Maiden Drill Program Commences at Mabel Creek IOCG Project
Released
Released
Announcement PDF
4 August 2024
ASX Announcement
Maiden Drill Program Commences at Mabel Creek
IOCG Project, South Australia
Highlights:
•
A four hole, 2,400m mud rotary (MR) and diamond drilling (DD) exploration program has commenced at
the Mabel Creek IOCG Project in South Australia.
•
Drilling is designed to test several large, near-coincident gravity and magnetic targets (IOCG style) along
an interpreted E-W oriented fault.
Talisman Mining Limited (ASX: TLM, Talisman) is pleased to advise that it has commenced its maiden
exploration drilling program at the 100%-owned Mabel Creek Iron Oxide Copper Gold (IOCG) Project in central
South Australia.
Mabel Creek
The Mabel Creek Project is located 30km west of Coober Pedy in South Australia’s Gawler Craton and
comprises three Exploration Licences spanning an area of approximately 1,040km2.
Mabel Creek is prospective for large-scale, intrusion related, IOCG style deposits containing copper, gold, silver
and rare earth metals. The tenure is situated within the interpreted boundaries of the South Australian IOCG
corridor within the Proterozoic-age Gawler Craton which hosts the world class Olympic Dam, Carrapateena and
Prominent Hill deposits (see Figure 1). The project is surrounded by tenements owned and actively explored by
Australia’s biggest resource companies including BHP, Rio Tinto and FMG (see Figure 1).
A detailed gravity survey completed by Talisman in 2024 identified near-coincident magnetic and gravity
features located adjacent to district-scale faults and intrusions prospective for IOCG style targets.
Talisman’s geophysical consultants reprocessed 2008-2009 Geological Survey of South Australia (GSSA)
seismic reflection data over the Mabel Creek project and combined it with the 2024 detailed gravity survey. This
combined work identified several strong, gravity and magnetic anomalies associated with an interpreted
regional, E-W oriented fault and Mesoproterozoic basin volcanic rocks (see Figure 2 and Figure 3).
Near-coincident gravity and magnetic features associated with Mesoproterozoic volcanic basin fill, are
considered indicators of possible IOCG-style mineralisation in the district. Similar geophysical features host
the Prominent Hill IOCG deposit approximately 100km to the south-east of Mabel Creek.
Talisman is currently executing a first pass mud rotary and diamond drilling program comprising up to four holes
for 2400m (see Figure 2 and Figure 3). The near-coincident gravity/magnetic targets are located beneath post
mineral cover, the base of which is indicated by the GSSA seismic line to be between 200m and 350m deep.
The first pass program will test four priority targets. Additionally, several other gravity/magnetic targets have
been identified within the project area and may be drill tested if the initial drill program is successful.
talismanmining.com.au
1
4 August 2024
ASX Announcement
Figure 1 – Mabel Creek tenure and project location map. Mabel Creek sits in the NW sector of the Prospective
IOCG corridor approximately 100km NW of Prominent Hill (BHP).
talismanmining.com.au
2
4 August 2024
ASX Announcement
Figure 2 – Mabel Creek tenure with inserted processed gravity target images. Targets P1 to P4 sit adjacent to the
interpreted E-W oriented faulting.
talismanmining.com.au
3
4 August 2024
ASX Announcement
Figure 3 – Mabel Creek tenure on a TMI VRTP magnetic image. Targets P1 to P4 sit adjacent to the interpreted EW oriented faulting.
talismanmining.com.au
4
4 August 2024
ASX Announcement
Figure 4 – DDH1 drill rig on hole at Target P4. See Figure 2 and Figure 3 for location.
Management Comment
“We are delighted to have commenced our maiden drilling program at Mabel Creek testing four high-priority
targets generated through a combination of interpretation of our recent detailed gravity survey and reprocessing of historical seismic data. Each target offers significant scale and all are associated with near
coincident gravity/magnetic anomalies adjacent to an interpreted east-west trending fault, which are part of the
well-known South Australian IOCG corridor that hosts a number of world-class deposits and mines.”
“Final heritage clearance and SA government approvals for drilling were received earlier this month, with our
maiden drill hole now underway. Results from this drilling program will help guide the exploration approach
adopted across the broader project area, including several other targets identified by the gravity survey and
seismic re-interpretation.
“This initial drilling campaign at Mabel Creek is part of Talisman’s multi-pronged approach to the discovery of
Tier-1 deposits, and we look forward to updating the market once drilling results have been received.”
–– Ends ––
For further information, please contact:
Andrew Munckton - Managing Director
talismanmining.com.au
5
4 August 2024
ASX Announcement
+61 4 3563 5598
Nicholas Read (Media inquiries)
+61 4199 29046
This release has been authorised by the Board of Talisman Mining Limited.
About Talisman Mining
Talisman Mining Limited (ASX: TLM) is an Australian mineral development and exploration company. The
Company’s aim is to maximise shareholder value through exploration, discovery and development of
complementary opportunities in base and precious metals.
Talisman has secured tenements in the Cobar/Mineral Hill region in Central NSW through the grant of its own
Exploration Licenses and through a joint venture agreement. The Cobar/Mineral Hill region is a richly mineralised
district that hosts several base and precious metal mines including the CSA, Tritton, and Hera/Nymagee mines.
This region contains highly prospective geology that has produced many long-life, high-grade mineral
discoveries. Talisman has identified several areas within its Lachlan Cu-Au Project tenements that show
evidence of base and precious metals endowment which have had very little modern systematic exploration
completed to date. Talisman believes there is significant potential for the discovery of substantial base metals
and gold mineralisation within this land package and is undertaking active exploration to test a number of these
targets.
Talisman also has secured access to over 1040 km2 of highly prospective tenure in South Australia’s Gawler
Craton known as the Mabel Creek Project. Mabel Creek is prospective for large scale Iron Oxide Copper Gold
(IOCG) deposits and intrusion related rare earths and battery metals mineralisation. Mabel Creek is surrounded
by similar tenure owned and being actively explored by Australia’s biggest resource companies including BHP,
Rio Tinto and FMG.
Competent Person’s Statement
Information in this announcement that relates to Exploration Results and Exploration Targets is based on and
fairly represents information and supporting documentation compiled by Dr Tim Sharp, who is a member of the
Australasian Institute of Geoscientists. Dr Sharp is a full-time employee of Talisman Mining Ltd and has
sufficient experience which is relevant to the style of mineralisation and types of deposits under consideration
and to the activities undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Dr Sharp has
reviewed the contents of this announcement and consents to the inclusion in this announcement of all
technical statements based on his information in the form and context in which they appear.
talismanmining.com.au
6
4 August 2024
ASX Announcement
Forward-Looking Statements
This ASX release may include forward-looking statements. These forward-looking statements are not historical
facts but rather are based on Talisman Mining Ltd.’s current expectations, estimates and assumptions about the
industry in which Talisman Mining Ltd operates, and beliefs and assumptions regarding Talisman Mining Ltd.’s
future performance. Words such as “anticipates”, “expects”, “intends”, “plans”, “believes”, “seeks”,
“estimates”, “potential” and similar expressions are intended to identify forward-looking statements. Forwardlooking statements are only predictions and are not guaranteed, and they are subject to known and unknown
risks, uncertainties, and assumptions, some of which are outside the control of Talisman Mining Ltd. Past
performance is not necessarily a guide to future performance and no representation or warranty is made as to
the likelihood of achievement or reasonableness of any forward-looking statements or other forecast. Actual
values, results or events may be materially different to those expressed or implied in this presentation. Given
these uncertainties, recipients are cautioned not to place reliance on forward looking statements. Any forwardlooking statements in this announcement speak only at the date of issue of this announcement. Subject to any
continuing obligations under applicable law and the ASX Listing Rules, Talisman Mining Ltd does not undertake
any obligation to update or revise any information or any of the forward-looking statements in this
announcement or any changes in events, conditions, or circumstances on which any such forward looking
statement is based.
talismanmining.com.au
7
4 August 2024
ASX Announcement
Appendix 1
JORC Tables Section 1 & 2
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria
Sampling
techniques
JORC Code explanation
•
•
•
Drilling
techniques
Drill sample
recovery
•
Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down-hole gamma
sondes, or handheld XRF instruments, etc.).
These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
Aspects of the determination of mineralisation
that are Material to the Public Report. In
cases where ‘industry standard’ work has
been done this would be relatively simple
(e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3kg was
pulverised to produce a 30 g charge for fire
assay’). In other cases, more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed
information.
Commentary
•
•
•
•
Drill type (e.g. core, reverse circulation, openhole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (e.g. core diameter,
triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether
core is oriented and if so, by what method,
etc).
•
•
Method of recording and assessing core
and chip sample recoveries and results
assessed.
•
•
Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
•
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
•
Diamond drill core samples, either PQ, HQ3 or NQ2 in size
diameter, are either cut in half longitudinally or a quarter
longitudinally, using an automated Almonte core saw Core
was placed in boats, holding core in place. Core sample
intervals varied from 0.2 to 1.3m in length but were
predominantly aligned to 1m intervals or with sample
boundaries which respected geological contacts.
Sampling is controlled by Talisman protocols and QAQC
procedures as per industry standard and a chain of custody
maintained through transfer to ALS Laboratories in
Adelaide, SA.
Diamond drill core samples are dried, crushed (where
required), split and pulverised (total prep) to produce a
master pulp. From this master pulp, a 0.25g sub sample
was taken for multi-element analysis by four acid digest
with an ICP-MS finish. A 50g sub sample was also taken
for fire assay for gold with ICP-AES finish.
Mud Rotary (MR) chips will be sampled from sieved 6m
composites and will be analysed using a portable XRF.
Drilling will be undertaken by DDH1 Drilling Pty Ltd
Multipurpose UDR1000 truck mounted rig. Mud Rotary
drilling is expected to be completed through the 200m350m thick
Mesozoic and Palaeozoic cover sequences. Diamond drill
tails will then be undertaken in the Proterozoic basement to
a maximum depth of 600m. Down hole surveys will be
undertaken approximately every 30m using an Axis north
seeking gyro.
Core recovery data recorded for each run by measuring
total length of core retrieved against the downhole interval
drilled and stored in the database. TLM representatives
continuously monitor core recovery and core presentation
quality as drilling is conducted and issues or discrepancies
are rectified promptly to maintain industry best standards.
talismanmining.com.au
8
4 August 2024
ASX Announcement
Criteria
JORC Code explanation
Commentary
preferential loss/gain of fine/coarse
material.
Logging
•
•
•
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate
Mineral Resource estimation, mining
studies and metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc.) photography.
The total length and percentage of the
relevant intersections logged.
•
•
•
•
•
•
•
•
Sub-sampling
techniques and
sample
preparation
•
If core, whether cut or sawn and whether
quarter, half or full core taken.
•
If non-core, whether riffled, tube sampled,
rotary split, etc. and whether sampled wet
or dry.
•
For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
•
Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
•
Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.
•
Whether sample sizes are appropriate to
the grain size of the material being
sampled.
•
•
•
•
•
•
•
Diamond Drilling (DD) and Mud Rotary drilling (MR) logging
is carried out on site once geology personnel retrieve core
or chip trays from the drill rig site.
Logging records lithology, mineralogy, mineralisation,
alteration, structure, weathering, colour and other primary
features of the rock samples and is considered to be
representative across the intercepted geological units.
All drill-holes are logged in full to end of hole.
Collar coordinates, azimuth, dip, depth and sampling
intervals are also recorded.
Logging is both qualitative and quantitative depending on
the field being logged. Logging of diamond drill core
includes geotechnical data, RQD and core recoveries.
Diamond drill core is photographed prior to any cutting
and/or sampling and then stored onsite in the Lachlan
Copper -Gold Project. Photographs are available for every
diamond drillhole completed.
Mud Rotary chips will be photographed in trays.
All information collected is entered directly into laptop
computers or tablets, validated in the field, and then
transferred to the database. The level of logging detail is
considered appropriate for exploration and to support
appropriate mineral resource estimation, mining studies,
and metallurgical studies.
Diamond drill core (NQ3, HQ or PQ) samples collected for
analysis are longitudinally cut in half, and quarters for the
QAQC samples using a using an automated Almonte core
saw. Core was placed in boats, holding core in place.
Diamond half core or quarter core sample intervals typically
vary from 0.2m to 1.3m in length. 1m sample intervals were
favoured and are the most common method of sampling,
however sample boundaries do principally coincide with
geological contacts. The remaining core was retained in
core trays.
Samples are dispatched to a sample preparation lab in
Adelaide ALS where they are dried, crushed (where
required), split and pulverised (total prep) to produce a
0.25g sub sample for base metal analysis or a 50g sub
sample for gold analysis by fire assay.
QAQC protocols for all diamond drill core sampling
involved the use of Certified Reference Material (CRM) as
assay standards.
All QAQC controls and measures were routinely reviewed.
Sample size is considered appropriate for geochemical
sampling for base-metal and gold mineralisation given the
nature of drilling and anticipated distribution of
mineralisation.
Mud Rotary (MR) drill chips will be sampled from 6m
composites and will be analysed using a portable XRF.
talismanmining.com.au
9
4 August 2024
ASX Announcement
Criteria
JORC Code explanation
Quality of assay
data
and laboratory
tests
•
•
•
Verification of
sampling and
assaying
Location of data
points
Data spacing
and distribution
•
The nature, quality and
appropriateness of the assaying and
laboratory procedures used and
whether the technique is considered
partial or total.
For geophysical tools, spectrometres,
handheld XRF instruments, etc, the
parametres used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
•
•
•
•
Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and
precision have been established.
•
The verification of significant intersections
by either independent or alternative
company personnel.
•
•
The use of twinned holes.
•
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
•
Discuss any adjustment to assay data.
•
Accuracy and quality of surveys used to
locate drill-holes (collar and down- hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
•
Specification of the grid system used.
•
Quality and adequacy of topographic
control.
•
Data spacing for reporting of Exploration
Results.
•
Whether the data spacing and distribution
is sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
•
Commentary
•
•
•
•
•
•
Geochemical analysis is carried out on all diamond drill
core samples using a standardised analytical suite and
sample preparation protocol.
A multi (48) analysis by 4-acid digest with ICP-MS
determination (ME-MS61). Over-limit Pb, Zn, Cu, Ag
samples are re-assayed by 4 acid digest with ICP finish
(OG 62 and OG 62h).
Au analysis by fire assay/AAS Finish (AA24). Over-limit Au
by fire-assay and gravimetric finish (GRA-21).
QAQC protocols for all DD sampling involved the use of
certified reference materials as assay standards, inserted
at a 1 in 25 sampling rate.
Field duplicates and blanks are introduced in areas of
identified mineralisation.
All assays are required to conform to the procedural QAQC
guidelines as well as routine laboratory QAQC guidelines.
All QAQC controls and measures were routinely reviewed.
Laboratory checks (repeats) occurred at a frequency of 1 in
25.
Significant intercepts are verified by alternate company
personnel.
Logging and sampling data is captured and imported using
Industry standard software.
Assay data is uploaded to a secure database directly from
the CSV file provided by the laboratory.
Primary laboratory assay data is always kept and is not
replaced by any adjusted or interpreted data.
•
Talisman drill collar locations are pegged using a handheld GPS. Final collar locations were also picked up using
a hand-held GPS with +/- 3m accuracy. The coordinate
system used is the Geocentric Datum of Australia (GDA)
1994. All coordinates are in the Map Grid of Australia zone
53 (MGA), Universal Transverse Mercator.
•
Drill spacing at all projects varies depending on
requirements.
No Mineral Resource is being reported for Mabel Creek
Projects.
No sample compositing has been applied.
•
•
Whether sample compositing has been
applied.
talismanmining.com.au
10
4 August 2024
ASX Announcement
Criteria
JORC Code explanation
Commentary
•
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
•
•
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
•
Sample security
•
The measures taken to ensure sample
security.
•
Audits or
reviews
•
The results of any audits or reviews of
sampling techniques and data.
•
Orientation of
data in relation
to geological
structure
Talisman drill holes are designed to traverse approximately
normal to dominant mineralised trends interpreted for each
target. The orientation of key structures may be locally
variable and any relationship to mineralisation has yet to be
identified.
At this early stage of exploration, drilling and geological
knowledge of the project, accurate true widths are yet to be
determined.
Drill samples stored on site at the remote Talisman yard
prior to submission under the supervision of the Senior
Geologist. Samples were transported to ALS Chemex
Laboratories Adelaide by an accredited courier service or
by company personnel using secure company vehicles.
No external audits or reviews of the sampling techniques
and data have been completed.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section)
Criteria
JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status
•
•
•
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or
national park and environmental settings.
The Mabel Creek Project currently comprises three
granted exploration licences:
o
The security of the tenure held at the time of
reporting along with any known impediments
to obtaining a licence to operate in the area.
EL6627 was granted on the 13/08/2021 for an initial
6 year period and is held 100% by Haverford Pty
Ltd. EL6619 and EL 6620 were granted on the
19/07/2021 for an initial 6 year period and are held
100% by Haverford Pty Ltd.
o Native Title and Land Access Agreement fully
executed between Talisman Mining Limited and the
Antakirinja Matu-Yankunytjatjara Aboriginal
(AMYAC) Corporation in September 2023.
o Project Heritage Access Clearance survey (ACS)
completed by (AMYAC) for all planned drill pads and
access tracks. All tenements are in good standing
and there are no existing known impediments to
exploration or mining.
Exploration
done by other
parties
•
Acknowledgment and appraisal of exploration
by other parties.
•
The Mabel Creek Project has been subject to
exploration by numerous previous explorers.
Exploration work has included geophysics (gravity and
magnetics) diamond drilling and geological
interpretation.
talismanmining.com.au
11
4 August 2024
ASX Announcement
Criteria
JORC Code explanation
Commentary
Geology
•
Deposit type, geological setting and style of
mineralisation.
•
Drill-hole
•
A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill-holes:
•
All historical drilling intercepts have been appropriately
referenced to source information. Historical drilling
intercepts have been appropriately referenced to source
information.
•
easting and northing of the drill-hole collar
•
•
elevation or RL (Reduced Level –
elevation above sea level in metres) of the
drill-hole collar
The Mabel Creek Project has only 16 historical holes
which have intersected basement with no mineralised
grades of significance reported, only evidence of
alteration.
•
dip and azimuth of the hole
•
down hole length and interception depth
•
hole length.
Information
Data
aggregation
methods
Relationship
between
mineralisation
widths and
intercept
lengths
•
If the exclusion of this information is justified
on the basis that the information is not
material and this exclusion does not detract
from the understanding of the report, the
Competent Person should clearly explain why
this is the case.
•
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
material and should be stated.
•
Where aggregate intercepts incorporate short
lengths of high grade results and longer
lengths of low grade results, the procedure
used for such aggregation should be stated
and some typical examples of such
aggregations should be shown in detail.
•
The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
•
These relationships are particularly important
in the reporting of Exploration Results.
•
If the geometry of the mineralisation with
respect to the drill-hole angle is known, its
nature should be reported.
The Mabel Creek project lies within the Northern
Gawler Craton of South Australia, it straddles the Mabel
Creek Ridge of Nawa Terrain and the Coober Pedy
Ridge of the Mount Woods Complex. The Mabel Creek
Project is considered prospective for IOCG
mineralisation (eg Olympic Dam and Prominent Hill),
orogenic Au mineralisation and REE. The area is
covered by Mesozoic to Palaeozoic cover
• Significant intercepts are calculated using length weighted
average grade calculations for all elements reported. Core
loss and intervals not sampled within significant intercepts
are excluded from length weighted calculations.
•
•
The orientation of key structures may be locally variable
and the relationship to mineralisation is yet to be identified.
Drill-holes intersections are reported as down hole widths.
talismanmining.com.au
12
4 August 2024
ASX Announcement
Criteria
JORC Code explanation
Commentary
•
If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole length,
true width not known’).
Diagrams
•
Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported These should include but not be
limited to a plan view of drill-hole collar
locations and appropriate sectional views.
•
Appropriate maps with scale are included within the body
of the accompanying document.
Balanced
reporting
•
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
•
All relevant data is reported and provides an appropriate
representation of the results.
The accompanying document is considered to represent a
balanced report.
Other
substantive
exploration
data
•
Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples – size and
method of treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
•
Further work
•
•
The nature and scale of planned further work
(e.g. tests for lateral extensions or depth
extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
•
•
•
•
TLM Ground 2024 gravity survey at Mabel Creek project
was carried out by Atlas Geophysics using Scintrex CG5 or
CG6 gravity meters at variable (typically 250m and 500m)
station spacing (with DGPS topographical correction). Mitre
Geophysics processed the data. Gravity data was reduced
to spherical cap Bouguer anomalies using a reduction
density of 2.3 g/cc to account for near surface terrain
effects. A 5km high pass Gaussian filter was used to
separate target anomalies from the regional background.
Internode Seismic undertook the reprocessing of the 20082009 Geoscience Australia (GA) deep seismic transect
08GA-OM1 between CDP’s 11750 and 12850 which
crosses the Mabel Creek Project Area. The reprocessed
data was interpreted in both 3D and 2D in the open-source
seismic interpretation package OpenDTect v6.6.4 by Mitre
Geophysics.
All meaningful and material information is reported.
Planned future work at Mabel Creek project includes
MR/diamond drilling and geophysical surveys.
talismanmining.com.au
13
Share your feedback
Discover