover for further geochemical and
geophysical anomalies, adding to Talisman’s exploration pipeline while the highest priority targets
are systematically drill tested and results evaluated.
Reverse Circulation (RC) Drilling
Talisman’s current RC drilling campaign, which commenced in late January 2023, continued during
the June 2023 quarter with drilling undertaken across nine target areas and five Exploration Licences
(refer Table 1 and Figure 1) 3.
Exploration
Licence (EL)
Drilling Completed
EL8414
#
Targets
4
#
Holes
7
#
Metres
1,582
EL8571
3
9
2,202
EL8680
EL8658
EL9298
1
2
1
2
4
2
336
996
474
Target/s Tested
Mayo, Kildare & VTB3_19 AEM Anomalies,
Galway AGG Anomaly
Stella East & Stella West, Carpina North
Prospects
Durnings Prospect
The Pines & Rainbow Folds AEM Anomalies
Bengal AEM Anomaly 4
Table 1 - Summary table of June Quarter 2023 RC drilling.
Drilling progressed well throughout the quarter with reasonable production rates, however, was
slowed by inclement weather leading to restricted access to drill areas intermittently through May
and June.
With the exception of targets on EL8571, all other targets are either conductive anomalies identified
from the VTEM Max™ Airborne Electro-Magnetic (AEM) survey, or density anomalies from the
FALCON Airborne Gravity Gradiometry (AGG) survey1. Targets drill tested on EL8571 were a
combination of newly generated chargeable anomalies from ground-based geophysical surveys
conducted during the quarter and extensions to an existing target identified by Talisman’s previous
drilling in early 2022.
This phase of RC drilling represents the first test of the geophysical targets generated from the 2022
AEM and AGG surveys and provides an important proof-of-concept of the Company’s exploration
strategy by utilising newly acquired, high-quality regional datasets to refine the search space and
target areas most likely to return a new mineral discovery.
The current RC drilling program has two AEM targets left to complete in July to conclude the current
drilling phase, with drilling activity presently being progressed on EL9298.
3
4
Refer Talisman ASX announcements dated 28 April 2023, 15 May 2023, and 20 July 2023 for full details including JORC tables.
Drilling of this target was ongoing at the end of the quarter.
2
Figure 1 – Central Lachlan Project June Quarter 2023 drill targets.
Exploration Licences EL8680/EL8547 (Kaolin Shaft & Durnings Prospects)
A significant high-grade intersection of 8m @ 6.3g/t Au, 0.77% Cu, 0.27% Pb, 0.36% Zn and 6.3g/t
Ag from 82m down-hole in DRRC0001 was returned during the quarter from drilling at the Durnings
Prospect (Figure 2), with sulphide mineralisation returned through the entire hole 5.
This has significantly extended the known sulphide mineralisation at the prospect as well as
delivering significant gold mineralisation results, elevating this prospect area in Talisman’s
5
Refer Talisman ASX announcement dated 15 May 2023 for full details including JORC tables.
3
exploration targeting pipeline. The polymetallic nature of the mineralisation intersected is particularly
encouraging, as the concurrent intersection of both the copper-gold and lead-zinc-silver mineral
systems known to mineralise the Cobar Basin in NSW suggests a long-lived structural control in this
area acting as a conduit for both phases of mineralising fluids.
Assays indicate that the extensive sulphidic zones first reported 6 as visual sulphides are strongly
correlated to mineralisation, with disseminated sulphides hosting lead-zinc mineralisation and a
phase of sulphide veining associated with copper and high-grade gold mineralisation. Sulfur assays
corresponded well to visual estimates of sulphides and largely fell within the estimated ranges first
reported.
Downhole Electromagnetic (DHEM) surveys were conducted on holes DRRC0001, DRRC0002 and
DRRC0005. These did not identify off-hole conductors proximal to drillholes, however visual
interpretation of the mineralisation intersected does not indicate massive or interconnected sulphides
which would provide a conductive anomaly.
Figure 2 - Significant intercepts from RC drilling at the Durnings Prospect.
Base metal sulphides were also observed in conjunction with quartz-carbonate veining and minor
stockworks in a host rock of volcaniclastics with finely disseminated pyrite, suggesting hydrothermal
6
Refer Talisman ASX Announcement dated 28 April 2023 for full details including JORC tables.
4
processes introducing base metals to a volcanogenic massive sulphide (VMS) environment. Two
holes for a total of 444 metres of RC drilling (KSRC0013-KSRC0014) were completed on the Kaolin
Shaft prospect, following up on 2022 drill programs6. These were designed to target structurally
controlled mineralisation thought to be associated with a faulted NW-SE anticline. Assay results have
been returned for both drillholes with encouraging base and precious metal mineralisation
encountered in both holes 7 (Figure 3).
Open shallow Au mineralisation
KSRC0013 – 8m @ 0.75g/t Au, 8.5g/t Ag
from 52m & 8m @ 0.26% Zn from 190m
Figure 3 - Significant intercepts from RC drilling at Kaolin Shaft Prospect.
The intersection of shallow gold mineralisation in drillhole KSRC0013 under transported cover and
distal from historical drilling suggests that the Kaolin Shaft Prospect has further mineral potential
which has not been tested by historical drilling.
7
Refer Talisman ASX Announcement dated 15 May 2023 for full details including JORC tables.
5
Step-out drilling was successful in identifying further mineralisation and validating the structural
model. Further work will focus on understanding gold and zinc mineralisation at the prospect,
assessing further extensions of shallow gold mineralisation from KSRC0013, and further
investigating the Kaolin Shaft – Durnings Mineralised Trend (Figure 4). Gradient Array Induced
Polarisation (GAIP) surveys have been scheduled across this area in the coming quarter to assist in
constraining drill targets further.
Figure 4 – EL8680 Kaolin Shaft - Durnings Mineralised Trend and 2022/2023 RC drilling.
6
Exploration Licence 8571 (Carpina North & Stella Prospects)
Carpina North Prospect
Four RC holes (CNRC0013-CNRC0016) for a total of 876 metres were drilled at the Carpina North
Prospect 8 to follow up on the gold results returned in drill-hole CNRC0012, which was completed as
part of the 2022 drill program and returned 40m @ 0.51g/t Au from 24m down-hole 9 as part of a
wider mineralised zone (Figure 5).
Figure 5 – Carpina North 2023 RC drilling, holes CNRC0011 to CNRC0016. Significant intercepts are labelled.
Significant gold results were returned in drill-hole CNRC0014, with a number of mineralised zones
above 1g/t Au encountered down the hole (Figure 6). Intercepts include:
8
9
•
8m @ 0.71g/t Au from 16m down-hole including 2m @ 1.42g/t Au from 22m down-hole;
•
2m @ 2.77g/t Au from 134m down-hole;
•
14m @ 0.51g/t Au from 146m down-hole including 4m @ 1.35g/t Au from 156m down-hole; and
•
2m @ 1.04g/t Au from 210m down-hole.
Refer Talisman ASX announcement dated 20 July 2023 for full details including JORC tables.
Refer Talisman ASX announcement dated 26 July 2022 for full details including JORC tables.
7
Other drill-holes also returned significant gold assays, including:
CNRC0015
• 2m @ 1.02g/t Au from 102m; and
•
8m @ 1.06g/t Au from 116m including 2m @ 1.95g/t Au from 122m.
CNRC0016
• 14m @ 0.74g/t Au from 62m including 6m @ 1.18 g/t Au from 70m;
•
10m @ 0.40g/t Au from 90m; and
•
2m @ 0.65g/t Au from 168m.
No significant gold results were encountered in CNRC0013, which has constrained the
mineralisation to the east of current drilling, suggesting that the mineralised zone strikes north-south
parallel to regional structures of the Mineral Hill Volcanic Belt (Appendix 2).
Figure 6 – Interpreted Carpina North Section A-A', along 6423500mN. Holes oblique to section are not projected to section.
All of the drill-holes completed at Carpina North intersected a sequence of massive, fine-grained
phyllites with occasional psammite interbeds, and the mineralisation appears to be visually
associated with intermittent quartz veining hosting polymetallic (galena-chalcopyrite-arsenopyrite)
sulphides and silica flooding of psammite sequences (Figure 7).
8
Figure 7 – RC chip samples from CNRC0014, 206-212m down-hole, displaying quartz veining and silica flooding.
The gold mineralisation has geochemical associations with arsenic (As) and antimony (Sb). These
element associations, together with the visual quartz textures, suggest that Talisman’s drilling has
intersected the “mixing” zones of a low-sulphidation epithermal gold mineral system, similar to that
mined previously at Mount Boppy, which lies approximately 90km to the north-east in a similar
structural position within the Cobar Basin’s eastern margin.
Interpretation of the current drill results is ongoing, with further drilling planned to be undertaken in
the second half of 2023 once the required regulatory approvals are received.
Stella Prospect
At the Stella Prospect (Figure 1), two trends of anomalous chargeability response were identified
during the quarter through Pole-Dipole Induced Polarisation (PDIP) surveys (Figure 8) 10. An initial
five RC holes for a total of 1,326 metres were drilled, targeting both the Eastern and Western
anomalies to determine the source of the chargeability response (Figure 9). The drill-holes were
targeted on four areas of the chargeable anomaly thought to be discrete chargeable features.
10
Refer Talisman ASX announcement dated 8 May 2023 for full details including JORC tables.
9
Stella Prospect
Eastern Anomaly
Stella Prospect
Western Anomaly
IP Chargeability millivolts per volt (mV/V)
0m
Scale
400m
800m
Figure 8 - Stella Prospect, Pole-Dipole IP survey lines and chargeability pseudo-sections at 400m line spacing with the Eastern and
Western anomaly trends indicated.
All holes, WLRC0001-WLRC0005, intersected a thick sequence of massive phyllites with
disseminated pyrite-pyrrhotite, thought to be the source of the chargeable anomaly.
Figure 9 - Stella Prospect RC drilling and copper assay results.
10
Visual chalcopyrite mineralisation was identified in WLRC0004 over a two-metre interval from 282m,
with the chalcopyrite hosted in a quartz breccia associated with local sericitization. WLRC0005 was
drilled on a shallower angle and was expected to intersect an interpreted vertical mineralised
structure above this mineralisation, however no comparable visual interval was intersected.
WLRC0005 did intersect Pb-Zn mineralisation at end-of-hole which remains open at depth, returning
2m @ 0.44% Zn, 0.21% Pb.
DHEM surveying on WLRC0001-WLRC0004 did not identify significant conductors in close proximity
to the drill-holes. This is consistent with visual observations of copper mineralisation and sulphides
as being disseminated or breccia-hosted with insufficient connectivity to return a conductive
response.
These initial results confirm the presence of north-south trending copper mineralisation at the Stella
Prospect associated with the chargeable anomaly trend and are encouraging for the presence of
copper mineralisation laterally and at depth.
A historical copper mine working is located immediately to the south of the current drilling along the
same north-south trend (Figure 9), which anecdotally yielded a head grade of 17.25% copper from
mineralisation hosted in quartz breccia 11.
A grid of 197 auger geochemistry holes was completed across the prospect focused on the anomaly
trends, returning widespread low-grade base metal anomalism across the western anomaly.
Additional interpretation of the data will be conducted in the coming quarter to support drill targeting
across the Stella Prospect area.
Exploration Licence 8414 (Mayo, Kildare & VTB3_19 AEM & Galway AGG Anomalies)
On Exploration Licence 8414 (EL8414) (Figure 1), three AEM anomalies and one AGG anomaly,
identified from Talisman’s previous regional-scale airborne geophysical surveys1, were drill tested
with seven holes for a total of 1,652 metres8 (Figure 10).
The AEM anomalies were moderate priority anomalies which indicated mid-time conductivity
responses, and also exhibited highly deformed geological structure and quartz veining in outcrop
with anomalous bismuth in open file surface geochemistry, making them targets of interest.
Drilling at each AEM anomaly did not encounter notable down-hole geochemistry results, alteration
or structure8. The basement rocks encountered in drilling were a sequence of variable
conglomerates, sandstones and siltstones. Subsequent DHEM surveying also did not identify any
significant anomalies and it is thought that these initial AEM anomalies were representative of minor
stratigraphic contacts within the basement sequence.
Drilling at the Galway AGG anomaly did not directly explain the AGG anomaly, however a sequence
of siliceous sandstones with minor quartz-carbonate veining was encountered8. The Company’s
interpretation is that the gravity anomaly is likely to be representative of a porphyritic intrusion
associated with the Mount Walton porphyry, located 1km to the west.
11
Refer GNSW DiGS Report R00011195, Explanatory Notes GS1980/452, Mine data sheets to accompany the Nymagee 1:250,000 metallogenic
map.
11
Figure 10 - EL8414 RC drilling, ground geophysics and auger drilling.
Auger drilling was underway on the Tyrone Prospect at quarter end, with the drilling grid completed
subsequent to the end of the quarter and a total of 313 samples taken (Figure 10). Samples will be
processed to generate geochemical anomalies across this prospect area. Eight PDIP geophysical
survey lines were completed across a north-south geophysical trend on the west side of the
exploration licence area screening for chargeable anomalies associated with sulphide mineralisation
bodies. Analysis and interpretation of these results is continuing.
12
Exploration Licence EL8658 (The Pines & Rainbow Folds AEM Anomalies)
On Exploration Licence 8658 (EL8658) (Figure 1), two AEM anomalies were tested at the Pines and
Rainbow Folds prospects (Figure 11). These anomalies were discrete late-time AEM responses
which were strong Maxwell plate models.
The anomalies were located in areas hosting metamorphosed siltstones and conglomerates.
Mapping of the areas identified brecciated quartz veins and weak iron alteration at surface,
suggestive of the weathering of sulphide-bearing quartz stockworks.
The Pines AEM Anomaly
Two RC holes for a total of 504 metres (BBRC0006 and BBRC0007) were drilled into the AEM
response at the Pines. No significant intercepts were returned, however favourable quartz vein
textures and alteration were observed down-hole in BBRC00068. This included stockwork quartz
veining, pervasive silicification, moderate chloritization and both disseminated and blebby pyrrhotite
and pyrite associated with increased magnetism, suggesting that this hole is proximal to a zone of
structurally controlled hydrothermal activity potentially linked to further polymetallic mineralisation.
A definitive source for the Maxwell plate model at the Pines prospect was not intersected and downhole electromagnetic surveys were inconclusive due to both holes collapsing prior to the survey.
Further work on the wider Pines prospect area is planned and will involve drill testing of a subtle
magnetic feature 220m south-west of existing drilling, which is interpreted to be associated with
pyrrhotite mineralisation. Additional discrete magnetic “bullseye” anomalies nearby will also be drill
tested for the presence of sulphide mineralisation.
Rainbow Folds AEM Anomaly
At the Rainbow Folds prospect, two RC holes (BBRC0008 and BBRC0009) for 492 metres were
drilled. Both holes intersected a graphitic shale unit closely associated with the modelled AEM plate,
which is thought to be the source of the strike-parallel AEM anomaly8. No additional work is planned
at this prospect at this stage, with other targets being prioritised.
Geophysical Surveys
Six PDIP geophysical lines were conducted across the Elaine Copper Prospect and the Donegal
Prospect, screening for base metal mineralisation associated with sulphide orebodies (Figure 11).
The Elaine Copper Prospect covers two historical small-scale shafts with a grab sample taken from
spoil piles at surface assaying above 1% copper 12. Analysis and interpretation of results is continuing
in order to generate targets for further work.
12
Refer Talisman ASX Announcement dated 16 November 2022 for full details including JORC tables.
13
Figure 11 - EL 8658 RC drilling and geophysical survey lines.
14
Exploration Licence 8615 (Rip & Tear and Gwando Prospects)
Rip & Tear Prospect
The Rip & Tear Prospect is located on a major north-east to south-west structural lineament on
Exploration Licence 8615 (EL8615). The area is dominated by sandstones to conglomerates of the
Girilambone Group and shallow-water Kopyje Shelf and has seen previous shallow exploration
focused on a historical working and three outcropping gossans in the area.
Extensive historical surface geochemistry and auger drilling indicated strong lead anomalies 13,
similar to those associated with the Federation and Dominion discoveries. Despite significant surface
work identifying the lead anomalies, limited historical drilling has been conducted with only two
percussion holes drilled to 60 metres depth in the prospect area.
Two grids of Moving Loop Transient Electro-Magnetic (MLTEM) surveying covering an area of
5.36km2 for 220 stations were collected, followed by a single 3.3km long PDIP line with 100m station
spacing. The exploration model used a Dominion/Federation analogue and surveyed for similar
conductive anomalies with a confirmatory PDIP line to investigate disseminated sulphide potential,
given past geological observations of disseminated base metal sulphides10.
N
Rip & Tear
EM Plate 1
Rip & Tear
IP Chargeability Anomaly
Rip & Tear
EM Plate 2
Interpreted Faults
GSNSW Seamless Geology
Figure 12 - Rip & Tear Anomaly Area (EL8615) with interpreted faults (GSNSW Seamless Geology) and geophysical anomaly locations.
The MLTEM surveys identified two discrete conductive anomalies which were modelled into Maxwell
plates as the best fit for a conductive source. Both plates appear to be associated with mapped
structures, suggesting that the conductive anomalies are potentially linked to structurally controlled
mineralisation using these structures as conduits and depositional sites for sulphides.
Plate 1 is a steeply-dipping, 1200m long plate model with a moderate conductive value of 50
Siemens (S) oriented along the ENE-WSW major structure running through the prospect area
(Figure 12)10. As a second order structure to the regionally significant Mineral Hill Controlling
13
Refer NSW DIGS Report R00022366, Exploration Report, Mineral Hill-Bobadah area.
15
Structure, this structure may be associated with localised base metal mineralisation. The conductivity
value may be indicative of net-textured or brecciated sulphides lacking complete connectivity.
Plate 2 is a NE-SW striking, moderately SE dipping plate model extending over a length of 1,300m
with a moderate conductance value of 50S aligned with a third order structure which also intersects
the Gilmore Suture (Figure 12). This structure also trends towards the Yellow Mountain workings,
where historical Au-Cu-Pb-Zn-Ag mineralisation has been encountered 14.
Additionally, the PDIP line surveyed across the Plate 2 MLTEM area identified a discrete moderately
chargeable anomaly at shallow depth. This anomaly is immediately adjacent to Plate 2’s anomaly
coincident with a topographic high, suggesting an area of basement with silicification possibly related
to hydrothermal fluids and sulphide deposition (Figure 12)10.
Talisman will proceed to drill test both chargeable anomalies and the conductive anomaly to
determine the potential source of each. Further ground geophysics will be conducted across the
prospect in the coming weeks to acquire magnetic and gravity data to aid drillhole targeting. Drilling
is expected to commence in Q3 2023, following regulatory approvals.
Gwando Prospect – Auger Drilling
A wide spaced auger geochemistry program was conducted across the Gwando Prospect
(approximately 7km NE of the Rip & Tear Prospect) with a total of 253 samples collected from an
average depth of 2.85 metres. The program aims to identify geochemical responses from regolith
which can be used to vector towards base metal mineralisation and target further exploration. Assays
have been dispatched to the laboratory and results are currently awaited.
Project Acquisition – Mabel Creek IOCG Project, South Australia
During the quarter, Talisman completed the Sale and Purchase Agreement (SPA) with First Au
Limited (ASX: FAU) for the purchase of the Mabel Creek IOCG Project (MCIP) in the Gawler Craton
of South Australia 15. Under the SPA, Talisman has acquired a 100% interest in Exploration Licences
EL6619, EL6620 and EL6627, covering a combined contiguous area of 1,048km2 in the underexplored northern Gawler Craton (Figure 13).
14
15
Refer to NSW DIGS Open file reports R0009421, RE0003757, R00024525 and R00024537.
Refer Talisman ASX announcement dated 30 January 2023 for full details.
16
Figure 13 - Location map of Mabel Creek Project, South Australia.
Final approval was received during the quarter for transfer of the MCIP Exploration Licences to
Talisman, and the full consideration detailed in the SPA has been paid to FAU.
This strategic acquisition is located 130km to the north-west of the Prominent Hill Mine operated by
Oz Minerals (ASX: OZL) and 40km west of Coober Pedy, making the MCIP a logically straightforward
area to explore using existing infrastructure at Coober Pedy as a base. The Project tenements span
a major deep-seated east-west trending fault system which is interpreted to host multiple intrusive
lithologies, including the Hiltaba Granite Suite, theorised as instrumental in the genesis of
mineralisation at Olympic Dam.
Negotiations have commenced with the Antakirinja Matu-Yankunytjatjara Aboriginal Corporation
(AMYAC), the authorised representatives of the Antakirinja Matu-Yankunytjatjara People as the
Native Title Claimants to the area, on a Native Title Land Access Agreement (LAA). The successful
negotiation of the LAA will enable Talisman to commence planning of on-ground exploration
activities.
Lucknow Gold Project, NSW
No ground-based exploration was completed at the Lucknow Gold Project (Appendix 3) during the
quarter. Planning and initial land access commenced for a potential 2-hole diamond drill program
targeting theorised structural extensions of high-grade gold mineralisation at the St Aignan’s lode in
the Lucknow Gold Field. This drill program is scheduled to commence in the second half of 2023
17
Corporate
Iron Ore Royalty
During the quarter, Talisman received $2.25 million in royalty payments from iron ore sales that
occurred between 1 March 2023 and 31 May 2023 from Wonmunna Iron Ore Pty Ltd (Wonmunna),
a wholly owned subsidiary of Mineral Resources Limited (ASX: MIN, MRL), the owner and operator
of the Wonmunna Iron Ore Mine (WIOM) in the Pilbara region of Western Australia2. An additional
royalty payment of $0.53 million was received subsequent to quarter-end for iron ore sales from
WIOM that occurred during the month of June 2023.
The increase in iron ore royalty receipts for the current quarter reflects the impact of higher global
iron ore pricing on both WIOM sales made during the quarter and final price adjustments on iron ore
sales made in the previous quarter, in accordance with Wonmunna sales contracts.
Since the commencement of iron ore production at the WIOM in March 2021, total royalty payments
of $15.1 million have been received by Talisman as at the date of this announcement.
New Project Opportunities
During the quarter, Talisman continued to review potential mineral growth opportunities in Australia
and elsewhere. Talisman continues to adopt a judicious approach to the review of all growth
opportunities to ensure only value-accretive transactions that have the potential to create long-term
shareholder value are pursued.
Cash Balance
As at 30 June 2023, Talisman had $9.8 million cash available for its operating and investing
activities.
Expenditure on mining exploration activities
In accordance with ASX Listing Rule 5.3.1, the Company advises its exploration and evaluation
expenditure during the June 2023 quarter totalled $1,747,000. This amount is included at Item 1.2(a)
of the Appendix 5B and relates to activities undertaken on the Company’s Lachlan Copper-Gold and
Lucknow Gold Projects. Expenditure during the quarter included RC drilling, assaying, geophysical
surveying, auger drilling, geological mapping activities, tenement management, and exploration
activity planning.
Payments to related parties of the entity and their associates
In accordance with Section 6.1 of the June 2023 quarter Appendix 5B, Talisman provides the
following in relation to payments made during the quarter to related parties:
Description
Directors Fees
Ends
$A’000
67
Explanation
Short term and post-employment benefits paid to non-executive
directors.
For further information, please contact:
Shaun Vokes – CEO
on +61 8 93804230
Nicholas Read (Media inquiries)
on +61 419 929 046
This release has been authorised by the Board of Talisman Mining Limited.
18
About Talisman Mining
Talisman Mining Limited (ASX:TLM) is an Australian mineral development and exploration company. The Company’s aim is to
maximise shareholder value through exploration, discovery and development of complementary opportunities in base and
precious metals.
Talisman has secured tenements in the Cobar/Mineral Hill region in Central NSW through the grant of its own Exploration Licenses
and through a joint venture agreement. The Cobar/Mineral Hill region is a richly mineralised district that hosts several base and
precious metal mines including the CSA, Tritton, and Hera/ Nymagee mines. This region contains highly prospective geology that
has produced many long-life, high-grade mineral discoveries. Talisman has identified a number of areas within its Lachlan Cu-Au
Project tenements that show evidence of base and precious metals endowment which have had very little modern systematic
exploration completed to date. Talisman believes there is significant potential for the discovery of substantial base metals and
gold mineralisation within this land package and is undertaking active exploration to test a number of these targets.
Talisman also has a majority participating interest in a joint venture with privately-owned Lucknow Gold Limited in relation to the
Lucknow Gold Project (EL6455) in New South Wales. The Lucknow Goldfield was discovered in 1851 and was one of the earliest
goldfields to be mined commercially in Australia. Historic production records at the Project are incomplete, however in excess of
400,000 ounces of gold has reportedly been produced at grades of 100 to 200 g/t gold 16.Very little modern exploration has been
completed outside of the existing mine workings and Talisman intends to undertake a program of geochemical surface sampling
and mapping at the Project ahead of a drilling program to test for potential down plunge extensions of the high-grade gold ore
shoots and repeat structures throughout the Project area.
Competent Person’s Statement
In
Share your feedback
Discover