Initial AC Results Confirm Prospectivity of East Peak Hill
Released
Released
Announcement PDF
Talisman Mining | Suite 1, Ground Floor, 33 Colin St, West Perth 6005
ABN 71079 536 495 talismanmining.com.au
ASX:TLM 7April2026
ASX Announcement
1
Tomingley Gold Project – Geological Setting and Mineralisation. Chalmers, Ransted, Kairatis and Meates 2015.
2
Tomingley Gold Operations – Mineral Resource Statement 30 June 2025
1
Initial air-core drill results confirm prospectivity of
East Peak Hill gold prospect, NSW
Maiden drilling returns anomalous zones and strong indicators of potential for a large-scale gold
system adjacent to the Peak Hill and Tomingley gold districts
Highlights:
Macquarie Projects, NSW
East Peak Hill
• Maiden 5,546m, seven line, 95-hole air-core drilling (AC) program completed at the East Peak Hill (EPH)
Prospect in NSW.
• EPH sits adjacent to the Tomingley and Peak Hill gold district (1.36Moz at 2.2g/t Au), which is currently
being mined by Alkane Resources (ASX: ALK)1 2
.
• The AC drilling tested a 4.5km long trend of interpreted intrusive rocks within the highly prospective
Junee-Narromine Volcanic Belt – host to several major gold and copper-gold deposits.
• Initial results from Line 2, indicate both anomalous gold and promising pathfinder minerals on the
eastern contact of this belt, with a similar structural position and geochemical signature to the
mineralisation at the nearby Tomingley Operations.
• Assay results are awaited for the remaining lines, for targets tested further south, which include
interpreted porphyry and andesitic intrusion positions.
Talisman Mining (ASX: TLM, ‘Talisman’ or ‘the Company’) is pleased to advise that it has completed a maiden 95-
hole, seven line, 5,546m air-core (AC) drilling program (Figure 1 and Figure 2) at its East Peak Hill Project, located
approximately 70km south-west of Dubbo in NSW (Figure 2), with the first batch of assay results received.
East Peak Hill Gold Project (EL 9395) – Background
The East Peak Hill Gold Project contains an interpreted andesitic intrusion outlined by anomalous magnetic
features interpreted from detailed magnetic imagery, as shown in Figure 3.
In 2025, Talisman commenced a first pass Auger sampling program to test for presence of pathfinder elements
known to be linked to the targeted gold mineralisation. At the nearby Tomingley Project, owned by Alkane
Resources (1.36Moz at 2.2g/t gold)1,2
pathfinder elements are used extensively in exploration to highlight
prospective locations for gold mineralisation.
The Talisman Auger drill program was partially successful. Many of the Auger holes did not reach the basement
target due to deeper-than-expected barren transported cover. Those Auger holes that did reach the top of the
underlying basement, recorded anomalous pathfinder minerals – arsenic, antimony, bismuth, copper and
molybdenum that are associated with the target gold mineralisation – on both the western side and eastern side
of the interpreted intrusive rocks.
4August2024
ASX Announcement
The recently completed AC drilling program was designed to test the area of the interpreted gold mineralised
target zone with broad, regional scale, 400m and 800m line spacing, as an initial test of the target prospectivity.
Figure 1. Wallis Drilling AC drilling rig operating at the East Peak Hill Prospect.
AC Program Details
The recently completed air-core program (AC) consisted of seven east-west lines of AC drill fences to test the
postulated north-south magnetic features, covering a strike length of approximately 4.5km. These features
contain a number of north-northeast trending structures which are seen as key to the emplacement of gold
mineralisation in the district.
This work was completed with Wallis Drilling’s Mantis100 rig, shown in Figure 1.
The key specifications of the AC drilling program are summarised below:
- E-W drill grid (orthogonal to stratigraphy & interpreted structure/mineralisation).
- Holes drilled to blade refusal (estimated 50m-80m depth).
- Holes inclined at 60 degrees, drilled towards 270o
(grid west).
- Nominal 80m x 800m spaced drilling initially, with potential to in-fill to 400m spacing as results and
geology dictate, as shown on Figure 3.
- 3m composite samples with 25g Aqua Regia for gold and a range of multi-elements.
- Bottom-of-hole samples with comprehensive multi-element assays.
- Barren surface cover was intersected from surface to approximately 10m to 30m down-hole.
4August2024
ASX Announcement
Figure 2. Regional geology plan of the Junee-Narromine Volcanic Belt illustrating the gold and copper-gold
deposits of the region. Talisman tenure in the belt consists of three EL’s. The East Peak Hill Project is located on
EL 9395, approximately 10km south-east of the Tomingley Gold Operation.1
4August2024
ASX Announcement
AC Program Results and Interpretation
To date, assays have been returned for the three northern most lines of AC drilling (Lines 1 to 3, holes EPAC0001
to EPAC0043). See Figure 3.
These lines tested de-magnetised positions that sit adjacent to the interpreted, strongly magnetic Andesite
intrusions (those zones in red in the central part of Figure 3). In addition, Line 2 also tested the interpreted position
of the Mingelo Volcanics/Cotton Formation contact in the east. Line 3 and Line 4 were unable to test the
prospective Mingelo Volcanics/ Cotton Formation contact as planned due to temporary access issues requested
by the landowner. Line 3 and Line 4 will be extended east in the follow up phase of drilling.
Figure 3. AC drilling program at East Peak Hill over regional magnetics and structural interpretation. Magnetic
highs are generally associated with Andesitic sills within the Mingelo Volcanic sequence. Anomalous pathfinder
and gold mineralisation in Line 2 is associated with Mingelo Volcaniclastic/Cotton Formation sediments contact
on the eastern side of the drill line.
4August2024
ASX Announcement
On Line 2, three consecutive drill holes EPAC0001 to EPAC0003 intersected a zone of sericite-carbonate
alteration of Volcaniclastic rocks with significant elevated gold, silver, arsenic and antimony anomalism. This
style of alteration, metal anomalism and structural position is analogous to the Tomingley style mineralisation
located approximately 10km north-west of the current drilling.
These holes sit adjacent to the contact between the interpreted Mingelo Volcanic rocks containing a number of
andesitic intrusions to the west and the Cotton Formation sediments to the east intersected in EPAC0038 and
EPAC0039. See Figure 4.
Significant intersections are summarised in Table 1 and illustrated in Figure 4.
Figure 4. AC drilling at East Peak Hill cross section Line 2. See Figure 3 for location. Assay results show a broad
zone of alteration, anomalous in Au, As, Ag and Sb in holes EPAC0001 and EPAC0003
Hole ID From To Width (m) Au ppm Ag ppm As ppm Sb ppm
EPAC0001 51 60 9 0.22 0.23 837 50.6
EPAC0003 33 42 9 0.67 0.09 1582 62.2
including 33 36 3 1.75 0.07 3030 107.5
Table 1. East Peak Hill AC drilling significant intersection Summary. Assay results +0.1ppm Au with maximum
3m internal dilution.
4August2024
ASX Announcement
Yarindury Copper-Gold Project (EL 9679)
In late 2025 and early 2026 the Company completed two drill holes for 930.6m of mud rotary and diamond
drilling at the East Yarindury target testing buried Induced Polarisation-Magneto Telluric (IP-MT) anomalies
below approximately 200m (in hole) of cover within the Molong belt approximately 20km north-east of Dubbo in
NSW. See ASX announcement 4 December 2025.
Assay results from the two completed holes YRMRD0002 and YRMRD0003 have been returned with no
significant copper or gold intersections encountered. See Table 2 for drill hole details.
Drill hole core samples are however, being characterised for alteration studies to be used as an exploration
vector towards potentially mineralised positions.
Hole_ID Easting Northing RL Dip Azi EoH
Depth
YRMRD0001 682874 6435007 367 -89.53 312.19 562.7
YRMRD0002 687056 6439066 325 -58.19 217.91 516.5
YRMRD0003 686568 6438259 323 -60.07 217.65 414.1
Table 2. Yarindury diamond drilling hole Summary.
Management Comment
Talisman’s Managing Director, Andrew Munckton, said:
“The recently completed air-core drilling program at East Peak Hill was designed to target a series of interpreted
andesitic intrusions and the highly prospective volcaniclastic/sediment contact in the east, where limited soil
geochemistry has defined anomalous pathfinder minerals at the edges of the interpreted intrusive bodies.
“These intrusions – and their sheared and faulted contacts with the surrounding rocks – host a number of
significant gold deposits at the nearby Tomingley Gold Mine, operated by Alkane Resources.
“The broad 400m and 800m spaced lines of AC drilling have provided an initial test of the target, which is
interpreted as being analogous to the Tomingley structural position and mineralisation style.
“Line 2 of the initial three lines of seven drilled have returned anomalous assay results, in AC drilling of the oxidised
portion of the geological profile. The intersections recorded in EPAC0001 and EPAC0003 shows ore grade gold
mineralisation located in the targeted structural position coincident with an important geological contact. These
results demonstrate this zone is a fertile location for orogenic gold mineralisation.
“The assay results in holes EPAC0001 and EPAC0003 show that the alteration and mineralisation intersected at
East Peak Hill appears to be very similar to the nearby Tomingley-style gold mineralisation and alteration.
“The remaining four lines of AC drilling located further south also test this prospective contact position. We look
forward to receiving assay results for these remaining lines which are expected in the next 3-4 weeks.”
–– Ends ––
For further information, please contact:
4August2024
ASX Announcement
Andrew Munckton - Managing Director
+61 4 3563 5598
Nicholas Read (Media inquiries)
+61 4199 29046
This release has been authorised by the Board of Talisman Mining Limited.
Hole ID Easting Northing RL Dip Azi EoH
Depth
EPAC0001 619450 6378650 302 -60 270 61
EPAC0002 619390 6378647 303 -60 270 61
EPAC0003 619335 6378658 304 -60 270 52
EPAC0004 619280 6378660 305 -60 270 54
EPAC0005 619224 6378661 305 -60 270 64
EPAC0006 619159 6378665 300 -60 270 57
EPAC0007 619096 6378664 298 -60 270 51
EPAC0008 619046 6378664 299 -60 270 45
EPAC0009 619005 6378668 295 -60 270 54
EPAC0010 618953 6378670 295 -60 270 54
EPAC0011 618899 6378674 294 -60 270 69
EPAC0012 618847 6378680 295 -60 270 58
EPAC0013 618772 6378683 293 -60 270 42
EPAC0014 618733 6378683 292 -60 270 31
EPAC0015 618708 6378685 294 -60 270 40
EPAC0016 618660 6378677 294 -60 270 30
EPAC0017 618632 6378690 292 -60 270 34
EPAC0018 618600 6378690 295 -60 270 24
EPAC0019 618574 6378692 295 -60 270 28
EPAC0020 618546 6378694 295 -60 270 39
EPAC0021 618509 6378695 295 -60 270 35
EPAC0022 618435 6378702 295 -60 270 69
EPAC0023 618374 6378707 295 -60 270 64
EPAC0024 618309 6378703 295 -60 270 78
EPAC0025 618243 6378715 296 -60 270 57
EPAC0026 618180 6378711 298 -60 270 81
EPAC0027 618133 6378715 298 -60 270 72
EPAC0028 618733 6379029 295 -60 270 27
EPAC0029 618702 6379029 295 -60 270 36
4August2024
ASX Announcement
EPAC0030 618668 6379034 295 -60 270 45
EPAC0031 618629 6379032 295 -60 270 51
EPAC0032 618529 6379023 295 -60 270 63
EPAC0033 618464 6379029 295 -60 270 70
EPAC0034 618397 6379029 295 -60 270 63
EPAC0035 618340 6379031 295 -60 270 69
EPAC0036 618278 6379033 297 -60 270 75
EPAC0037 618208 6379030 297 -60 270 66
EPAC0038 619497 6378649 305 -60 270 72
EPAC0039 619563 6378648 305 -60 270 75
EPAC0040 619261 6378199 305 -60 270 72
EPAC0041 619179 6378204 304 -60 270 64
EPAC0042 619110 6378197 300 -60 270 63
EPAC0043 619037 6378196 297 -60 270 72
EPAC0044 619204 6377597 305 -60 270 64
EPAC0045 619112 6377624 305 -60 270 63
EPAC0046 619047 6377657 305 -60 270 65
EPAC0047 618942 6377676 300 -60 270 45
EPAC0048 618781 6377598 300 -60 270 54
EPAC0049 618718 6377602 300 -60 270 44
EPAC0050 618588 6377595 300 -60 270 43
EPAC0051 618529 6377597 300 -60 270 58
EPAC0052 618396 6377601 305 -60 270 28
EPAC0053 618351 6377603 305 -60 270 13
EPAC0054 618300 6377601 305 -60 270 9
EPAC0055 618249 6377605 305 -60 270 8
EPAC0056 618203 6377602 305 -60 270 26
EPAC0057 618153 6377602 304 -60 270 39
EPAC0058 618104 6377602 298 -60 270 46
EPAC0059 619920 6376143 323 -60 270 63
EPAC0060 619866 6376142 319 -60 270 57
EPAC0061 619797 6376172 318 -60 270 61
EPAC0062 619758 6376193 318 -60 270 53
EPAC0063 619625 6376150 314 -60 270 69
EPAC0064 619566 6376148 314 -60 270 70
EPAC0065 619490 6376150 308 -60 270 86
EPAC0066 619401 6376152 308 -60 270 67
4August2024
ASX Announcement
EPAC0067 619331 6376151 308 -60 270 81
EPAC0068 619253 6376150 308 -60 270 69
EPAC0069 619851 6375454 323 -60 270 60
EPAC0070 619790 6375448 322 -60 270 69
EPAC0071 619717 6375454 318 -60 270 69
EPAC0072 619649 6375453 316 -60 270 69
EPAC0073 619576 6375458 316 -60 270 69
EPAC0074 619511 6375458 315 -60 270 51
EPAC0075 619461 6375462 315 -60 270 45
EPAC0076 619396 6375458 315 -60 270 75
EPAC0077 619320 6375464 313 -60 270 78
EPAC0078 619248 6375466 310 -60 270 58
EPAC0079 619169 6375464 310 -60 270 67
EPAC0080 619915 6375454 325 -60 270 63
EPAC0081 619980 6375454 325 -60 270 72
EPAC0082 619771 6374629 325 -60 270 72
EPAC0083 619702 6374633 324 -60 270 78
EPAC0084 619630 6374632 323 -60 270 64
EPAC0085 619572 6374627 320 -60 270 58
EPAC0086 619520 6374628 320 -60 270 70
EPAC0087 619460 6374630 320 -60 270 61
EPAC0088 619401 6374632 320 -60 270 87
EPAC0089 619324 6374632 318 -60 270 81
EPAC0090 619246 6374634 317 -60 270 84
EPAC0091 619163 6374632 315 -60 270 74
EPAC0092 619086 6374632 315 -60 270 68
EPAC0093 619013 6374630 315 -60 270 81
EPAC0094 619831 6374632 325 -60 270 71
EPAC0095 619886 6374616 325 -60 270 84
Table 3. East Peak Hill AC drilling hole Summary.
About Talisman Mining
Talisman Mining Limited (ASX: TLM) is an Australian mineral development and exploration company. The
Company’s aim is to maximise shareholder value through exploration, discovery and development of
complementary opportunities in base and precious metals.
Talisman has secured tenements in the Cobar/Mineral Hill region in Central NSW through the grant of its own
Exploration Licenses. The Cobar/Mineral Hill region is a richly mineralised district that hosts several base and
4August2024
ASX Announcement
precious metal mines including the CSA, Tritton, and Hera/Nymagee mines. This region contains highly
prospective geology that has produced many long-life, high-grade mineral discoveries. Talisman has identified
several areas within its Lachlan Cu-Au Project tenements that show evidence of base and precious metals
endowment which have had very little modern systematic exploration completed to date.
Talisman also has a significant tenement holding in both the Molong and Junee-Narromine belts within the
Macquarie Arc geological domain. The Macquarie Arc hosts several of Australia’s largest gold and copper-gold
discoveries and operations including, Cadia Valley, North Parkes, Cowal and Tomingley. Talisman believes there
is significant potential for the discovery of substantial copper and gold mineralisation within this land package
and is undertaking active exploration to test a number of these targets.
Competent Person’s Statement
Information in this announcement that relates to Exploration Results and Exploration Targets is based on and
fairly represents information and supporting documentation compiled by Mr Andrew Munckton, who is a
member of the Australasian Institute of Mining and Metallurgy. Mr Munckton is a full-time employee of Talisman
Mining Ltd and has sufficient experience which is relevant to the style of mineralisation and types of deposits
under consideration and to the activities undertaken to qualify as a Competent Person as defined in the 2012
Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr
Munckton has reviewed the contents of this announcement and consents to the inclusion in this announcement
of all technical statements based on his information in the form and context in which they appear.
Forward-Looking Statements
This ASX release may include forward-looking statements. These forward-looking statements are not historical
facts but rather are based on Talisman Mining Ltd.’s current expectations, estimates and assumptions about the
industry in which Talisman Mining Ltd operates, and beliefs and assumptions regarding Talisman Mining Ltd.’s
future performance. Words such as “anticipates”, “expects”, “intends”, “plans”, “believes”, “seeks”,
“estimates”, “potential” and similar expressions are intended to identify forward-looking statements. Forward-
looking statements are only predictions and are not guaranteed, and they are subject to known and unknown
risks, uncertainties, and assumptions, some of which are outside the control of Talisman Mining Ltd. Past
performance is not necessarily a guide to future performance and no representation or warranty is made as to
the likelihood of achievement or reasonableness of any forward-looking statements or other forecast. Actual
values, results or events may be materially different to those expressed or implied in this presentation. Given
these uncertainties, recipients are cautioned not to place reliance on forward looking statements. Any forward-
looking statements in this announcement speak only at the date of issue of this announcement. Subject to any
continuing obligations under applicable law and the ASX Listing Rules, Talisman Mining Ltd does not undertake
any obligation to update or revise any information or any of the forward-looking statements in this
announcement or any changes in events, conditions, or circumstances on which any such forward looking
statement is based.
4August2024
ASX Announcement
Appendix 2
JORC Tables Section 1 & 2
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down-hole gamma
sondes, or handheld XRF instruments, etc.).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
• Aspects of the determination of mineralisation
that are Material to the Public Report. In
cases where ‘industry standard’ work has
been done this would be relatively simple
(e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3kg was
pulverised to produce a 30 g charge for fire
assay’). In other cases, more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed
information.
TLM Auger Drilling
• Auger samples are collected as one or two metre interval
from bottom of hole via a drill rig mounted Auger drill to
obtain Top of Basement sample
• The Top of Basement sample is sieved to 2mm to obtain a
nominal 1.0kg sample which was collected in a pre-
numbered sample bag.
• Auger samples undergo routine pXRF analysis using an
Olympus Vanta M-series to aid in logging and identifying
zones of interest.
• Sampling is controlled by Talisman protocols and QAQC
procedures as per industry standard and a chain of custody
maintained through transfer to ALS Laboratories in
Adelaide, SA.
• Auger samples were dried, crushed (where required), split
and pulverised (total prep) to produce a master pulp. From
this master pulp, a 0.25g sub sample was taken for multi-
element analysis by four acid digest, with an ICP-MS finish.
A 50g sub sample was also taken for fire assay for gold
with ICP-AAS finish.
TLM AC Drilling
• AC samples are collected at three metre intervals via a drill
rig mounted cyclone and static cone splitter set to a 12%
split to produce a nominal 4-7kg sample which was
collected in a pre-numbered sample bag.
• AC samples undergo routine 3 metre composite pXRF
analysis using an Olympus Vanta M-series to aid in logging
and identifying zones of interest.
• Sampling is controlled by Talisman protocols and QAQC
procedures as per industry standard and a chain of custody
maintained through transfer to ALS Laboratories in
Adelaide, SA.
• AC samples were dried, crushed (where required), split
and pulverised (total prep) to produce a master pulp. From
this master pulp, a 25g sub sample was taken for aqua
regia gold and multi-elements.
TLM MR/DD Drilling
• TLM’s diamond core samples are HQ3 in diameter and are
cut either in half or one-third longitudinally using an
automated Almonte core saw. Core is held securely in
boats during cutting to maintain sample integrity. Sample
intervals ranged from 0.3 to 1.3m in length, with most
samples aligned to 1m intervals or adjusted to honour
geological contacts.
• TLM diamond core sampling is controlled by protocols and
4August2024
ASX Announcement
Criteria JORC Code explanation Commentary
QAQC procedures as per industry standard and a chain of
custody maintained through transfer to ALS Laboratories in
Adelaide, SA.
• TLM diamond samples are dried, crushed (where
required), split and pulverised (total prep) to produce a
master pulp. From this master pulp, a 0.25g sub sample
was taken for multi-element analysis by four acid digest
with an ICP-MS finish (ME-MS61) and analysis for Rare
Earths (MS61L-REE). A 30g sub sample was also taken for
fire assay for gold with ICP- AAS finish.
Drilling
techniques
• Drill type (e.g. core, reverse circulation, open-
hole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (e.g. core diameter,
triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether
core is oriented and if so, by what method,
etc).
TLM Auger drilling
• AC drilling between 2m and 15m to obtain the top of
Basement sample
TLM AC drilling
• AC drilling cited in this report was undertaken by Wallis
Drilling Pty Ltd using a Mantis 100 drill rig. A truck-mounted
compressor provided air where ground conditions
warranted.
• AC drilling was completed with a face sampling blade of
nominal 120mm size.
TLM MR/DD Drilling
• Undertaken by DDH1 Drilling Pty LTD using a
Multipurpose UDR1200 truck mounted rig. The core is
orientated except where holes are vertical holes.
Drill sample
recovery
• Method of recording and assessing core
and chip sample recoveries and results
assessed.
• Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
• Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
TLM Auger Drilling
• Auger drill sample recovery is generally moderate to high
with sample recoveries and quality recorded in the
database by the Auger operator.
• Sample recoveries were monitored in real-time by the
presence of Talisman personnel at the drill site.
• No known relationship exists between recovery and grade.
• No known bias exists.
TLM AC Drilling
• AC drill sample recovery is generally high.
4August2024
ASX Announcement
Criteria JORC Code explanation Commentary
preferential loss/gain of fine/coarse
material.
• Sample recoveries were monitored in real-time by the
presence of Talisman personnel at the drill site.
• No known relationship exists between recovery and grade.
No known bias exists.
TLM MR/ DD Drilling
• Core recovery data is recorded for each run by
measuring total length of core retrieved against the
downhole interval drilled and stored in the database. TLM
representatives continuously monitor core recovery and
core presentation quality as drilling is conducted and
issues or discrepancies are rectified promptly to maintain
industry best standards.
Logging • Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate
Mineral Resource estimation, mining
studies and metallurgical studies.
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc.) photography.
• The total length and percentage of the
relevant intersections logged.
TLM Auger Drilling
• Auger drilling logging used to identify the appropriate Top
of Basement horizon for sampling
TLM AC Drilling
• AC logging records lithology, mineralogy, mineralisation,
alteration, structure, weathering, colour and other primary
features of the rock samples and is considered to be
representative across the intercepted geological units.
• AC logging is both qualitative and quantitative depending
on the field being logged.
• All AC drill-holes are logged in full at 3m intervals to end of
hole.
• All AC chip trays at 3m intervals are collected,
photographed and then stored onsite in TLM secure
premises.
• All information collected is entered directly into laptop
computers or tablets, validated in the field, and then
transferred to the database. The level of logging detail is
considered appropriate for early-stage exploration.
TLM MR/ DD Drilling
• DD and MR logging are carried out on site once geology
personnel retrieve core trays from the drill rig site. Core is
collected from the rig daily.
• DD/ MR logging records lithology, mineralogy,
mineralisation, alteration, structure, weathering, colour and
other primary features of the rock samples and is
considered to be representative across the intercepted
geological units.
• All DD holes are logged in full to end of hole.
• Drillhole collar coordinates, azimuth, dip, depth and
sampling intervals are recorded. DD logging is to
geological contacts.
• MR/DD logging is both qualitative and quantitative
depending on the field being logged. Logging of diamond
drilling includes geotechnical data, RQD and core
4August2024
ASX Announcement
Criteria JORC Code explanation Commentary
recoveries.
• Drill core is photographed prior to any cutting and/or
sampling and then stored onsite in Talisman Core yard in
Condobolin. Photographs are available for every diamond
drillhole completed.
• Mud Rotary chips are photographed in trays.
• All information collected are entered directly into laptop
computers or tablets, validated in the field, and then
transferred to the database. The level of logging detail is
considered appropriate for exploration and to support
appropriate mineral resource estimation, mining studies,
and metallurgical studies.
Sub-sampling
techniques and
sample
preparation
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube sampled,
rotary split, etc. and whether sampled wet
or dry.
• For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
• Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.
• Whether sample sizes are appropriate to
the grain size of the material being
sampled.
TLM Auger Drilling
• Auger samples were dried, crushed (where required), split
and pulverised (total prep) to produce a 0.25g sub sample
for base metal analysis or a 50g sub sample for gold
analysis by fire assay.
• QAQC protocols for all Auger sampling involved the use of
Certified Reference Material (CRM) as assay standards.
• All QAQC controls and measures were routinely reviewed.
• Sample size is considered appropriate for geochemical
sampling for base-metal and gold mineralisation given the
nature of drilling and anticipated distribution of
mineralisation.
TLM AC Drilling
• AC samples were dried, crushed (where required), split
and pulverised (total prep) to produce a 25g sub sample for
gold and multi-element analysis by aqua regia.
• QAQC protocols for all AC sampling involved the use of
Certified Reference Material (CRM) as assay standards.
• All QAQC controls and measures were routinely reviewed.
• Sample size is considered appropriate for geochemical
sampling for gold and multi-element mineralisation given
the nature of drilling and anticipated distribution of
mineralisation.
TLM MR/DD Drilling:
• Diamond drill core (HQ) samples collected for analysis are
longitudinally cut in half, and quarters for the QAQC
samples using a using an automated Almonte core saw.
Core was placed in boats, holding core in place.
• Half core or quarter core sample intervals typically varies
from 0.3m to 1.3m in length. 1m sample intervals are
favoured and are the most common method of sampling,
however sample boundaries do principally coincide with
geological contacts. The remaining core is retained in core
trays.
• DD samples are dried, crushed (where required), split and
pulverised (total prep) to produce a 0.25g sub sample for
4August2024
ASX Announcement
Criteria JORC Code explanation Commentary
base metal analysis or a 30g sub sample for gold analysis
by fire assay.
• QAQC protocols for all DD sampling involve the use of
Certified Reference Material (CRM) as assay standards.
• All QAQC controls and measures are routinely reviewed.
Sample size is considered appropriate for geochemical
sampling for base-metal and gold mineralisation given the
nature of drilling and anticipated distribution of
mineralisation.
• Field duplicates are collected at a 1 in 30 sample rate.
Quality of assay
data and
laboratory tests
• The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
Share your feedback
Discover