1
Tomingley Gold Project – Geological Setting and Mineralisation. Chalmers, Ransted, Kairatis and Meates 2015.
2
Tomingley Gold Operations – Mineral Resource Statement 30 June 2025
1
Aircore drilling commences at East Peak Hill gold
prospect, NSW
Maiden phase of drilling underway to assess prospective targets located adjacent to the Peak
Hill and Tomingley gold districts
Highlights:
Macquarie Projects, NSW
East Peak Hill
• 5,000m Aircore drilling program commences at Talisman’s East Peak Hill (EPH) Prospect.
• EPH sits adjacent to the 1.36M oz at 2.2g/t Au, Tomingley gold2
and Peak Hill gold district, currently
being mined by Alkane Resources (ASX: ALK).
• The AC drilling is designed to test a 6.0km long trend of interpreted intrusive rocks which lies within the
Junee-Narromine Volcanic Belt – host to several major gold and copper-gold deposits.
• An initial but limited Auger drilling and soil geochemical program conducted by Talisman in 2025
indicated anomalous pathfinder minerals with a similar geochemical signature to the Tomingley
Operations mineralisation.
• Targets include the north-south oriented edges of an interpreted andesitic intrusion.
Talisman Mining (ASX: TLM, ‘Talisman’ or ‘the Company’) is pleased to advise that it has commenced a 5,000m
Aircore (AC) drilling program (Figure 1) at its East Peak Hill Project, located approximately 70km south-west of
Dubbo in NSW.
East Peak Hill Project (EL 9395) – Background
The East Peak Hill Project contains an interpreted andesitic intrusion outlined by anomalous magnetic features
interpreted from detailed magnetic imagery, as illustrated in Figure 3.
In 2025, Talisman commenced a limited Auger sampling program to test for pathfinder elements to the targeted
gold mineralisation. At the nearby 1.36M oz at 2.2g/t gold, Tomingley Project, owned by Alkane Resources1,2
,
pathfinder elements are used extensively in exploration to highlight prospective locations for gold
mineralisation.
The Talisman Auger drill program was partially successful. Many of the Auger holes failed to reach the basement
target due to deeper-than-expected barren transported cover. As summarised in Table 1 and illustrated in Figure
3, some of the Auger holes did reach the top of the underlying basement and recorded anomalous pathfinder
minerals – arsenic, antimony, bismuth, copper and molybdenum on both the western side and eastern side of
the interpreted intrusive rocks.
The AC drilling program which has just commenced is designed to test the width of the interpreted intrusive rock
target with broad, regional scale, 400m and 800m line spacing as an initial test of the target prospectivity.
Talisman Mining | Suite 1, Ground Floor, 33 Colin St, West Perth 6005
ABN 71079 536 495 talismanmining.com.au
4August2024
ASX Announcement
1
Tomingley Gold Project – Geological Setting and Mineralisation. Chalmers, Ransted, Kairatis and Meates 2015.
2
Tomingley Gold Operations – Mineral Resource Statement 30 June 2025
Figure 1. Wallis Drilling AC drilling rig at the East Peak Hill Prospect.
AC Program details
The Aircore drill program will be completed in two parts due to access approval being granted at the current time
for approximately 60% of the target stratigraphy.
The current program consists of up to ten lines of AC drill fences to test the postulated north-south magnetic
feature and intersections of the feature with north-northeast trending structures which are seen as key to the
emplacement of gold mineralisation in the district. This work will be completed with Wallis Drilling’s Mantis100
rig as shown in Figure 1.
The program summary specifications are as follows
- E-W drill grid (orthogonal to stratigraphy & interpreted structure/mineralisation).
- Holes drilled to blade refusal (estimated 60-80m depth).
- Holes inclined at 60 degrees, drilled towards 270o
(grid west).
- Nominal 80m x 800m spaced grid initially with potential to in-fill to 400m spacing as results and
geology dictate, as shown on Figure 3.
- 3m composite samples with 50g fire assay for gold.
- Bottom-of-hole with selected multi-element assays.
- Barren surface cover is expected to average 10-12m down-hole.
Talisman Mining | Suite 1, Ground Floor, 33 Colin St, West Perth 6005
ABN 71079 536 495 talismanmining.com.au
4August2024
ASX Announcement
1
Tomingley Gold Project – Geological Setting and Mineralisation. Chalmers, Ransted, Kairatis and Meates 2015.
2
Tomingley Gold Operations – Mineral Resource Statement 30 June 2025
Figure 2. Regional geology plan of the Junee-Narromine Volcanic Belt illustrating the gold and copper-gold
deposits of the region. Talisman tenure in the belt consists of four El’s. The East Peak Hill Project is located on EL
9395, approximately 10km south-east of the Tomingley Gold Operation.1
Talisman Mining | Suite 1, Ground Floor, 33 Colin St, West Perth 6005
ABN 71079 536 495 talismanmining.com.au
4August2024
ASX Announcement
1
Tomingley Gold Project – Geological Setting and Mineralisation. Chalmers, Ransted, Kairatis and Meates 2015.
2
Tomingley Gold Operations – Mineral Resource Statement 30 June 2025
Figure 3. The proposed AC drilling program at East Peak Hill over regional magnetics and structural
interpretation. Red outlines highlight anomalously strong magnetic features which are interpreted as andesitic
and or mafic intrusions. Limited Auger drilling in the northern part of the prospect has highlighted anomalous
pathfinder elements on either side of the interpreted intrusion.
Talisman Mining | Suite 1, Ground Floor, 33 Colin St, West Perth 6005
ABN 71079 536 495 talismanmining.com.au
4August2024
ASX Announcement
1
Tomingley Gold Project – Geological Setting and Mineralisation. Chalmers, Ransted, Kairatis and Meates 2015.
2
Tomingley Gold Operations – Mineral Resource Statement 30 June 2025
Sample ID Easting Northing Dip EoH (m)
BBB01721 618531 6379831 -90 11.6
BBB01722 618736 6379429 -90 2.1
BBB01723 618639 6379426 -90 7.4
BBB01724 618534 6379427 -90 8.3
BBB01726 618438 6379429 -90 8.5
BBB01727 618529 6379027 -90 9.0
BBB01728 618438 6379030 -90 2.9
BBB01729 618433 6378663 -90 11.6
BBB01730 618335 6378657 -90 15.0
BBB01732 618835 6379830 -90 9.7
BBB01733 618935 6379829 -90 11.3
BBB01734 619038 6379799 -90 1.8
BBB01736 618654 6379027 -90 14.6
BBB01737 618736 6379029 -90 10.1
BBB01740 618737 6378630 -90 14.6
BBB01741 618736 6378736 -90 9.3
BBB01743 619036 6380230 -90 2.1
BBB01744 618636 6380230 -90 9.0
BBB01745 618736 6380230 -90 5.8
BBB01746 618836 6380230 -90 3.5
BBB01747 618936 6380230 -90 2.2
BBB01748 619136 6380230 -90 4.2
BBB01762 619036 6379430 -90 8.7
BBB01765 619337 6379384 -90 7.5
BBB01766 619434 6379468 -90 7.5
BBB01780 620236 6375830 -90 4.2
BBB01781 620311 6375829 -90 4.2
BBB01782 619836 6376194 -90 10.1
BBB01783 619531 6376192 -90 10.1
BBB01786 619756 6376201 -90 5.7
Table 1. East Peak Hill Auger drilling hole Summary.
Management Comment
Talisman’s Managing Director, Andrew Munckton, said:
“The Aircore drilling program we have just commenced is designed to target an interpreted andesitic intrusion
where limited soil geochemistry has defined anomalous pathfinder minerals at the edges of the interpreted
intrusive body. These intrusions and their sheared and faulted contacts with the surrounding rocks provide the
host to a number of significant gold deposits at the nearby Tomingley Gold Mine, operated by Alkane Resources.
Talisman Mining | Suite 1, Ground Floor, 33 Colin St, West Perth 6005
ABN 71079 536 495 talismanmining.com.au
4August2024
ASX Announcement
1
Tomingley Gold Project – Geological Setting and Mineralisation. Chalmers, Ransted, Kairatis and Meates 2015.
2
Tomingley Gold Operations – Mineral Resource Statement 30 June 2025
“These broad 400m and 800m spaced lines of AC drilling will provide a regional-scale test of the target. Previous
Auger drilling by Talisman was partially successful at penetrating the barren cover that conceals the deposits of
the area. Where the Auger drilling was successful anomalous pathfinder minerals have been recorded, giving us
confidence that we are in the right environment for the style of orogenic gold mineralisation that we are targeting.
“The East Peak Hill Project has not been systematically tested by drilling and success in this AC program would
provide a strong indicator of the prospectivity of this extensive 10km-long target corridor.
“The initial drilling program is expected to take 3-5 weeks to complete with assays expected a further 2-4 weeks
following the completion of drilling.”
–– Ends ––
For further information, please contact:
Andrew Munckton - Managing Director
+61 4 3563 5598
Nicholas Read (Media inquiries)
+61 4199 29046
This release has been authorised by the Board of Talisman Mining Limited.
Talisman Mining | Suite 1, Ground Floor, 33 Colin St, West Perth 6005
ABN 71079 536 495 talismanmining.com.au
4August2024
ASX Announcement
1
Tomingley Gold Project – Geological Setting and Mineralisation. Chalmers, Ransted, Kairatis and Meates 2015.
2
Tomingley Gold Operations – Mineral Resource Statement 30 June 2025
About Talisman Mining
Talisman Mining Limited (ASX: TLM) is an Australian mineral development and exploration company. The
Company’s aim is to maximise shareholder value through exploration, discovery and development of
complementary opportunities in base and precious metals.
Talisman has secured tenements in the Cobar/Mineral Hill region in Central NSW through the grant of its own
Exploration Licenses. The Cobar/Mineral Hill region is a richly mineralised district that hosts several base and
precious metal mines including the CSA, Tritton, and Hera/Nymagee mines. This region contains highly
prospective geology that has produced many long-life, high-grade mineral discoveries. Talisman has identified
several areas within its Lachlan Cu-Au Project tenements that show evidence of base and precious metals
endowment which have had very little modern systematic exploration completed to date.
Talisman also has a significant tenement holding in both the Molong and Junee-Narromine belts within the
Macquarie Arc geological domain. The Macquarie Arc hosts several of Australia’s largest gold and copper-gold
discoveries and operations including, Cadia Valley, North Parkes, Cowal and Tomingley. Talisman believes there
is significant potential for the discovery of substantial copper and gold mineralisation within this land package
and is undertaking active exploration to test a number of these targets.
Competent Person’s Statement
Information in this announcement that relates to Exploration Results and Exploration Targets is based on and
fairly represents information and supporting documentation compiled by Mr Andrew Munckton, who is a
member of the Australasian Institute of Mining and Metallurgy. Mr Munckton is a full-time employee of Talisman
Mining Ltd and has sufficient experience which is relevant to the style of mineralisation and types of deposits
under consideration and to the activities undertaken to qualify as a Competent Person as defined in the 2012
Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr
Munckton has reviewed the contents of this announcement and consents to the inclusion in this announcement
of all technical statements based on his information in the form and context in which they appear.
Forward-Looking Statements
This ASX release may include forward-looking statements. These forward-looking statements are not historical
facts but rather are based on Talisman Mining Ltd.’s current expectations, estimates and assumptions about the
industry in which Talisman Mining Ltd operates, and beliefs and assumptions regarding Talisman Mining Ltd.’s
future performance. Words such as “anticipates”, “expects”, “intends”, “plans”, “believes”, “seeks”,
“estimates”, “potential” and similar expressions are intended to identify forward-looking statements. Forward-
looking statements are only predictions and are not guaranteed, and they are subject to known and unknown
risks, uncertainties, and assumptions, some of which are outside the control of Talisman Mining Ltd. Past
performance is not necessarily a guide to future performance and no representation or warranty is made as to
the likelihood of achievement or reasonableness of any forward-looking statements or other forecast. Actual
values, results or events may be materially different to those expressed or implied in this presentation. Given
these uncertainties, recipients are cautioned not to place reliance on forward looking statements. Any forward-
looking statements in this announcement speak only at the date of issue of this announcement. Subject to any
continuing obligations under applicable law and the ASX Listing Rules, Talisman Mining Ltd does not undertake
any obligation to update or revise any information or any of the forward-looking statements in this
announcement or any changes in events, conditions, or circumstances on which any such forward looking
statement is based.
Talisman Mining | Suite 1, Ground Floor, 33 Colin St, West Perth 6005
ABN 71079 536 495 talismanmining.com.au
4August2024
ASX Announcement
1
Tomingley Gold Project – Geological Setting and Mineralisation. Chalmers, Ransted, Kairatis and Meates 2015.
2
Tomingley Gold Operations – Mineral Resource Statement 30 June 2025
Appendix 2
JORC Tables Section 1 & 2
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down-hole gamma
sondes, or handheld XRF instruments, etc.).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
• Aspects of the determination of mineralisation
that are Material to the Public Report. In
cases where ‘industry standard’ work has
been done this would be relatively simple
(e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3kg was
pulverised to produce a 30 g charge for fire
assay’). In other cases, more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed
information.
TLM Auger Drilling
• Auger samples are collected as one or two metre interval
from bottom of hole via a drill rig mounted Auger drill to
obtain Top of Basement sample
• The Top of Basement sample is sieved to 2mm to obtain a
nominal 1.0kg sample which was collected in a pre-
numbered sample bag.
• Auger samples undergo routine pXRF analysis using an
Olympus Vanta M-series to aid in logging and identifying
zones of interest.
• Sampling is controlled by Talisman protocols and QAQC
procedures as per industry standard and a chain of custody
maintained through transfer to ALS Laboratories in
Adelaide, SA.
• Auger samples were dried, crushed (where required), split
and pulverised (total prep) to produce a master pulp. From
this master pulp, a 0.25g sub sample was taken for multi-
element analysis by four acid digest with an ICP-MS finish.
A 50g sub sample was also taken for fire assay for gold
with ICP-AAS finish.
Drilling
techniques
• Drill type (e.g. core, reverse circulation, open-
hole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (e.g. core diameter,
triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether
core is oriented and if so, by what method,
etc).
Auger drilling to between 2m and 15m to obtain the top of
Basement sample
Drill sample
recovery
• Method of recording and assessing core
and chip sample recoveries and results
assessed.
• Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
• Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
TLM Auger Drilling
• Auger drill sample recovery is generally moderate to high
with sample recoveries and quality recorded in the
database by the Auger operator.
• Sample recoveries were monitored in real-time by the
presence of Talisman personnel at the drill site.
• No known relationship exists between recovery and grade.
• No known bias exists.
Talisman Mining | Suite 1, Ground Floor, 33 Colin St, West Perth 6005
ABN 71079 536 495 talismanmining.com.au
4August2024
ASX Announcement
1
Tomingley Gold Project – Geological Setting and Mineralisation. Chalmers, Ransted, Kairatis and Meates 2015.
2
Tomingley Gold Operations – Mineral Resource Statement 30 June 2025
Criteria JORC Code explanation Commentary
preferential loss/gain of fine/coarse
material.
Logging • Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate
Mineral Resource estimation, mining
studies and metallurgical studies.
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc.) photography.
• The total length and percentage of the
relevant intersections logged.
Auger drilling logging used to identify the appropriate Top
of Basement horizon for sampling
Sub-sampling
techniques and
sample
preparation
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube sampled,
rotary split, etc. and whether sampled wet
or dry.
• For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
• Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.
• Whether sample sizes are appropriate to
the grain size of the material being
sampled.
TLM Auger Drilling
• Auger samples were dried, crushed (where required), split
and pulverised (total prep) to produce a 0.25g sub sample
for base metal analysis or a 50g sub sample for gold
analysis by fire assay.
• QAQC protocols for all Auger sampling involved the use of
Certified Reference Material (CRM) as assay standards.
• All QAQC controls and measures were routinely reviewed.
• Sample size is considered appropriate for geochemical
sampling for base-metal and gold mineralisation given the
nature of drilling and anticipated distribution of
mineralisation.
Quality of assay
data and
laboratory tests
• The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.
• Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory checks) and
whether acceptable levels of accuracy (i.e.
TLM Auger Drilling
• QAQC protocols for all Auger sampling involved the use of
certified reference materials as assay standards, inserted
at a 1 in 25 sampling rate.
• Blank samples were inserted inserted immediately after
samples that were duplicated using a Certified Reference
Material (CRM) coarse blank.
• All assays are required to conform to the procedural
QAQC guidelines as well as routine laboratory QAQC
guidelines.
• All QAQC controls and measures were routinely reviewed.
• Laboratory checks (repeats) occurred at a frequency of 1
in 25. Field duplicates returned a reasonable level of
precision with some minor variation in Au attributed to
nugget effect of gold mineralisation.
Talisman Mining | Suite 1, Ground Floor, 33 Colin St, West Perth 6005
ABN 71079 536 495 talismanmining.com.au
4August2024
ASX Announcement
1
Tomingley Gold Project – Geological Setting and Mineralisation. Chalmers, Ransted, Kairatis and Meates 2015.
2
Tomingley Gold Operations – Mineral Resource Statement 30 June 2025
Criteria JORC Code explanation Commentary
lack of bias) and precision have been
established.
• Each Auger sample undergoes routine pXRF analysis
using an Olympus Vanta M-series to aid in logging and
identifying zones of interest. All pXRF readings were taken
in Geo-Exploration mode with a 45 second 3 beam
reading.
• Standard reference materials were periodically analysed
by the pXRF instrument to monitor performance
Verification of
sampling and
assaying
• The verification of significant intersections
by either independent or alternative
company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Significant intercepts have been verified by alternate
company personnel.
• Logging and sampling data is captured on laptops using
industry standard software.
• Assay data is uploaded to a secure database directly from
the CSV file provided by the laboratory.
Primary laboratory assay data is always kept and is not
replaced by any adjusted or interpreted data.
Location of data
points
• Accuracy and quality of surveys used to
locate drill-holes (collar and down- hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic
control.
TLM Auger drilling
• Collar locations are located using a handheld GPS.
• Final collar locations are also picked up using a hand-held
DGPS unit with +/- 2m accuracy.
• The coordinate system used is the Geocentric Datum of
Australia (GDA) 1994. All coordinates are in the Map Grid
of Australia zone 55 (MGA), Universal Transverse
Mercator.
Data spacing
and distribution
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and distribution
is sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
• Whether sample compositing has been
applied.
TLM Auger drilling
• Drill hole spacing undertaken on a nominal 400m line
spacing and 100m hole spacing at the East Peak Hill
Project
• Other drill spacing varies depending on requirements.
• No Mineral Resource is being reported for the East Peak
Hill
• No sample compositing has been applied.
Orientation of
data in relation
to geological
structure
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
• Samples were taken according to observations at the time
in the field.
• The TLM vertical Auger drill holes were directed as best
as reasonably possible directly across the interpreted
mineralisation orientation.
• The orientation of drilling was designed to achieve
relatively unbiased sampling.
• No sample bias due to drilling orientation is known.
Talisman Mining | Suite 1, Ground Floor, 33 Colin St, West Perth 6005
ABN 71079 536 495 talismanmining.com.au
4August2024
ASX Announcement
1
Tomingley Gold Project – Geological Setting and Mineralisation. Chalmers, Ransted, Kairatis and Meates 2015.
2
Tomingley Gold Operations – Mineral Resource Statement 30 June 2025
Criteria JORC Code explanation Commentary
should be assessed and reported if
material.
Sample security • The measures taken to ensure sample
security.
• TLM Auger drilling samples were stored on site prior to
submission under the supervision of the Senior Geologist.
Samples were transported to ALS Chemex Laboratories
Adelaide by an accredited courier service or by company
personnel using secure company vehicles.
Audits or
reviews
• The results of any audits or reviews of
sampling techniques and data.
• No external audits or reviews of the sampling techniques
and data have been completed.
Section 2 – Reporting of Exploration Results
(Criteria in the preceding section apply to this section)
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or
national park and environmental settings.
• The security of the tenure held at the time of
reporting along with any known impediments
to obtaining a licence to operate in the area.
• The East Peak Hill project consists of a single
Exploration licence
o EL9395 held 100% by Haverford Holdings a 100%
owned subsidiary of Talisman Mining
• Land Access Agreements are in place with Landholders
covering approximately 60% of the target stratigraphy
for the completed Auger program and the proposed AC
drilling program.
• Further landholder access agreements are currently
being negotiated to allow extension of the program to
the remaining 40% of the target stratigraphy
• No Native Title claim over the area of EL9395 is known
to exist.
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration
by other parties.
• The East Peak Hill Project has been subject to limited
exploration by previous explorers including Geopecko,
Western Plains and Goldfields Australasia Pty Ltd. No
exploration data from previous exploration is reported.
• Geological interpretation and geophysics (magnetics)
acquired by TLM from 2005 and 2011 reprocessed and
interpreted by Southern Geoscience and TLM.
• The reprocessed 2005 survey reported was completed
by UTS geophysics at 100m line spacing and 30m
sensor height reprocessed by Southern Geoscience in
2022.
Talisman Mining | Suite 1, Ground Floor, 33 Colin St, West Perth 6005
ABN 71079 536 495 talismanmining.com.au
4August2024
ASX Announcement
1
Tomingley Gold Project – Geological Setting and Mineralisation. Chalmers, Ransted, Kairatis and Meates 2015.
2
Tomingley Gold Operations – Mineral Resource Statement 30 June 2025
Criteria JORC Code explanation Commentary
• The 2011 Survey by UTS Aeroquest for Goldfields
Australasia Pty Ltd was completed at 50m line spacing
and 40m sensor height.
Geology • Deposit type, geological setting and style of
mineralisation.
• The East Peak Hill Project lies within the Junee-
Narromine belt in NSW, which is considered prospective
for Porphyry Copper (Cu-Au) and volcanic hosted,
orogenic (Au) and intrusion related deposits (Au, Cu).
Drill-hole
Information
• A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill-holes:
• easting and northing of the drill-hole collar
• elevation or RL (Reduced Level –
elevation above sea level in metres) of the
drill-hole collar
• dip and azimuth of the hole
• down hole length and interception depth
• hole length.
• If the exclusion of this information is justified
on the basis that the information is not
material and this exclusion does not detract
from the understanding of the report, the
Competent Person should clearly explain why
this is the case.
• Auger sampling undertaken at nominal 400m x 100m
spacing.
• Holes are drilled vertically
Data
aggregation
methods
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
material and should be stated.
• Where aggregate intercepts incorporate short
lengths of high-grade results and longer
lengths of low grade results, the procedure
used for such aggregation should be stated
and some typical examples of such
aggregations should be shown in detail.
• The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
• NA
Talisman Mining | Suite 1, Ground Floor, 33 Colin St, West Perth 6005
ABN 71079 536 495 talismanmining.com.au
4August2024
ASX Announcement
1
Tomingley Gold Project – Geological Setting and Mineralisation. Chalmers, Ransted, Kairatis and Meates 2015.
2
Tomingley Gold Operations – Mineral Resource Statement 30 June 2025
Criteria JORC Code explanation Commentary
Relationship
between
mineralisation
widths and
intercept
lengths
• These relationships are particularly important
in the reporting of Exploration Results.
• If the geometry of the mineralisation with
respect to the drill-hole angle is known, its
nature should be reported.
• If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole length,
true width not known’).
• NA
Diagrams • Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported These should include but not be
limited to a plan view of drill-hole collar
locations and appropriate sectional views.
• Appropriate maps with scales are included within the body
of the accompanying document.
Balanced
reporting
• Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
• All relevant data is reported and provides an appropriate
representation of the results.
• The accompanying document is considered to represent a
balanced report.
Other
substantive
exploration
data
• Other exploration data, if meaningful and
material, should be reported
Share your feedback
Discover