Second High-Grade Copper-Gold and Base Metal Zone Discovered
Released
Released
Announcement PDF
07 June 2024
Second High-Grade Copper-Gold and Base Metal Zone
Discovered at Durnings
New zone located 400 metres north-east of recently reported standout intercepts
Northern Durnings
•
Second high-grade gold and copper mineralised zone intersected in hole DRDD0023 in the
Northern Durnings area, with new intercepts (down hole widths) including:
o
4m at 12.6g/t Au, 11.4g/t Ag, 0.5% Cu, 0.4% Pb, 0.6% Zn from 90m, including:
§
o
•
13m at 1.35g/t Au, 18.1g/t Ag, 0.3% Cu, 2.7% Pb, 0.3% Zn from 65m, including:
§
7m at 2.79g/t Au, 31.4g/t Ag, 0.5% Cu, 4.9% Pb, 0.5% Zn from 65m, including:
§
1m at 12.2 g/t Au, 47.4g/t Ag, 2.3% Cu, 1.6% Pb, 1.0% Zn
DRDD0023 is located 400m NE of the previously reported high-grade copper, gold and base
metal intercepts in DRRCD0006 and DRRCD0019, which returned assays including:
o
•
1m at 44.4g/t Au, 29.0g/t Ag, 1.1% Cu, 0.5% Pb, 0.6% Zn
24.8m at 4.58g/t Au, 30.1g/t Ag, 1.0% Cu, 4.3% Pb, 0.8% Zn from 374m (DRRCD0019)
Confirmation of a second high-grade mineralised zone in the Northern Durnings area further
reinforces a major greenfields base and precious metals discovery at Durnings.
Southern Durnings
•
Broad zones of low-grade base metals with sporadic high-grade base metals, gold and copper
returned from several follow-up holes drilled at the Southern Durnings area.
•
Structural analysis of the core shows that these holes were drilled in sub-optimal directions to
intersect the high-grade zones and the modelled DHEM (Down-hole Electro Magnetics) survey.
•
Multiple conductive plates of varying strength were outlined by a recently completed DHEM
survey at Southern Durnings. The plates potentially define zones of alteration and/or
mineralisation associated with the high-grade copper and gold intercepts in DRRCD0006,
DRRCD00019 and DRRCD0020.
•
Follow-up drilling planned to commence in June targeting the DHEM generated plates,
associated high-grade zones and evaluate extensions.
Talisman Mining Limited (ASX: TLM, Talisman) is pleased to report further significant assay results
from Stage 2 follow-up exploration at the Durnings Prospect, part of its 100%-owned Lachlan
Project in central NSW.
Diamond drilling in the northern Durnings area has identified a second significant zone of high-grade
gold and copper mineralisation, with hole DRDD0023 returning high-grade assays from an area
400m north-east of the previously reported copper, gold and base metal intercepts in holes
DRRCD0006 and DRRCD0019 (see ASX Announcement 29 April 2024).
Confirmation of a second high-grade mineralised zone in this area further reinforces a major
greenfields base and precious metals discovery at Durnings.
Follow-up drilling in the southern Durnings area intersected broad zones of low-grade mineralisation,
with sporadic zones of higher-grade mineralisation, with analysis of the drill core indicating these
holes were drilled at a sub-optimal orientation to intersect the previously reported higher-grade
zones.
Down-hole Electromagnetic (DHEM) surveys of these drill holes have highlighted multiple conductor
plates of varying strengths at southern Durnings. Detailed modelling of the DHEM data with respect
to structural data collected from the drill core is underway which will help guide the next round of
exploration.
Management Comment
Talisman’s Managing Director, Andrew Munckton, said: “Our Stage 2 drilling program at Durnings is
continuing to deliver excellent results, with the discovery of a second high-grade zone of
mineralisation in the northern part of the prospect area providing further evidence that we have a
new greenfields discovery on our hands.
“Importantly, the new copper-gold and base metal results in DRDD0023 are located 400 metres
away from the original discovery hole DRRCD0006 and the spectacular intercepts in DRRCD0019.
This shows that we have several mineralised positions at Durnings with the potential for exceptional
grades over a considerable area in multiple locations.
“At Southern Durnings, analysis of our recent drill core suggests we have drilled at a sub-optimal
orientation to test the high-grade zone – which would explain why the remainder of the Stage 2
drilling returned broad zones of low-grade mineralisation with sporadic high grades.
“DHEM surveys from this area have outlined a number of conductor plates of varying strength that
are associated with known high-grade zones and give us confidence in the potential to extend this
high-value mineralisation with further drilling.
“Collectively, these results give us strong momentum as we prepare for the next phase of exploration
at Durnings. Drilling is scheduled to re-commence in mid-June subject to the receipt of approvals.
“The Cobar Basin has been delivering significant exploration news at a number of locations lately
and Talisman is pleased to be at the forefront of a new wave of discoveries for the region with our
emerging discoveries at Durnings and Rip N Tear. The next few months should be an exciting time
for our shareholders.”
Figure 1 – Durnings Project location plan highlighting prospect locations along the Canbelego-Mineral Hill Volcanic Belt.
B
Figure 2 – Durnings Project RC drilling and follow-up RC and diamond drilling over GAIP survey image. See Figure 3 and 4 for Cross
Section A-A’ and B-B’.
Figure 3 – Section B-B’ Northern Durnings. RC holes DRDD0023 to DRRCD0010 shown with parallel gold and copper mineralised
zones in DRDD00023 (significant intercepts down hole widths).
Figure 4 –A-A’ Section Sothern Durnings. DRRCD0006, DRRC0012, DRRC0013, DRRC0014, DRRC0015, DRRC0016 and DRRC0019
holes with main interpreted mineralised zones (significant intercepts down hole widths).
Geology and Mineralisation
The Durnings project area is characterised by felsic volcanic rocks of the Mineral Hill Volcanic
sequence (MHV). The MHV of Silurian-Devonian age has been mapped within Talisman’s tenure
south of Mineral Hill and contains four prospects: Boona, Kaolin Shaft, Hilltop and Durnings in the
central part of the sequence.
The MHV package extends to Gunawyle in the north and Brooklyn in the south, a distance of 15km.
Underlying the MHV sequence is the Ordovician age Girilambone Formation (Figure 1).
A series of NW-SE oriented shear zones and faults straddle the sequence and are interpreted as
tapping buried Devonian age granite intrusions which outcrop at locations such as Wilmatha and are
the source of the heat, fluids and metals for the mineralisation at both Mineral Hill, Durnings and
other related prospects in the area.
Results
Northern Durnings
Assay results have been received for four additional diamond drill-holes DRRCD0008, DRRCD0010,
DRDD0023 and DRDD0024.
Significant high-grade intersections were received in DRDD0023 which comprised PQ core to 32m
and HQ core to 251.4m. The hole was drilled at 74 degrees towards grid NNE to follow-up highgrade gold assay results in DRRC0001 which was drilled at 75 degrees towards NNE (Figures 2 &
3).
Two quartz vein breccia mineralised zones containing sphalerite, galena and chalcopyrite were
intersected, returning the following significant intercepts (down hole widths):
•
4m at 12.6 g/t Au, 11.4g/t Ag, 0.5% Cu, 0.4% Pb, 0.6% Zn from 90m to 94m including:
o
•
1m at 44.4g/t Au, 29.0g/t Ag, 1.1% Cu, 0.5% Pb, 0.6% Zn.
13m at 1.35g/t Au, 18.1g/t Ag, 0.3% Cu, 2.7% Pb, 0.3% Zn from 65m to 78m including:
o
7m at 2.79g/t Au, 31.4g/t Ag, 0.5% Cu, 4.9% Pb, 0.5% Zn from 65m, including
o
1m at 12.2g/t Au, 47.4g/t Ag, 2.3% Cu, 1.6% Pb, 1.0% Zn
Previous results (See ASX: TLM, 15 May 2023) reported from DRRC0001 included:
•
8m at 6.3g/t Au, 6.3g/t Ag, 0.77% Cu, 0.27% Pb, 0.36% Zn from 82m, including:
o
2m at 17.5g/t Au, 12.8g/t Ag, 1.4% Cu, 0.32% Pb, 0.36% Zn from 88m.
The results confirm the existence of a second high-grade zone of gold and copper mineralisation
associated with quartz veining and sulphide alteration, in the Durnings area.
Southern Durnings
Assay results have also been received for seven additional RC drill holes (DRRC0012 to DRRC0014,
DRRC0016 to DRRC0018 and DRRC0022) and six diamond drill-holes (DRRCD0006,
DRRCD0011, DRRCD0015, DRRCD0019, DRRCD0020 and DRRCD0021) (Figures 2 & 4).
Significant intersections are listed in Table 2 to Table 4 and include extensions to previously reported
results in DRRCD0006.
Several of these holes intersected broad zones of low-grade base metals and sporadic high-grade
base metals, gold and copper intercepts. This style of mineralisation is indicative of a broader
mineralised system with several phases and orientations of mineralisation with strong structural
control as seen elsewhere in the Durnings and Mineral Hill district.
Recent structural analysis of the Durnings core has shown these holes were drilled in sub-optimal
directions to follow up the high-grade intercepts seen in DRRCD0006 and DRRCD0019.
Furthermore, DHEM in several deep diamond holes in the southern Durnings area suggests multiple
conductive plates of varying strengths which may represent alteration and/or mineralised zones
associated with high-grade base metal, gold and copper intercepts (Figure 5) .
Figure 5 – DHEM plates modelled off holes DRRCD0006, DRCD0015, DRCD0019, DRRCD0020 and DRCD0021 in a 3D orthogonal
view looking to the NE and tilted 25 degrees SW. Located approximately at Section A-A’ (see Figure 2). Significant intercepts
labelled (down hole widths) which are associated with modelled plate positions.
Next Steps
Stage 3 exploration at the Southern Durnings area is planned to commence in mid-June and consist
of Step-out drilling guided by DHEM plates associated with high-grade base metals intersections in
DRRCD0006 and DRRCD0019. Step-out drilling will also target DHEM plates modelled in
DRRCD0020 along strike from DRRCD0019.
Further drilling at Durnings North will aim to extend up-dip and along strike the recent high grade
intersections received in DRDD0023.
Planning and approval applications for Stage 3 drilling is underway.
End
For further information, please contact:
Andrew Munckton - Managing Director
on +61 4 3563 5598
Nicholas Read (Media inquiries)
on +61 4199 29046
This release has been authorised by the Board of Talisman Mining Limited.
Exploration
Licence
Prospect
Hole ID
EL8660
EL8660
EL8660
EL8660
EL8660
Durnings
Durnings
Durnings
Durnings
Durnings
DRRC0001
DRRC0002
DRRC0003
DRRC0004
DRRC0005
EL8660
Durnings
DRRCD0006
EL8660
Durnings
DRRC0007
EL8660
Durnings
DRRCD0008
EL8660
Durnings
DRRC0009
EL8660
Durnings
DRRCD0010
EL8660
Durnings
DRRCD0011
EL8660
EL8660
EL8660
Durnings
Durnings
Durnings
DRRC0012
DRRC0013
DRRC0014
EL8660
Durnings
DRRCD0015
EL8660
EL8660
EL8660
Durnings
Durnings
Durnings
DRRC0016
DRRC0017
DRRC0018
EL8660
Durnings
DRRCD0019
EL8660
Durnings
DRRCD0020
EL8660
Durnings
DRRCD0021
EL8660
EL8660
EL8660
Durnings
Durnings
Durnings
DRRC0022
DRDD0023
DRDD0024
Hole
Type
RC
RC
RC
RC
RC
RC &
DD
RC
RC &
DD
RC
RC &
DD
RC &
DD
RC
RC
RC
RC &
DD
RC
RC
RC
RC &
DD
RC &
DD
RC &
DD
RC
DD
DD
Easting
Northing
RL
Dip
505741
505894
505844
505793
505741
6386634
6386759
6386773
6386837
6386879
289
291
291
293
295
-75
-60
-59
-60
-58
Azimuth
(MGA
94)
12
130
132
131
132
505927
6386293
287
-60
50
403.5
505819
6386566
285
-61
47
238
505691
6386868
294
-61
47
298.7
505639
6387024
290
-60
51
322
505829
6386739
289
-60
49
315.7
505988
6386156
285
-60
50
384.4
505988
505990
506049
6386344
6386340
6386395
283
283
281
-60
-60
-60
47
56
53
118
214
280
506049
6386395
281
-60
228
423.7
506079
505998
505936
6386420
6386457
6386406
280
281
282
-60
-60
-60
52
50
55
244
214
214
506079
6386420
280
-75
236
452.9
506101
6386334
281
-75
232
384.3
505988
6386457
281
-75
235
375.9
506040
505749
505754
6386282
6386641
6386929
283
289
296
-75
-74
-55
236
15
51
304
251.4
249
EOH Depth
186
210
216
216
210
Table 1: Drill-hole information summary – Durnings: Details and coordinates of the RC, RCD and DD
holes relevant to this release.
Table 2: Diamond and RC drill-hole assay intersections for Mineralized Zones (Significant
Intersections (DRRCD0006 – DRRCD0015)
Table 3: Diamond and RC drill-hole assay intersections for Mineralized Zones (Significant
Intersections DRRC0016 – DRRC0022)
Table 4: Diamond and RC drill-hole assay intersections for Mineralized Zones (Significant
Intersections DRRCD0023 – DRD0024).
Exploration
Licence
Prospect
Hole ID
EL8660
EL8660
EL8660
EL8660
EL8660
Durnings
Durnings
Durnings
Durnings
Durnings
DRRC0001
DRRC0002
DRRC0003
DRRC0004
DRRC0005
EL8660
Durnings
DRRCD0006
EL8660
Durnings
DRRC0007
EL8660
Durnings
DRRCD0008
EL8660
Durnings
DRRC0009
EL8660
Durnings
DRRCD0010
EL8660
Durnings
DRRCD0011
EL8660
EL8660
EL8660
Durnings
Durnings
Durnings
DRRC0012
DRRC0013
DRRC0014
EL8660
Durnings
DRRCD0015
EL8660
EL8660
EL8660
Durnings
Durnings
Durnings
DRRC0016
DRRC0017
DRRC0018
EL8660
Durnings
DRRCD0019
EL8660
Durnings
DRRCD0020
EL8660
Durnings
DRRCD0021
EL8660
EL8660
EL8660
Durnings
Durnings
Durnings
DRRC0022
DRDD0023
DRDD0024
Hole
Type
RC
RC
RC
RC
RC
RC &
DD
RC
RC &
DD
RC
RC &
DD
RC &
DD
RC
RC
RC
RC &
DD
RC
RC
RC
RC &
DD
RC &
DD
RC &
DD
RC
DD
DD
Easting
Northing
RL
Dip
505741
505894
505844
505793
505741
6386634
6386759
6386773
6386837
6386879
289
291
291
293
295
-75
-60
-59
-60
-58
Azimuth
(MGA
94)
12
130
132
131
132
505927
6386293
287
-60
50
403.5
505819
6386566
285
-61
47
238
505691
6386868
294
-61
47
298.7
505639
6387024
290
-60
51
322
505829
6386739
289
-60
49
315.7
505988
6386156
285
-60
50
384.4
505988
505990
506049
6386344
6386340
6386395
283
283
281
-60
-60
-60
47
56
53
118
214
280
506049
6386395
281
-60
228
423.7
506079
505998
505936
6386420
6386457
6386406
280
281
282
-60
-60
-60
52
50
55
244
214
214
506079
6386420
280
-75
236
452.9
506101
6386334
281
-75
232
384.3
505988
6386457
281
-75
235
375.9
506040
505749
505754
6386282
6386641
6386929
283
289
296
-75
-74
-55
236
15
51
304
251.4
249
EOH Depth
186
210
216
216
210
Table 5: Drill-hole information summary – Durning. Details and coordinates of the RC, RCD and DD
holes relevant to this release.
About Talisman Mining
Talisman Mining Limited (ASX:TLM) is an Australian mineral development and exploration company. The Company’s aim is to
maximise shareholder value through exploration, discovery and development of complementary opportunities in base and
precious metals.
Talisman has secured tenements in the Cobar/Mineral Hill region in Central NSW through the grant of its own Exploration Licenses
and through a joint venture agreement. The Cobar/Mineral Hill region is a richly mineralised district that hosts several base and
precious metal mines including the CSA, Tritton, and Hera/Nymagee mines. This region contains highly prospective geology that
has produced many long-life, high-grade mineral discoveries. Talisman has identified several areas within its Lachlan Cu-Au
Project tenements that show evidence of base and precious metals endowment which have had very little modern systematic
exploration completed to date. Talisman believes there is significant potential for the discovery of substantial base metals and
gold mineralisation within this land package and is undertaking active exploration to test a number of these targets.
Talisman also has secured access to over 1000 km2 of highly prospective tenure in South Australia’s Gawler Craton known as
the Mabel Creek Project. Mabel Creek is prospective for large scale Iron Oxide Copper Gold (IOCG) deposits and intrusion related
rare earths and battery metals mineralisation. Mable Creek is surrounded by similar tenure owned and being actively explored by
Australia’s biggest resource companies including BHP, Rio Tinto and FMG.
Competent Person’s Statement
Information in this announcement that relates to Exploration Results and Exploration Targets is based on, and fairly represents
information and supporting documentation compiled by Dr Tim Sharp, who is a member of the Australasian Institute of
Geoscientists. Dr Sharp is a full-time employee of Talisman Mining Ltd and has sufficient experience which is relevant to the style
of mineralisation and types of deposits under consideration and to the activities undertaken to qualify as a Competent Person as
defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”.
Dr Sharp has reviewed the contents of this announcement and consents to the inclusion in this announcement of all technical
statements based on his information in the form and context in which they appear.
Forward-Looking Statements
This ASX release may include forward-looking statements. These forward-looking statements are not historical facts but rather
are based on Talisman Mining Ltd.’s current expectations, estimates and assumptions about the industry in which Talisman Mining
Ltd operates, and beliefs and assumptions regarding Talisman Mining Ltd.’s future performance. Words such as “anticipates”,
“expects”, “intends”, “plans”, “believes”, “seeks”, “estimates”, “potential” and similar expressions are intended to identify forwardlooking statements. Forward-looking statements are only predictions and are not guaranteed, and they are subject to known and
unknown risks, uncertainties, and assumptions, some of which are outside the control of Talisman Mining Ltd. Past performance
is not necessarily a guide to future performance and no representation or warranty is made as to the likelihood of achievement or
reasonableness of any forward-looking statements or other forecast. Actual values, results or events may be materially different
to those expressed or implied in this presentation. Given these uncertainties, recipients are cautioned not to place reliance on
forward looking statements. Any forward-looking statements in this announcement speak only at the date of issue of this
announcement. Subject to any continuing obligations under applicable law and the ASX Listing Rules, Talisman Mining Ltd does
not undertake any obligation to update or revise any information or any of the forward-looking statements in this announcement
or any changes in events, conditions, or circumstances on which any such forward looking statement is based.
Appendix 2
JORC Tables Section 1 & 2
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria
Sampling
techniques
Drilling
techniques
JORC Code explanation
•
Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down-hole gamma
sondes, or handheld XRF instruments, etc.).
These examples should not be taken as
limiting the broad meaning of sampling.
•
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
•
Aspects of the determination of mineralisation
that are Material to the Public Report. In
cases where ‘industry standard’ work has
been done this would be relatively simple
(e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3kg was
pulverised to produce a 30 g charge for fire
assay’). In other cases, more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed
information.
•
Drill type (e.g. core, reverse circulation, openhole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (e.g. core diameter,
triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether
core is oriented and if so, by what method,
etc).
Commentary
•
•
•
•
•
•
•
•
•
Drill sample
recovery
•
•
Method of recording and assessing core
and chip sample recoveries and results
assessed.
Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
RC Drilling samples are collected at either one metre or
two metre intervals via a drill rig mounted cyclone and
static cone splitter set to a 12% split to produce a nominal
4-7kg sample which was collected in a pre-numbered
sample bag.
RC samples undergo routine 1 metre composite pXRF
analysis using an Olympus Vanta M-series to aid in logging
and identifying zones of interest.
Diamond core samples, either PQ, HQ3 or NQ2 in size
diameter, were either cut in half longitudinally or a quarter
longitudinally, using an automated Almonte core saw Core
was placed in boats, holding core in place. Core sample
intervals varied from 0.2 to 1.3m in length but were
predominantly aligned to 1m intervals or with sample
boundaries which respected geological contacts.
Sampling is controlled by Talisman protocols and QAQC
procedures as per industry standard and a chain of custody
maintained through transfer to ALS Laboratories in
Adelaide, SA.
RC /DD samples were dried, crushed (where required),
split and pulverised (total prep) to produce a master pulp.
From this master pulp, a 0.25g sub sample was taken for
multi-element analysis by four acid digest with an ICP-MS
finish. A 50g sub sample was also taken for fire assay for
gold with ICP-AES finish.
RC drilling cited in this report was undertaken by Strike
Drilling Pty Ltd using a LC36 (KWL 700) truck-mounted
Reverse Circulation drill rig. A truck-mounted booster and
compressor provided high pressure air with an auxiliary
compressor used where ground conditions warranted.
RC drilling was completed with a face sampling hammer of
nominal 140mm size.
Diamond Drilling cited in this report was undertaken by
DDH1 Drilling Pty LTD using an Evolution FH3000 or
UDR1200 truck mounted rig.
The core was orientated using a Reflex Ez-Ori Tool.
RC Drilling
•
•
•
RC drill sample recovery is generally high with sample
recoveries and quality recorded in the database by the
logging geologist.
Sample recoveries were monitored in real-time by the
presence of Talisman personnel at the drill site.
No known relationship exists between recovery and grade
Criteria
JORC Code explanation
•
Logging
•
•
•
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
Commentary
and no known bias exists.
Diamond Drilling
•
Core recovery data was recorded for each run by
measuring total length of core retrieved against the
downhole interval actually drilled and stored in the
database. TLM representatives continuously monitor core
recovery and core presentation quality as drilling is
conducted and issues or discrepancies are rectified
promptly to maintain industry best standards.
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate
Mineral Resource estimation, mining
studies and metallurgical studies.
RC Drilling
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc.) photography.
•
The total length and percentage of the
relevant intersections logged.
•
•
•
•
RC logging records lithology, mineralogy, mineralisation,
alteration, structure, weathering, colour and other primary
features of the rock samples and is considered to be
representative across the intercepted geological units.
RC logging is both qualitative and quantitative depending
on the field being logged.
All RC drill-holes are logged in full to end of hole.
All RC chip trays are photographed, and then stored onsite
in the Lachlan Copper-Gold Project.
All information collected is entered directly into laptop
computers or tablets, validated in the field, and then
transferred to the database. The level of logging detail is
considered appropriate for exploration and to support
appropriate mineral resource estimation, mining studies,
and metallurgical studies.
Diamond Drilling
•
•
•
•
•
•
•
DD logging is carried out on site once geology personnel
retrieve core trays from the drill rig site. Core is collected
from the rig daily.
DD logging records lithology, mineralogy, mineralisation,
alteration, structure, weathering, colour and other primary
features of the rock samples and is considered to be
representative across the intercepted geological units.
All DD drill-holes are logged in full to end of hole.
Drillhole collar coordinates, azimuth, dip, depth and
sampling intervals are also recorded. DD logging is to
geological contacts.
DD logging is both qualitative and quantitative depending
on the field being logged. Logging of diamond drilling
includes geotechnical data, RQD and core recoveries.
Drill core is photographed prior to any cutting and/or
sampling, and then stored onsite in the Lachlan Copper Gold Project. Photographs are available for every diamond
drillhole completed.
All information collected is entered directly into laptop
computers or tablets, validated in the field, and then
transferred to the database. The level of logging detail is
considered appropriate for exploration and to support
appropriate mineral resource estimation, mining studies,
Criteria
JORC Code explanation
Commentary
and metallurgical studies.
Sub-sampling
techniques and
sample
preparation
•
If core, whether cut or sawn and whether
quarter, half or all core taken.
•
If non-core, whether riffled, tube sampled,
rotary split, etc. and whether sampled wet
or dry.
•
For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
•
Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
RC Drilling
•
•
•
•
Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.
•
•
•
Whether sample sizes are appropriate to
the grain size of the material being
sampled.
Diamond Drilling
•
•
•
•
•
•
Quality of assay
data
and laboratory
tests
RC Drilling samples are collected at either one metre or
two metre intervals via a drill rig mounted cyclone and
static cone splitter set to a 12% split to produce a nominal
4-7kg sample which was collected in a pre-numbered
sample bag.
RC samples are dispatched to a sample preparation lab in
Adelaide ALS where they are dried, crushed (where
required), split and pulverised (total prep) to produce a
0.25g sub sample for base metal analysis or a 50g sub
sample for gold analysis by fire assay.
QAQC protocols for all RC sampling involved the use of
Certified Reference Material (CRM) as assay standards.
All QAQC controls and measures were routinely reviewed.
Sample size is considered appropriate for geochemical
sampling for base-metal and gold mineralisation given the
nature of drilling and anticipated distribution of
mineralisation.
•
•
The nature, quality and
appropriateness of the assaying and
laboratory procedures used and
whether the technique is considered
partial or total.
For geophysical tools, spectrometres,
handheld XRF instruments, etc, the
•
•
Diamond drill core (NQ3, HQ or PQ) samples collected for
analysis were longitudinally cut in half, and quarters for the
QAQC samples using a using an automated Almonte core
saw. Core was placed in boats, holding core in place.
Half core or quarter core sample intervals typically varied
from 0.2m to 1.3m in length. 1m sample intervals were
favoured and are the most common method of sampling,
however sample boundaries do principally coincide with
geological contacts. The remaining core was retained in
core trays.
DD samples are dispatched to a sample preparation lab in
Adelaide ALS where they are dried, crushed (where
required), split and pulverised (total prep) to produce a
0.25g sub sample for base metal analysis or a 50g sub
sample for gold analysis by fire assay.
QAQC protocols for all DD sampling involved the use of
Certified Reference Material (CRM) as assay standards.
All QAQC controls and measures were routinely reviewed.
Sample size is considered appropriate for geochemical
sampling for base-metal and gold mineralisation given the
nature of drilling and anticipated distribution of
mineralisation.
Geochemical analysis is carried out on all samples using a
standardised analytical suite and sample preparation
protocol.
A multi (48) analysis by 4-acid digest with ICP-MS
determination (ME-MS61). Over-limit Pb, Zn, Cu, Ag
samples were re-assayed by 4 acid digest with ICP finish
(OG 62 and OG 62h). Assay determination of Pb% is cut to
Criteria
JORC Code explanation
Commentary
parametres used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
•
Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and
precision have been established.
•
•
•
•
•
•
•
•
•
Verification of
sampling and
assaying
Location of data
points
•
The verification of significant intersections
by either independent or alternative
company personnel.
•
The use of twinned holes.
•
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
•
Discuss any adjustment to assay data.
•
Accuracy and quality of surveys used to
locate drill-holes (collar and down- hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
•
•
•
•
•
a maximum of 40% Pb - the upper detection limit of the OG
62h assay method requested from ALS. Two (2) samples
both of 0.5m downhole width within the massive sulphide
zone (224.5m-226.2m) in DRRCD0019 are affected by this
upper limit and have been assigned 40% Pb in the
significant intersections grade esti
Share your feedback
Discover