Exploration Program commences at Sinclair Nickel Project
Released
Released
Announcement PDF
12th August 2015
COMPANY SNAPSHOT
Board of Directors
Maiden Exploration Program at Sinclair
Nickel Project Commences
Surface geophysical surveys commence at high priority Delphi
Prospect ahead of targeted drilling
Alan Senior
Non-Executive Chairman
Gary Lethridge
Managing Director
Highlights
Initial exploration
commenced.
Potential for Delphi to be a Sinclair “look-alike” with several
identified ultramafic channels interpreted.
Geological similarities to Sinclair are indicative of increased
potential for massive sulphide deposits to be discovered compared
with historical interpretations.
Modern, high-powered geophysical moving loop electromagnetic
(MLEM) surveys commenced to confirm historical electromagnetic
(EM) anomalies and to increase geophysical coverage of selected
prospective ultramafic channels.
Exploration drilling of high-priority targets at the Delphi Prospect
planned to commence following assessment and review of the
results of the MLEM surveys.
Brian Dawes
Non-Executive Director
Karen Gadsby
Non-Executive Director
Contact Details
Telephone:
+61 8 9380 4230
Email:
info@talismanmining.com.au
Website:
www.talismanmining.com.au
ASX: TLM
Capital Structure
Shares on Issue:
148,559,904 (TLM)
Options on Issue:
6,400,000 (Unlisted)
activities
focusing
at
Delphi
have
now
Sinclair -Maiden Exploration Program Commences
Talisman Mining Ltd (ASX: TLM – “Talisman” or “the Company”) is pleased to announce that it has now
commenced ground-based exploration activities at the Delphi Prospect with the commencement of
surface based, high powered moving loop electromagnetic (MLEM) geophysical surveys at Delphi North
and Delphi South.
These surveys represent the first comprehensive exploration program to be undertaken at Sinclair in a
number of years and follows a highly successful (and ongoing) exploration targeting review and ranking
exercise by Talisman.
Surface Geophysics Program
The Company’s maiden ground-based exploration program at Sinclair has now commenced with a
geophysical MLEM survey across the highly prospective Delphi Prospect area.
The Delphi Prospect area, located between approximately 4 and 10 kilometres south of the Sinclair mine
(see Figure 1), has delivered a number of high grade nickel sulphide intersections in sparse historical
drilling including:
Figure 1
0.44 metres at 5.43% Ni and,
0.32 metres at 2.99% Ni. (see ASX Release: Sinclair Nickel Project Update 16 February 2015)
Long section looking west extending from Delphi prospect in the south to Cody Well in the North.
Priority surface and down-hole geophysical EM anomalies shown.
Reinterpretation of the geology extending south of Sinclair through the Delphi Prospect area has shown
similarities in the ultramafic rock units to those seen at Sinclair. In addition, following this geological reinterpretation previously inexplicable historical geophysical EM anomalies now lie in favourable
stratigraphic positions and are interpreted by Talisman to be indicative of possible accumulations of
nickel sulphide mineralisation.
Talisman believes the geological similarities noted between Delphi and Sinclair have significantly
increased the potential to discover massive sulphide deposits, compared with historical interpretations.
As such, the Delphi prospect is considered to be a priority target and is the first program to be covered by
a series of geophysical surveys.
In conjunction with Newexco, Talisman has designed these surface EM surveys to cover approximately 6
strike kilometres of ultramafic stratigraphy across the Delphi Prospect that has not been subject to any
modern geophysical surveys. (see Figure 2).
The EM survey will employ what is considered to represent best practice in modern surface geophysical
EM techniques, utilising a high powered transmitter and B-field SQUID receiver in a moving loop
configuration to ensure the best possible EM coverage of the area.
Sinclair -Maiden Exploration Program Commences
With the most valid geophysical surveys on the area having been completed using previous generation
geophysical technologies, Talisman anticipates the surveys to confirm and refine historical geophysical
targets and to potentially identify new targets that were not able to be detected previously from surface.
Figure 2:
The Delphi prospect interpreted geology showing historic significant drill intersections and
geophysical anomalies. The proposed high powered surface EM survey coverage is also shown.
Talisman will continue to identify other areas across the project (including Cody Well and Fly Bore) where
modern geophysical techniques may have significant advantage over historical techniques with a view to
undertaking additional targeted surface EM surveys in the future.
Initial Targeted Exploration Drilling
The MLEM surveys are anticipated to take several weeks to complete. Talisman intends to commence
exploration drilling of high-priority targets at the Delphi Prospect following assessment and review of the
results of the surveys.
ENDS
For further information, please contact:
Gary Lethridge – Managing Director
on +61 8 9380 4230
For media inquiries, please contact:
Nicholas Read – Read Corporate
on +61 419 929 046
Sinclair -Maiden Exploration Program Commences
Competent Persons’ Statement
Information in this ASX release that relates to Exploration Results and Mineral Resources is based on information compiled
by Mr Graham Leaver, who is a member of the Australasian Institute of Geoscientists. Mr Graham Leaver is a full time
employee of Talisman Mining Ltd and has sufficient experience which is relevant to the style of mineralisation and types of
deposit under consideration and to the activities undertaken to qualify as a Competent Person as defined in the 2012 Edition
of the “Australian Code for Reporting of Mineral Resources and Ore Reserves”. Mr Graham Leaver consents to the inclusion
in this report of the matters based on information in the form and context in which it appears.
No new information that is considered material is included in this document. All information relating to exploration results
has been previously released to the market and is appropriately referenced in this document. JORC tables are not
considered necessary to accompany this document.
Appendix 1: Plan showing Talisman tenement holding at the Sinclair Nickel Project and selected prospect names.
Share your feedback
Discover