Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
12 April 2024
March 2024 Quarterly Activities Report
Emerging base and precious metals discoveries at Rip N Tear and Durnings
prospects in NSW; Exploration commences at Mabel Creek IOCG Project in SA
Highlights:
Lachlan Project, NSW
Rip & Tear
• Latest assays confirm lead-silver-zinc mineralisation at Rip n Tear over a strike length of +1.8km and
down-hole widths of up to 200m, highlighting the substantial scale of the system.
• Diamond extension to MYRCD0009 was designed to test for depth extensions and continuity of
mineralisation from previous broad RC intercepts at the northern MLEM anomaly. Results include:
o
MYRCD0009 DD Tail: 19m at 1.4% Pb, 12.2g/t Ag, 0.05% Zn from 167m to 186m
o
Combined RC + DD tail: 86m at 0.8% Pb, 6.6g/t Ag, 0.04% Zn from 100m to 186m
• Diamond hole MYDD0012 was drilled to test mineralisation down-dip/plunge of the discovery hole
MYRCDD0002. Results include:
o
MYDD0012: 87m at 0.5% Pb, 5.3g/t Ag, 0.05% Zn from 261m to 348m
Durnings
• Ongoing drilling indicates a significant emerging base and precious metals discovery at Durnings,
with follow-up RC and diamond drilling intersecting broad zones of mineralisation.
• Diamond hole DRRCD0019, drilled adjacent to discovery hole DRRCD006, intersected two zones
of strong galena-sphalerite-chalcopyrite (lead-zinc-copper) mineralisation (assays awaited):
o
Upper Zone – 26.1m containing massive, semi-massive, matrix and laminated galenasphalerite and minor chalcopyrite from 202m down-hole.
o
Deep Zone – 25.1m of massive, semi-massive, matrix and blebby galena-sphalerite and
chalcopyrite from 374.0m down-hole in an extensively altered quartz breccia zone.
• An additional 11 Reverse Circulation drill-holes have been completed to test along strike of the
discovery holes DRRC0006 and DRRCD0019.
Mabel Creek Project, SA
•
Extensive ground gravity survey commenced to generate initial drill targets.
Corporate
• Royalty cash receipts from the Wonmunna Iron Ore Project of $2.5 million received for the quarter.
• Talisman remains well-funded with cash on hand at 31 March of $7.2 million.
1
Lachlan Copper-Gold Project, NSW
Reverse Circulation (RC) and Diamond Drilling
Talisman commenced a 7,200m Reverse Circulation (RC) drilling campaign in September 2023 to
test four high-priority prospects at its 100%-owned Lachlan Project in NSW – Rip N Tear, Durnings,
Noisy Ned and Carpina North.
The Lachlan Project spans the Canbelego-Mineral Hill Volcanic Belt between Condobolin and
Canbelego in NSW and is prospective for large scale porphyry copper-gold and VMS style copperlead-zinc-silver deposits (see Figure 1).
Figure 1 – Lachlan Project location plan highlighting prospect locations along the Canbelego Mineral-Hill Volcanic Belt.
During the March Quarter, positive results were reported from drilling at the Rip N Tear and Durnings
prospects, highlighting the potential for significant mineral discoveries at both projects.
2
Rip N Tear
The Rip N Tear prospect is an under-explored target defined by strongly anomalous base metal soil
geochemistry containing two large, coherent conductive MLEM anomalies. (ASX announcement 8
May 2023).
The prospect is situated within a complex structural setting associated with NNE and NE trending
faults which are interpreted to provide a pathway for mineralised fluids from local granite intrusions.
Historic drilling has been limited to three percussion holes (~61m deep, drilled in 1970’s). The initial
Talisman program consisted of seven RC holes designed to test two conductive anomalies at depth
at approximately 800m to 1,000m drill-hole spacing.
Results from the initial RC drilling (ASX: TLM, 20 October and 6 December 2023). included:
•
MYRC0002 – 192m at 1.32% Pb, 10.1g/t Ag, 0.06% Zn from 40m to 232m end-of-hole;
•
MYRC0003 – 80m at 1.56% Pb, 14.7g/t Ag, 0.11% Zn from 188m to 268m end-of-hole;
•
MYRC0004 – 18m at 0.28% Pb, 5.2g/t Ag and 0.01% Zn from 142m to 160m;
•
MYRC0005 – 6m at 0.81% Pb and 5.6g/t Ag from 44m to 50m;
•
MYRC0006 – 10m at 0.85% Pb, 3.3g/t Ag and 0.02% Zn from 246m to 256m; and
•
MYRC0007 – 10m at 0.81% Pb, 12.4g/t Ag and 0.04% Zn from 222m to 232m.
RC drilling of a further four holes (MYRC008-MYRC0011) for 688m was completed in early
December targeting strike extensions of MYRC0002 and MYRC0003, guided by the extensive
MLEM anomaly (see Figure 2).
Drilled at approximately 500m spacing, these RC holes were designed to target a buried lead-silver
and sulphide-rich sedimentary unit which appears to host the mineralisation.
This RC drilling has intersected broad zones of disseminated galena and silver with accessory
sphalerite with strong sulphide mineralisation in sericite and ankerite/siderite altered sedimentary
rocks in the target position.
Diamond drill tails were completed in December 2023 on RC holes MYRC0002 and MYRC0003 in
the north and MYRC0004 in the south of the Rip n Tear Prospect area. All holes intersected further
significant zones of sulphide mineralisation.
Assay results for both the recent RC and diamond drilling include:
Northern Anomaly
MYRC0008
•
26m at 0.5% Pb, 5.2 g/t Ag, 0.01% Zn, from 152 to 178m end-of-hole
MYRC0009
•
58m at 0.6% Pb, 5.2g/t Ag, 0.04% Zn from 100m to 158m
•
4m at 0.4% Pb, 5.1g/t Ag, 0.06% Zn from 162m to 166m end-of-hole.
3
RC holes MYRC0008 and MYRC0009 were suspended in sulphide mineralisation at their respective
termination depths due to high water inflows.
MYRCD0002
Diamond wedge:
•
70.1m at 1.31% Pb, 12.0g/t Ag, 0.01% Zn from 177.9m to 248m; and
•
24m at 0.80% Pb, 9.9g/t Ag, 0.01% Zn from 270.6m to 294.6m
Combining the parent RC hole with the diamond wedge results in:
•
208.0m at 1.2% Pb, 8.9g/t Ag, 0.06% Zn from 40m to 248m; and
•
24m at 0.80% Pb, 9.9g/t Ag, 0.01% Zn from 270.6m to 294.6m
MYRCDD0003
Diamond Tail:
•
41m at 0.3% Pb, 10.4g/t Ag, 0.02% Zn from 272m to 313m, including:
o
21m at 0.5% Pb, 11.5g/t Ag, 0.02% Zn from 272m to 293m
Combining the parent RC hole with the diamond tail results in:
•
105.0m at 1.3% Pb, 13.5g/t Ag, 0.09% Zn from 188m to 293m.
MYRCD0009
Diamond Tail:
•
19m at 1.4% Pb, 12.2g/t Ag, from 167m to 186.0m
Combining the parent RC hole with the diamond tail results in:
•
86m at 0.8% Pb, 6.6/t Ag, 0.04% Zn from 100m to 186m
MYDD0012
Diamond:
•
87m at 0.5% Pb, 5.3g/t Ag, 0.05% Zn from 261m to 348m, including:
o
38.4m at 0.6% Pb, 5.8g/t Ag, 0.04% Zn from 309.6m to 348m
Southern Anomaly
MYRCD0004
•
59.2m at 0.77% Pb, 1.5g/t Ag, 0.05% Zn from 255m to 314.2m
4
The assay results reported during the March Quarter demonstrate the continuity of the lead-silver
mineralised horizon at Rip n Tear, hosted in a folded and faulted sequence of sediments, over a
strike extent of more than 1.8km and down-hole widths up to 200m, clearly demonstrating the
significant scale of the mineralised system.
Full details of the assay results reported from the Rip n Tear prospect during the March Quarter were
provided in the Company’s ASX Announcements dated 30 January, 26 February and 14 March 2024.
Rip n Tear – Next Steps
The drilling rig completed a diamond tail on MYRCD0008 (assays pending) and a diamond hole from
surface, MYDD0013 (assays pending), to test the mineralised horizon 500m west and 800m east of
MYRCDD0003 (Talisman’s easternmost hole to date) to establish if the mineralisation defined to
date continues to the east (see Figure 2).
Following the completion of this drilling, the diamond drill rig relocated to Durnings to undertake
extension drilling of previously drilled RC holes at that location.
Following the current Durnings RC program, a further RC drilling program at Rip n Tear is planned
to test near-surface mineralisation defined by strongly anomalous surface soil geochemistry, ore
grade rock chips and gossanous outcrop located adjacent to the southern MLEM anomaly.
Figure 2: Rip n Tear RC and diamond drilling results over MLEM Geophysical survey image. True width in MYRCDD002
and MYCRDD003 is approximately 40% to 50% of the down-hole intersection.
5
Figure 3: Rip n Tear – Interpreted section of the Rip n Tear northern MLEM anomaly deposit. True width of the
mineralisation in MYRCDD0002 is approximately 40% to 50% of the down-hole intersection. True width of the
mineralisation in MYDD0012 is approximately 80% of the down-hole intersection.
Durnings
The Durnings Prospect is located approximately 25km north of Condobolin and 35km south-east of
the Rip n Tear discovery within the Lachlan Project area (see Figure 1). Durnings is a lightly explored
project defined by strongly anomalous base metal soil geochemistry and contains two large,
coherent conductive GAIP anomalies located along strike from and to the east of previous RC drilling
results returned from earlier exploration by Talisman Mining (see ASX announcement 15 May 2023).
The prospect is situated within a complex structural setting associated with NNW trending faults
interpreted to be part of the Mineral Hill Fault Zone, which provides a pathway for mineralised fluids
to move upwards from deeper local granite intrusions.
Following the receipt of positive assay results from the Company’s 2023 RC drilling program at
Durnings (reported in the December 2023 Quarterly Report), follow-up RC and diamond drilling
commenced at Durnings in March 2024.
The program comprises four diamond cores drilled to extend RC holes from the November 2023 RC
program (DRRC0006, DRRC0008, DRRC0010 and DRRC0011) that were suspended in
mineralisation, as well as an additional eleven RC holes to test up-dip and immediately along strike
from discovery hole DRRC0006, which intersected (see ASX announcements 14 December 2023,
9 January 2024):
•
24m at 1.5% Pb, 15.6g/t Ag, 0.2% Zn, 0.02% Cu, 0.04g/t Au from 18m to 42m; and
•
42m at 2.3% Pb, 25.3g/t Ag, 1.3% Zn, 0.09% Cu, 0.43g/t Au from 244m to end of hole (eoh)
at 286m, including:
6
o
20m at 3.9% Pb, 45.2g/t Ag, 2.1% Zn, 0.16% Cu and 0.72g/t Au from 260m to 280m
o
6m at 10.3% Pb, 126g/t Ag, 3.5% Zn, 0.4% Cu and 1.93g/t Au from 274m to 280m.
Further RC drilling around other mineralised holes will be dependent upon results of the diamond
core extension program and geological understanding gained from RC drilling adjacent to
DRRC0006.
Preliminary results from this drilling indicate that the first follow-up diamond hole, DRRCD0019,
intersected two significant zones of sulphide mineralisation containing galena, sphalerite and
chalcopyrite in various styles and forms. These include:
§
Upper Zone – 202m to 205.5m – 3.5m down-hole (see Figure 4, Table 1 and Note 1):
o
Disseminated, blebby, matrix and stringer sulphides (pyrite, pyrrhotite sphalerite,
galena, chalcopyrite) within weakly sheared and brecciated carbonate and chlorite
altered very fine-grained volcaniclastics.
Tray 32 – 201.3m to 204.1m
Tray 33 – 204.1m to 207.6m
Figure 4: Upper mineralised zone DRRCD0019. Refer Table 1 for Mineral abundance estimates. See Note 1.
§
Upper Zone – 224.5m to 226.1m – 1.6m down-hole (see Figure 5, Table 1 and Note 1):
o
§
Disseminated, blebby pyrite, pyrrhotite, galena, sphalerite, chalcopyrite with a
massive sulfide zone (224.5m-225.5m) dominated by galena and sphalerite, within
weakly sheared and brecciated carbonate chlorite altered very fine-grained
volcaniclastics.
The Upper Zone intersected in DRRCD0019 is adjacent to and visually similar to the
mineralisation previously intersected in the discovery hole DRRC0006, which assayed:
7
o
o
42m at 2.3% Pb, 25.3g/t Ag, 1.3% Zn, 0.09% Cu, 0.43g/t Au from 244m to end-ofhole (EOH) at 286m, including:
6m at 10.3% Pb, 126g/t Ag, 3.5% Zn, 0.4% Cu and 1.93g/t Au from 274m to 280m
(see ASX announcements 14 December 2023, 9 January 2024)
Massive sulfides
Tray 38 – 221.3 m to 224.6m
Massive sulfides
Tray 39 – 224.6m to 228.1m
q
Figure 5: Upper Mineralised Zone DRRCD0019. Refer Table 1 for mineral abundance estimates. See Note 1.
§
Deep Zone – 374m to 399.1m (see Figure 6, Figure 7, Table 1 and Note 1):
o
25.1 metre zone of quartz sulphide breccia mineralisation west dipping,
discordant to bedding.
o
Two zones of 10.0m and 9.1m down-hole width – Quartz sulphide breccia with
disseminated, blebby galena, chalcopyrite, sphalerite and pyrrhotite within
Girilambone sediments. See Figure 6 and Figure 7.
o
Several zones of massive galena, sphalerite and chalcopyrite, 10cm to 30cm downhole.
o
Chalcedonic vein textures with quartz fragments. Interstitial chalcopyrite and pyrite in
blebs. See Figure 8 and Note 1.
8
Tray 85 – 372.6m to 375.8m
Tray 86 – 375.8m to 379.1m
Tray 87 – 379.1m to 382.3m
Tray 88 – 382.3m to 385.6m
Figure 6: Deep Mineralised Zone DRRCD0019 – Quartz breccia with Galena, Chalcopyrite and Pyrrhotite from 374m to
384m down-hole. Refer Table 1 for Mineral abundance estimates. See Note 1.
9
Tray 90 – 389m to 392.4m
Tray 91 – 392.4m to 395.8m
Tray 92 – 395.8m to 399.4m
Figure 7: Deep Mineralised Zone DRRCD0019 – Quartz breccia with Galena, Sphalerite and Chalcopyrite from 390m to
399.1m down-hole. Refer Table 1 for Mineral abundance estimates. See Note 1.
Note 1. Cautionary Statement
Determination of mineralisation has been based on geological logging, visual observation and confirmation using a pXRF machine. No
pXRF results are reported however the tool was used to verify the mineralisation. pXRF readings may not be representative of the average
concentrations of the elements of interest in a certain volume of material. As such, pXRF results are used as a logging/sampling verification
tool only. Laboratory analysis will be required to determine the level of mineralisation contained in the mineralised zones. Visual estimates
of mineral abundance should never be considered a proxy or substitute for laboratory analyses where concentrations or grades are the
factor of principal economic interest. Visual estimates also potentially provide no information regarding impurities or deleterious physical
properties relevant to valuations.
10
Figure 8: Deep Mineralised Zone DRRCD0019 – Mineralisation styles and textures 374m to 399.1m down-hole. Upper
Panel (field of view 27cm) – Massive sphalerite (25%), quartz breccia (25%), galena (50%). Lower Panel (Field of view
16cm) – Chalcedonic vein textures with interstitial Chalcopyrite (2%-3%), pyrite (3%-5%). Refer Table 1 for Mineral
abundance estimates. See Note 1.
Information relating to the observed sulphide intercepts:
1. The nature of the sulphide minerals:
•
Fine-grained massive sulphide
•
Fine-grained semi-massive sulphide
•
Fine-grained disseminated sulphide
•
Coarse grained clustered sulphide
•
Coarse grained blebby sulphides
•
Sulphide as vein and breccia zone matrix fill
•
Sulphide in stringy shears and bands
11
2. Minerals observed:
•
The minerals visually observed in the drill core are as follows:
• Chalcopyrite, Galena, Sphalerite, Pyrite, Pyrrhotite.
3. Estimates of abundance of minerals observed are provided below:
Hole ID
From
(m)
To
(m)
Length
(m)
Min Style
(Major)
Min Style
(Minor)
DRRCD00019
198
202
4.0
Veins
Disseminated
DRRCD00019
202
205.5
3.5
Veins
Matrix
DRRCD00019
205.5
217.4
11.9
DRRCD00019
217.4
224.5
7.1
Veins
DRRCD00019
224.5
226.1
1.6
Massive
DRRCD00019
226.1
242.3
16.2
Blebby
Veins
DRRCD00019
242.3
259
16.7
Blebby
Veins
1-2%
Clusters
1-2%
1-2%
Chalcopyrite
1%
Galena
Sphalerite
0.5%
1%
5%
10%
Disseminated
Stringy
1%
4%-5%
1%
0.1-1%
70%
20%
9-10%
1-2%
1-2%
310.4
51.4
Veins
DRRCD00019
310.4
331.6
21.2
Clusters
0.1%
0.1%
Clusters
0.1%
0.1%
Veins
0.2%
0.1%
2-3%
7-10%
DRRCD00019
359.6
359.6
374
28.0
14.4
DRRCD00019
374
384
10.0
Semimassive
Veins
DRRCD00019
384
390
6.0
Clusters
Veins
0.2%
Breccia
3-5%
DRRCD00019
390
399.1
9.1
Semimassive
15%
0.1-1%
259
331.6
Pyrrhotite
0.1%-1%
DRRCD00019
DRRCD00019
Pyrite
1-2%
0.5-1%
2%
1%
3%
1%
Table 1 – Summary sulphide mineral abundance logging from DRRCD0019. Referenced to Figures 4, 5, 6, 7, and 8.
Note 1. Cautionary Statement
Determination of mineralisation has been based on geological logging, visual observation and confirmation using a pXRF machine. No
pXRF results are reported however the tool was used to verify the mineralisation. pXRF readings may not be representative of the average
concentrations of the elements of interest in a certain volume of material. As such, pXRF results are used as a logging/sampling verification
tool only. Laboratory analysis will be required to determine the level of mineralisation contained in the mineralised zones. Visual estimates
of mineral abundance should never be considered a proxy or substitute for laboratory analyses where concentrations or grades are the
factor of principal economic interest. Visual estimates also potentially provide no information regarding impurities or deleterious physical
properties relevant to valuations.
The Company has recently completed follow-up RC drilling at Durnings comprising 11 holes,
DRRC0012 to DRRC0022, for 2010 metres, which were designed to provide an initial assessment
of potential parallel mineralised zones and the strike extent of the Upper Zone of mineralisation
intersected in DRRC0006 and DRRCD0019. Two additional sections located 80m north and 80m
south of the central section have been drilled. See Figure 9 for RC hole locations.
A total of six additional RC holes have been completed on the central section (including the precollar for DRRCD0019), the northern section (three RC holes) and the southern section (two RC
holes).
Several of these holes have intersected various zones of anomalous Pb-Zn-Cu-Sulphide
mineralisation as indicated by pXRF field analysis. Assays for all 11 RC holes are awaited. These
samples have been submitted to the assay lab and are expected to be returned in approximately 24 weeks.
12
Indicative zones of anomalous zinc sulphide mineralisation, based on pXRF analysis (see Note 1.)
in the RC holes within the central section are shown on Figure 10.
Next Steps
Diamond drilling targeting the Deep Zone mineralisation and other targets within the broad PDIP
chargeability anomaly continues from established RC holes located on both the central section and
the 80m step-out sections. This drilling will take several more weeks as we progress the
understanding of the mineralisation within the Deep Zone.
Samples for the 11 RC holes have been progressively submitted to ALS since drilling commenced
in mid-March. Assay results for the initial holes DRRC0012-DRRC0016 (Central Section) are
expected to be returned in the next 1-2 weeks. Assays for DRRC0017 to DRRC0022 (Step-Out
sections) are expected in 2-3 weeks.
Diamond cores from DRRCD0019 have been be cut and submitted for assay with results fast-tracked
through the lab and expected to be returned in approximately 3-4 weeks.
A’
A
Figure 9: RC and DD drill hole locations at Durnings over GAIP image. Sections of drill holes are centred on the section
containing the discovery holes DRRC0006 and DRRCD0019. See Figure 10. Other drill sections are located 80m grid
north-west and 80m grid south-east of this section.
13
Figure 10: Central Section A-A’ Durnings. RC holes DRRC0013 to DRRC0016 plotted with pXRF for zinc-sulphur
on drill trace. (See Note 1). Broad zones of zinc-sulphur anomalism in DRRC0013, DRRC0014 and DRRC0015 are
indicated, implying other parallel zones of steeply-dipping base metal mineralisation may be present. Also note the drill
trace of DRRCD0019 targeting the deeper chargeability anomaly defined by PDIP isoshells. Blue (14mV/V), Orange
(18mV/V) and Pink (22mV/V) chargeability isoshells.
14
Mabel Creek IOCG Project, South Australia
Talisman acquired 100% ownership of the Mabel Creek IOCG Project in June 2023, providing
ownership of a significant land package approximately 30km west of Coober Pedy. The land package
covers 1,048km2 of strategic tenure (Figure 11) and spans a major deep-seated east-west trending
fault system which is interpreted to host multiple intrusive lithologies, including the Hiltaba Granite
Suite within the Gawler Craton.
The region is prospective for large-scale Iron Oxide Copper-Gold (IOCG) discoveries and hosts
numerous world-class deposits such as Olympic Dam, Carrapateena and Prominent Hill as well as
significant recent discoveries such as Oak Dam and Emmie Bluff.
This region is fast becoming Australia’s premier copper producing area.
Figure 11: Mabel Creek location plan highlighting prospect locations along the Gawler Craton IOCG belt.
Subsequent to the end of the Quarter, Talisman commenced a ground gravity survey at the Mabel
Creek Project, representing the first on-ground exploration work to be undertaken on this project
area for 14 years.
The survey program will cover the entire 1,048sqkm holding, including a number of prospective
magnetic anomalies in the Mabel Creek area. Survey results will be used to generate drill targets for
the planned field program commencing in the second half.
Previous explorers have undertaken limited gravity surveys over small targets over the preceding 20
years of exploration.
15
These gravity programs were located using regional-scale magnetics interpretation. The previous
gravity programs have provided an in-adequate assessment of the prospectivity for IOCG style
mineralisation across the structurally complex area. Historical drill holes within the project area have
intersected basement with evidence of alteration.
Detailed seismic surveys conducted by Geoscience Australia and the Geological Survey of South
Australia, that traverse the project area have highlighted significant additional structural information
on which the existing magnetics (shown in Figure 12) are now interpreted. This new interpretation
highlights potential new IOCG targets in the area which have either regional only or nil gravity
coverage.
The detailed gravity survey is being conducted on 250m to 500m station centres, which is expected
to take 6-8 weeks to complete. Following acquisition, processing is expected to take an additional
two weeks. The survey is being undertaken by Atlas Geophysics.
Figure 12: Mabel Creek magnetics image with interpreted Fault positions and Hiltaba granite intrusion locations.
16
Corporate
Iron Ore Royalty
During the quarter, Talisman received $2.488 million in royalty payments from iron ore sales that
occurred between 1 December 2023 and 29 February 2024 from Wonmunna Iron Ore Pty Ltd
(Wonmunna), a wholly owned subsidiary of Mineral Resources Limited (ASX: MIN, MRL), the owner
and operator of the Wonmunna Iron Ore Mine (WIOM) in the Pilbara region of Western Australia.
The increase in iron ore royalty receipts for the current quarter reflects the impact of consistent
production output, higher global iron ore pricing on WIOM sales made during the quarter and positive
final price adjustments on iron ore sales made in the previous quarter, in accordance with
Wonmunna sales contracts.
Since the commencement of iron ore production at the WIOM in March 2021, total royalty payments
of $20.8 million have been received by Talisman as at the date of this announcement.
Tenure changes and New Project Opportunities
During the quarter, Talisman acquired EL9630 adjacent to the Rip n Tear tenements within the
Lachlan Project. The company disposed of EL8451 an 89% owned tenement within the Peel Mining
JV.
The Company continued to review potential mineral growth opportunities in Australia and elsewhere.
Talisman continues to adopt a judicious approach to the review of all growth opportunities to ensure
only value-accretive transactions that have the potential to create long-term shareholder value are
pursued.
Shareholder Meeting
A General Meeting of the Company’s Shareholders was held on 7 February 2024, with all resolutions
passed on a poll.
Cash Balance
As at 31 March 2024, Talisman had $7.198 million cash available for its operating and investing
activities.
Expenditure on mining exploration activities
In accordance with ASX Listing Rule 5.3.1, the Company advises its exploration and evaluation
expenditure during the December 2023 quarter totalled $2.275 million. This amount is included at
Item 1.2(a) of the Appendix 5B and relates to activities undertaken on the Company’s Lachlan and
Mabel Creek Projects. Expenditure during the quarter included Diamond drilling, RC drilling,
assaying, geophysical surveying, auger drilling, geological mapping activities, tenement
management, and exploration activity planning.
Salaries and fees paid to Directors and their related entities
In accordance with Section 6.1 of the March 2024 Quarter Appendix 5B, Talisman provides the
following in relation to payments made during the quarter to related parties:
Description
Directors Fees
$A’000
156
Explanation
Short term and post-employment benefits paid to directors.
Ends
17
For further information, please contact:
Andrew Munckton – Managing Director
on +61 8 93804230
Nicholas Read (Media inquiries)
on +61 419 929 046
This release has been authorised by the Board of Talisman Mining Limited.
About Talisman Mining
Talisman Mining Limited (ASX:TLM) is an Australian mineral development and exploration company. The Company’s aim is to
maximise shareholder value through exploration, discovery and development of complementary opportunities in base and
precious metals.
Talisman has secured tenements in the Cobar/Mineral Hill region in Central NSW through the grant of its own Exploration Licenses
and through a joint venture agreement. The Cobar/Mineral Hill region is a richly mineralised district that hosts several base and
precious metal mines including the CSA, Tritton, and Hera/ Nymagee mines. This region contains highly prospective geology that
has produced many long-life, high-grade mineral discoveries. Talisman has identified a number of areas within its Lachlan Cu-Au
Project tenements that show evidence of base and precious metals endowment which have had very little modern systematic
exploration completed to date. Talisman believes there is significant potential for the discovery of substantial base metals and
gold mineralisation within this land package and is undertaking active exploration to test a number of these targets.
Competent Person’s Statement
Information in this announcement that relates to Exploration Results and Exploration Targets is based on, and fairly represents
information and supporting documentation complied by Mr Tim Sharp, who is a member of the Australasian Institute of
Geoscientists. Mr Sharp is a full-time employee of Talisman Mining Ltd and has sufficient experience which is relevant to the style
of mineralisation and types of deposits under consideration and to the activities undertaken to qualify as a Competent Person as
defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”.
Mr Sharp has reviewed the contents of this announcement and consents to the inclusion in this announcement of all technical
statements based on his information in the form and context in which they appear.
Forward-Looking Statements
This ASX release may include forward-looking statements. These forward-looking statements are not historical facts but rather
are based on Talisman Mining Ltd.’s current expectations, estimates and assumptions about the industry in which Talisman Mining
Ltd operates, and beliefs and assumptions regarding Talisman Mining Ltd.’s future performance. Words such as “anticipates”,
“expects”, “intends”, “plans”, “believes”, “seeks”, “estimates”, “potential” and similar expressions are intended to identify forwardlooking statements. Forward-looking statements are only predictions and are not guaranteed, and they are subject to known and
unknown risks, uncertainties and assumptions, some of which are outside the control of Talisman Mining Ltd. Past performance
is not necessarily a guide to future performance and no representation or warranty is made as to the likelihood of achievement or
reasonableness of any forward-looking statements or other forecast. Actual values, results or events may be materially different
to those expressed or implied in this presentation. Given these uncertainties, recipients are cautioned not to place reliance on
forward looking statements. Any forward looking statements in this announcement speak only at the date of issue of this
announcement. Subject to any continuing obligations under applicable law and the ASX Listing Rules, Talisman Mining Ltd does
not undertake any obligation to update or revise any information or any of the forward looking statements in this announcement
or any changes in events, conditions or circumstances on which any such forward looking statement is based.
18
Appendix 1
Talisman Tenement Holdings
Project /
Tenement
Location
and
Blocks
(Area)
CENTRAL
LACHLAN
PROJECT
New South Wales
EL8615
(726km2)
EL8659
2
EL8677
EL8414
(174km2)
EL8547
(205km2)
EL8571
(258km2)
100%
EL8658
2
(256km )
EL8680
(20km2)
EL8719
Interest at
End of
Quarter
Acquired
during
Quarter
Surrendered
during
Quarter
100%
100%
-
-
(373km )
100%
100%
-
-
N/A
(193km2)
100%
100%
-
89%
89%
Peel Mining Ltd
100%
-
-
100%
100%
-
-
100%
100%
-
-
100%
100%
-
-
(191km2)
100%
100%
-
-
EL9298
(440km2)
100%
100%
-
-
EL9299
(199km2)
100%
100%
-
-
EL9302
2
(108km )
100%
100%
-
-
EL9306
(327km2)
100%
100%
-
-
EL9315
(103km2)
100%
100%
-
-
EL9379
(878km2)
100%
100%
-
-
EL9462
(8km2)
100%
100%
-
-
EL9630
2
(361km )
100%
100%
-
-
ELVIS
PROJECT
New South Wales
EL8977
(463km2)
100%
100%
-
-
EL9395
(75km2)
100%
100%
-
-
EL9396
(229km2)
100%
100%
-
-
HILLSTON
PROJECT
Interest at
Beginning
of Quarter
Joint Venture
Partner
-
N/A
N/A
New South Wales
EL8907
(372km2)
100%
100%
-
-
EL9394
(399km2)
100%
100%
-
-
N/A
100%
100%
-
-
N/A
51%
51%
-
-
Lucknow Gold Ltd
DANDALOO
Share your feedback