Monty Exploration Update
Released
Released
Announcement PDF
F o c u s e d A u s t r a l i a n M i n e r a l E x p lo r a t i o n C o m p a n y
Monty Exploration Update
th
17 December 2015
Monty Resource drilling well advanced
New regional exploration targets identified
Significant exploration planned at Springfield
Springfield Joint Venture now formed
COMPANY SNAPSHOT
Board of Directors
Alan Senior
Non-Executive Chairman
Gary Lethridge
Managing Director
Brian Dawes
Non-Executive Director
Karen Gadsby
Non-Executive Director
Highlights
• Resource drilling at Monty is now estimated to be over 60% complete. Large
backlog of drillholes awaiting sampling, despatch and assay.
• A maiden Mineral Resource estimate for Monty is anticipated in the New Year.
Contact Details
• High-grade copper intercepts from recent assayed drilling include:
Telephone:
+61 8 9380 4230
TLDD0025
• 9.4 metres grading 7.2% Cu and 2.2g/t Au from 326.0m down-hole
(down-hole width);
Facsimile:
+ 61 8 9382 8200
Email:
info@talismanmining.com.au
TLDD0027
• 1.3 metres grading 11.5% Cu and 2.2g/t Au from 393.5m down-hole
(down-hole width); and
• 10.7 metres grading 6.2% Cu and 2.0g/t Au from 411.0m down-hole
(down-hole width).
Website:
www.talismanmining.com.au
Capital Structure
TLDD0029
• 8.3 metres grading 8.0% Cu and 1.1g/t Au from 173.9 down-hole
(down-hole width).
Shares on Issue:
148,559,904 (TLM)
Options on Issue:
6,400,000 (Unlisted)
ASX: TLM
• Joint Venture between Talisman and Sandfire now formed:
o
o
o
$15 million sole funding by Sandfire now complete (subject to audit of final $5
million exploration expenditure);
Transfer of a 51% joint venture interest to Sandfire underway;
Joint Venture budget of $7.5 million for the 3 month period December 2015 to
February 2016 (inclusive) agreed, including continued resource drilling,
regional exploration activities and preliminary scoping works.
• Significant exploration is underway or planned at the Springfield Project by the
Joint Venture within the period December 2015 to February 2016 including:
o
o
o
o
o
Drilling at the Homer Prospect has now commenced;
Planned RC drilling to the north east of Monty along the prospective Monty
Trend;
RC drilling of geochemical anomalies at Monty South and the Southern
Volcanics is planned;
First pass drilling and assessment of the newly identified Monty Deeps is
planned; and
Planned infill aircore drilling at Monty South and first pass aircore drilling of a
potential structural exploration target in the north east of the Springfield
Project.
Monty Update
Talisman Mining Limited (ASX: TLM, “Talisman”) is pleased to announce that Sandfire Resources NL (ASX:
SFR, “Sandfire”) has provided an update on current and planned exploration activities at the Monty coppergold discovery within the Talisman’s Springfield Project located to the east of the DeGrussa Copper-Gold
Mine (see Appendix 1).
The collar locations of advised holes drilled to date by Sandfire are shown in the plan view diagram below
(see Figure 1) and in Table 1.
Figure 1: Plan view of Monty showing drill-hole collar locations and simplified interpreted geology.
Monty Resource Definition Drilling
Sandfire has advised that resource definition drilling has continued and advanced at Monty with four diamond
drill rigs drilling on double shift. Drilling has been focused on the definition of the Monty Lower Zone
mineralisation and has been aimed at defining the edge and continuity of the mineralisation via an infill
program.
Sandfire has informed Talisman that approximately 8,000 metres of drilling has been completed since the last
ASX Announcement on 5 November 2015. Talisman estimates that approximately 56 drill holes have now
been drilled and that based on the estimated number of planned holes, the resource definition drilling
campaign at Monty is now over 60% complete.
Talisman understands that as a result of the accelerated resource definition drilling over the past two months
and with other recent and ongoing exploration activity across the project, a back log has developed with
respect to the processing and dispatch of diamond drill core from Monty to the assay laboratory for analysis.
As such there are a significant number of assay results for recently completed holes that remain outstanding
at this time.
Monty Update
Sandfire has advised Talisman that recent drilling intercepts are in general visually substantiating initial
interpretations that were based on the wide-spaced initial exploration holes.
Latest assay results (see Table 1) provide further support and assistance in confirming the continuity and
grade of the mineralisation intersected to date at Monty and include the following results from the Lower
Zone:
TLDD0025
•
9.4 metres grading 7.2% Cu and 2.2g/t Au from 326.0m down-hole
(down-hole width);
TLDD0027
•
1.3 metres grading 11.5% Cu and 2.2g/t Au from 393.5m down-hole
(down-hole width); and
•
10.7 metres grading 6.2% Cu and 2.0g/t Au from 411.0m down-hole
(down-hole width).
Drilling has also potentially grown the extents of the mineralisation intersected to date in the Monty Upper
Zone via the result below:
TLDD0029
•
8.3 metres grading 8.0% Cu and 1.1g/t Au from 173.9m down-hole
(down-hole width);
An updated vertical longitudinal projection provided by Sandfire (looking to the south-east) is shown in Figure 2
below, with new assayed intercepts highlighted in yellow.
Figure 2: Vertical Longitudinal Projection and initial interpretation of the Monty Prospect with drill-hole pierce points at
the top of the primary intercept shown in bold. All intercepts are down-hole widths. A significant intersection is defined
here as any intersection ≥ 3m estimated true width that has a grade of ≥ 2.0 % Cu, inclusive of non-mineralised material.
To determine whether intersections that are <3m estimated true width are significant in terms of the above definition,
non-mineralised material has been included at a grade of 0.0% Cu (weighted by width) until a 3m estimated true width is
reached. If the overall grade remained >2.0% Cu, with the non-mineralised material included, then the intersection is
considered significant. New intersections (not previously reported) are highlighted in yellow.
Monty Update
Resource drilling is anticipated to continue through to mid-February on a nominal 40m x 40m pattern with the
results to be used in calculating the maiden Mineral Resource estimate for Monty in the New Year.
Farm-In / Joint Venture Agreement
As announced in Talisman’s September 2015 Quarterly Activities Report, Sandfire has provided Notice that as
of 30 September 2015 it had sole-funded $10 million of exploration expenditure at Talisman’s Doolgunna
projects. Following the satisfactory audit of this expenditure, Sandfire has now formally earned a 51% interest in
the Doolgunna project tenements. Formal transfer of the 51% interest is underway.
Sandfire has recently provided a further Notice stating it has sole-funded a further $5 million of exploration
expenditure in order to earn an additional 19% interest in the Doolgunna projects tenements.
The terms of the original farm-in were in an agreement dated 20 December 2013 (“Farm-in Agreement”) as
announced to the ASX on 20 December 2013. Talisman is currently auditing this claimed expenditure before
formally transferring the 19% interest to Sandfire.
As Sandfire has now reached the $15 million expenditure threshold (project to date) Sandfire’s sole-funding
obligation at Springfield has ceased and an unincorporated Joint Venture has been formed between Talisman
and Sandfire. Talisman will now fund 30 per cent of all expenditure at Springfield, with Sandfire funding the
remaining 70 per cent.
Sandfire has been appointed the initial Manager of the Joint Venture.
The parties are presently negotiating the terms of a Joint Venture Agreement. Pending the entering into of this
agreement, the Farm-in Agreement continues to bind the parties.
The Joint Venture has held its first meeting to approve the budgeted expenditure of $7.5 million on exploration
over the next three months. This programme and budget is commencing December 2015. Talisman’s share of
this approved budget is approximately $2.25 million and an initial cash call has been made and is payable by
31 December 2015.
Planned Regional Exploration Activity – December 2015 to February 2016
Joint Venture activities for December 2015 to February 2016 are planned to include exploration activities in
addition to the continuing definition and infill drilling of the Monty mineralisation.
These planned activities include drilling programs that are stepping further afield and actively targeting
additional accumulations of mineralisation along the 5km long Monty trend and also within the broader
Springfield Project, which remains extremely prospective for further discoveries.
The timing of planned exploration drilling at Springfield outside of the Monty resource drilling is dependent on
the availability of the RC drill rig and its ability to be released from drilling pre-collar holes for the Mineral
Resource definition program.
Monty Deeps
An exploration target outside of the Monty mineralised envelope (Monty Deeps) is planned to be tested for the
potential to host additional massive sulphide accumulations in proximity to the existing Monty Lower Zone
mineralisation.
Monty Update
To date, three holes (TLDD0007, TLDD0008 and TLDD0012) underneath and to the south west of the Monty
Lower Zone have demonstrated the potential continuation of the host VMS exhalative stratigraphy.
Drill hole TLDD0008 (5.1m @ 1.4% Cu and 0.1g/t Au), located approximately 80 metres below the current
interpretation of the Lower Zone Monty mineralised envelope has highlighted the potential for further
mineralisation within the host VMS horizon close to Monty.
Desktop activities and diamond exploration drilling are planned for the first quarter of 2016 in order to provide an
initial test of the potential in this location.
Monty Trend
The Joint Venture plans to complete a broadly spaced RC drilling program along the interpreted strike extension
of the Monty host stratigraphy to the north east of the Monty mineralisation.
Aircore drilling completed along strike from Monty to date has assisted Sandfire to identify the interpreted
continuation of the prospective host stratigraphy along strike from Monty. Reconnaissance RC drilling is
planned to test for the continuation of the Monty host horizon in the New Year. This reconnaissance exploration
may assist in the development of new targets along this highly prospective VMS trend.
Homer Trend
A series of drill holes are planned at Homer which is located 4km along strike to the east of the DeGrussa Mine.
Historic drill holes, TLDD0001 (August 2014) and TLDD0003 (June 2015), both intersected the interpreted
extension of the DeGrussa C5 lens host VMS stratigraphy. This important interpretation indicates the significant
exploration potential of the Homer Trend to host accumulations of VMS copper-gold mineralisation.
A new drill hole, located approximately 3 kilometres along strike to the east of TLDD0003, targeted on a
geochemical anomaly is now underway.
Further drilling at Homer is currently planned, but its extent and timing will be driven by initial results and
interpretations of the current drill hole.
Springfield Geochemical Anomalies – New Exploration Targets
Further afield from both the Monty and Homer prospective trends, aircore drilling and detailed geochemical
analysis and interpretation has identified a series of geochemical anomalies that present as new
exploration targets and warrant follow up RC drilling.
These geochemical anomalies are located in areas within the Monty, Monty South and Southern Volcanics
trends.
These new exploration targets are planned to be tested by RC drilling in the New Year.
Aircore Drilling
To date, aircore drilling across the Springfield Project has proven to be an effective exploration technique to
identify underlying geology and also provide valuable geochemical data that may assist vectoring towards
prospective VMS horizons.
Two aircore drilling programs are planned to be conducted by the Joint Venture over the next two to three
months.
Monty Update
Monty South
Recent work supports an interpretation that the Monty South prospect may represent a potentially significant
extension of the highly prospective Monty Trend. This potential extension is in addition to the currently
interpreted 5 km Monty VMS trend.
This potential southern extension of the Monty Trend is interpreted to have undergone significant structural
deformation that offsets the prospective Monty South stratigraphy from the Monty Trend by as much as
70 degrees.
Aircore drilling completed to date has identified the interpreted continuation of the prospective host VMS
stratigraphy with supportive geochemistry.
An aircore infill drilling program is planned in the New Year at Monty South to increase the geological
understanding of this broader prospect and potentially generate further exploration targets south of the 5 km
Monty VMS trend.
North East Springfield Structural Target
Assessment of a geochemical anomaly located approximately five kilometres to the north-east of Monty, within
the Yerrida Basin, is considered to be situated along a regionally significant fault zone.
This zone is interpreted to have the potential to host epigenetic style copper mineralisation similar to that seen at
the Thaduna deposit approximately twenty kilometres to the east.
A program of aircore drilling is partially complete and is planned to recommence in the first quarter of 2016. This
drilling program is anticipated to enable a further assessment of the exploration potential of this prospect.
Planned Scoping Projects
In addition to the aforementioned exploration work and resource definition drilling at Monty, initial scoping studies
are underway or planned to commence during the next two to three months.
These initial study works include resource modelling, mining studies, infrastructure assessments, as well as
preliminary metallurgical, geotechnical, hydrological and environmental studies.
ENDS
For further information, please contact:
Gary Lethridge – Managing Director
on +61 8 9380 4230
For media inquiries, please contact:
Nicholas Read – Read Corporate
on +61 419 929 046
Competent Person’s Statement
Information in this ASX release that relates to Exploration Results is based on information compiled by Mr Graham Leaver, who is
a member of the Australian Institute of Geoscientists. Mr Leaver is a full time employee of Talisman Mining Ltd and has sufficient
experience which is relevant to the style of mineralisation and types of deposit under consideration and to the activities undertaken
to qualify as a Competent Person as defined in the 2012 Edition of the “Australian Code for Reporting of Mineral Resources and
Ore Reserves”. Mr Leaver consents to the inclusion in this report of the matters based on information in the form and context in
which it appears.
Monty Update
Table 1 – Drill-hole Information Summary, Monty Prospect
Details and co-ordinates of all relevant drill hole collars are provided in the table below:
Hole ID
Depth
Dip
Azimuth
Grid_ID
East
North
RL
Lease ID
Hole Status
TLDD0002A
463
-61°
110°
MGA94_50
743544
7171211
602
E52/2282
Complete
TLDD0004A
817
-60°
148°
MGA94_50
743588
7171281
601
E52/2282
Complete
TLDD0005
478
-62°
139°
MGA94_50
743544
7171210
602
E52/2282
Complete
TLDD0006
554
-62°
140°
MGA94_50
743469
7171174
601
E52/2282
Complete
TLDD0007
589
-62°
138°
MGA94_50
743504
7171271
601
E52/2282
Complete
TLDD0008
688
-62°
138°
MGA94_50
743441
7171223
600
E52/2282
Complete
TLDD0009
472
-61°
140°
MGA94_50
743578
7171190
602
E52/2282
Complete
TLDD0010
433
-62°
142°
MGA94_50
743514
7171138
601
E52/2282
Complete
TLDD0011
472
-62°
141°
MGA94_50
743451
7171092
598
E52/2282
Complete
TLDD0012
598
-62°
140°
MGA94_50
743403
7171155
599
E52/2282
Complete
TLDD0014
399
-62°
143°
MGA94_50
743638
7171231
603
E52/2282
Complete
TLDD0015
376
-62°
146°
MGA94_50
743561
7171073
602
E52/2282
Complete
TLDD0016
274
-61°
147°
MGA94_50
743621
7171119
604
E52/2282
Complete
TLDD0017
236
-62°
146°
MGA94_50
743686
7171166
605
E52/2282
Complete
TLDD0018
340
-62°
146°
MGA94_50
743471
7171054
599
E52/2282
Complete
TLDD0019
552
-62°
141°
MGA94_50
743566
7171329
600
E52/2282
Complete
TLDD0020
340
-61°
141°
MGA94_50
743536
7171106
602
E52/2282
Complete
TLDD0021
331
-62°
144°
MGA94_50
743599
7171152
603
E52/2282
Complete
TLDD0022
304
-62°
141°
MGA94_50
743441
7171035
599
E52/2282
Complete
TLDD0024
571
-60°
141°
MGA94_50
743470
7171172
600
E52/2282
Complete
TLDD0025
406
-60°
141°
MGA94_50
743481
7171113
600
E52/2282
Complete
TLDD0026
409
-59°
141°
MGA94_50
743609
7171209
602
E52/2282
Complete
TLDD0027
511
-60°
143°
MGA94_50
743521
7171193
602
E52/2282
Complete
TLDD0028
441
-62°
143°
MGA94_50
743569
7171129
602
E52/2282
Complete
TLDD0029
247
-60°
319°
MGA94_50
743594
7170898
602
E52/2282
Complete
TLDD0030
237
-62°
317°
MGA94_50
743626
7170922
603
E52/2282
Complete
TLDD0033
589
-62°
142°
MGA94_50
743536
7171306
600
E52/2282
Complete
TLDD0038
313
-59°
147°
MGA94_50
743633
7171178
604
E52/2282
Complete
TLRC0003
544
-61°
144°
MGA94_50
743720
7171393
599
E52/2282
Complete
TLRC0004
306
-62°
142°
MGA94_50
743497
7171025
600
E52/2282
Complete
TLRC0006
318
-62°
143°
MGA94_50
743430
7170973
598
E52/2282
Complete
TLRC0008
294
-62°
143°
MGA94_50
743461
7171001
599
E52/2282
Complete
TLRC0009
265
-62°
141°
MGA94_50
743527
7171050
601
E52/2282
Complete
TLRC0012
210
-62°
143°
MGA94_50
743553
7171017
602
E52/2282
Complete
TLRC0015
138
-60°
320°
MGA94_50
743503
7170953
600
E52/2282
Complete
TLRC0016
120
-58°
317°
MGA94_50
743580
7170985
602
E52/2282
Complete
TLRC0017
120
-60°
318°
MGA94_50
743548
7170968
601
E52/2282
Complete
Monty Update
Table 2 – Drill-hole Assay Intersections >1% for the Monty Prospect
Details of all relevant intersections provided below. Estimated true widths have been calculated using estimated dip
and dip-direction of modelled mineralisation surfaces at the drill-hole intersection and azimuth and dip of the drill-hole.
Hole ID
TLDD0004A
TLDD0005
TLDD0008
TLDD0009
TLDD0010
TLDD0011
TLDD0014
TLDD0016
TLDD0020
TLDD0021
TLDD0024
TLDD0025
TLDD0026
TLDD0027
TLDD0029
TLDD0031
TLDD0033
TLRC0004
TLRC0008
TLRC0009
Interval
1
2
3
1
2
3
1
2
1
2
3
1
2
1
2
1
2
1
2
3
1
2
1
2
Intersection
From
(m)
To
(m)
Downhole
Width
(m)
Estimated
True Width
(m)
Cu (%)
Au (g/t)
409.5
417.0
574.2
343.0
363.1
385.8
355.6
359.7
373.6
370.9
334.2
359.4
168.5
272.3
239.0
286.2
300.2
445.6
326.0
325.6
339.4
393.5
411.0
173.9
175.7
183.6
485.1
489.2
496.0
107.0
158.0
89.0
112.0
133.0
426.0
426.2
579.3
344.0
371.0
390.6
356.1
370.2
378.2
371.3
334.7
362.8
168.9
273.8
242.4
294.2
301.4
448.2
335.4
332.9
361.0
394.8
421.7
182.2
176.0
184.5
485.4
489.7
498.0
125.0
162.0
95.0
123.0
145.0
16.5
9.2
5.1
1.0
7.9
4.8
0.5
10.5
4.6
0.4
0.5
3.4
0.4
1.5
3.4
8.0
1.2
2.6
9.4
7.3
21.6
1.3
10.7
8.3
0.3
0.9
0.3
0.5
2.0
18.0
4.0
6.0
11.0
12.00
10.9
6.1
3.2
0.5
5.8
3.0
0.3
6.3
2.9
0.2
0.3
2.0
0.3
0.9
1.8
4.6
0.7
1.7
3.6
4.7
15.2
0.9
7.0
6.6
0.2
0.7
0.2
0.3
1.3
5.1
1.2
1.4
2.5
2.8
18.9
11.8
1.4
8.6
8.3
4.9
1.2
18.9
12.8
1.2
3.6
3.5
1.4
13.8
17.9
13.3
3.8
14.2
7.2
6.2
34.4
11.5
6.2
8.0
2.9
6.9
4.1
12.7
4.2
5.7
4.2
7.8
15.0
5.7
2.1
2.9
0.1
0.3
2.4
1.1
1.4
3.1
2.5
1.3
0.1
0.8
0.1
1.1
3.9
1.8
1.7
1.1
2.2
2.8
0.4
2.2
2.0
1.1
0.2
1.1
0.9
1.6
1.4
2.4
0.7
0.9
1.9
1.8
Monty Update
Appendix 1: Talisman’s Doolgunna Copper-Gold Projects subject to the $15M Exploration Farm-In Joint Venture with Sandfire
Resources NL
Monty Update
Appendix 2 – Interpretive cross-section of the Monty mineralisation (Lower Zone)
Monty Update
Appendix 3 - JORC TABLE 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (e.g.
cut channels, random chips, or
specific specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down-hole gamma sondes, or
handheld XRF instruments, etc.).
These examples should not be taken
as limiting the broad meaning of
sampling.
• Include reference to measures taken
to ensure sample representivity and
the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’
work has been done this would be
relatively simple (e.g. ‘reverse
circulation drilling was used to obtain
1 m samples from which 3 kg was
pulverised to produce a 30 g charge
for fire assay’). In other cases more
explanation may be required, such as
where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types
(e.g. submarine nodules) may warrant
disclosure of detailed information.
•
• Drill type (e.g. core, reverse
circulation, open-hole hammer, rotary
air blast, auger, Bangka, sonic, etc.)
and details (e.g. core diameter, triple
or standard tube, depth of diamond
tails, face-sampling bit or other type,
whether core is oriented and if so, by
what method, etc.).
•
Diamond drilling is completed using NQ2 size
coring equipment.
•
RC drilling is with a face sampling hammer of a
nominal 140mm hole diameter.
•
•
All drill collars are surveyed using RTK GPS.
All core, where possible is oriented using a
Reflex ACT II RD orientation tool.
Downhole surveying is undertaken using a
gyroscopic survey instrument.
Drilling
techniques
•
•
•
•
•
•
•
•
The sampling method employed by Sandfire i s
h a l f -core sampling of NQ2 core from
diamond drilling (DD).
Sandfire collect RC samples by cone splitter for
single metre samples or a sampling spear for first
pass composite samples using a face sampling
hammer with a nominal hole diameter of 140mm.
Sampling is guided by Sandfire protocols as per
industry standard.
Diamond drill core sample size reduction is
through a Jaques jaw crusher to -10mm and a
second stage reduction via Boyd crusher to 4mm.Representitive sub samples are split and
pulverised via an LM5 mill.
RC samples are crushed to -4mm through a
Boyd crusher and representative sub samples
are split and pulverised with an LM5 mill.
Pulverising is to nominal 90% passing -75µm and
is checked using wet sieving technique.
Samples are assayed using Mixed 4 Acid
Digest (MAD) 0.3g charge and MAD Hotbox
0.15g charge methods with ICPOES or ICPMS.
Fire Assay is completed by firing 40g portion of
the sample with ICPMS finish.
Monty Update
Drill sample
recovery
• Method of recording and assessing
core and chip sample recoveries and
results assessed.
• Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
• Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain
of fine/coarse material.
•
•
•
•
•
Logging
Subsampling
techniques
and sample
preparation
• Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc.) photography.
• The total length and percentage of the
relevant intersections logged.
• If core, whether cut or sawn and
whether quarter, half or all core taken.
• If non-core, whether riffled, tube
sampled, rotary split, etc. and whether
sampled wet or dry.
• For all sample types, the nature,
quality and appropriateness of the
sample preparation technique.
• Quality control procedures adopted
for all sub-sampling stages to
maximise representivity of samples.
• Measures taken to ensure that the
sampling is representative of the in
situ material collected, including for
instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate
to the grain size of the material being
sampled.
•
•
•
•
•
•
•
•
•
Diamond core recovery is logged and captured into
the database. Core recoveries are measured by
drillers for every drill run. The core length
recovered is physically measured for each run and
recorded and used to calculate the core recovery
as a percentage of core recovered.
Appropriate measures are taken to maximise
sample recovery and ensure the representative
nature of the samples. This includes diamond core
being reconstructed into continuous intervals on
angle iron racks for orientation, metre marking and
reconciled against core block markers.
RC sample recovery is good with almost no wet
sampling in the project area.
Samples are routinely weighed and the information
captured into the central secured database.
No sample recovery issues have impacted on
potential sample bias.
Geological logging is completed for all holes and is
representative across the orebody. The lithology,
alteration and structural characteristics of core are
logged directly to a digital format following
procedures, and using Sandfire NL geologic
codes. Data is imported into Sandfire NL’s central
database after validation in LogChief™.
Logging is both qualitative and quantitative
depending on field being logged.
All cores are photographed.
All drill holes are fully logged.
Diamond core orientations are completed where
possible and all core is marked prior to sampling.
Half core samples are produced using an Almonte
Core Saw. Samples are weighed and recorded.
RC samples are split using a cone or riffle splitter.
The majority of samples collected are dry. On
occasion that wet samples are encountered they
are dried prior to splitting with a riffle splitter.
All samples are sorted, dried at 80° for up to 24
hours and weighed. Samples are then crushed
through a Jaques crusher to nominal -10mm. A
second stage crushing is through a Boyd crusher
to nominal -4mm.
Sample splits are weighed at a frequency of 1:20
and entered into the job results file. Pulverising is
completed using LM5 mill to 90% passing 75%µm
using wet sieving technique.
1:20 grind quality checks are completed for 90%
passing 75%µm criteria to ensure
representativeness of sub-samples.
Monty Update
•
Subsampling
techniques
and sample
preparation
(Continued)
Quality of
assay data
and
laboratory
tests
•
•
• The nature, quality and
appropriateness of the assaying and
laboratory procedures used and
whether the technique is considered
partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc., the
parameters used in determining the
analysis including instrument make
and model, reading times, calibrations
factors applied and their derivation,
etc.
• Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory
checks) and whether acceptable
levels of accuracy (i.e. lack of bias)
and precision have been established.
•
•
•
•
Verification
of sampling
and
assaying
• The verification of significant
intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data
entry procedures, data verification,
data storage (physical and electronic)
protocols.
• Discuss any adjustment to assay
data.
•
•
•
•
Sampling is carried out in accordance with
Sandfire protocols as per industry best practice.
No field duplicates have been taken.
The sample sizes are considered appropriate for
VHMS and Gold mineralisation types.
Samples are assayed using Mixed 4 Acid Digest
(MAD) 0.3g charge and MAD Hotbox 0.15g
charge methods with ICPOES or ICPMS. The
samples are digested and refluxed with a mixture
of acids including Hydrofluoric, Nitric,
Hydrochloric and Perchloric acids and analysis
conducted for multi elements including Cu, Pb,
Zn, Ag, As, Fe, S, Sb, Bi, Mo, Re, Mn, Co, Cd,
Cr, Ni, Se, Te, Ti, Zr, V, Sn, W and Ba. The MAD
Hotbox method is an extended digest method
that approaches a total digest for many elements
however some refractory minerals are not
completely attacked. The elements S, Cu, Zn,
Co, Fe, Ca, Mg, Mn, Ni, Cr, Ti, K, Na, V are
determined by ICPOES, and Ag, Pb, As, Sb, Bi,
Cd, Se, Te, Mo, Re, Zr, Ba, Sn, W are
determined by ICPMS. Samples are analysed for
Au, Pd and Pt by firing a 40g of sample with ICP
AES/MS finish. Lower sample weights are
employed where samples have very high S
contents. This is a classical FA process and
results in total separation of Au, Pt and Pd in the
samples.
The analytical methods are considered
appropriate for this mineralisation styles.
No geophysical tools are used in the analysis.
Sandfire DeGrussa QAQC protocol is considered
industry standard with standard reference
material (SRM) submitted on regular basis with
routine samples. SRMs and blanks are inserted
at a minimum of 5% frequency rate.
Significant intersections have been verified by
alternate Sandfire personnel.
None of the drillholes in this report are twinned.
Primary data is captured on field Toughbook
laptops using Logchief™ Software. The software
has validation routines and data is then imported
into a secure central database.
The primary data is always kept and is never
replaced by adjusted or interpreted data.
Monty Update
Location of
data points
• Accuracy and quality of surveys used to
locate drill holes (collar and down- hole
surveys), trenches, mine workings and
other locations used in Mineral
Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic
control.
•
•
•
•
•
The Sandfire Survey Department undertakes
survey works u
Share your feedback
Discover