Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
15 January 2024
December 2023 Quarterly Activities Report
Initial RC drilling delivers exciting base metals discoveries at the Rip N Tear
and Durnings prospects in NSW
Highlights:
Lachlan Copper-Gold Project, NSW
Rip & Tear1
• Large zone of lead-silver-zinc mineralisation identified from broad-spaced RC drilling at Rip N Tear:
o
o
192m at 1.3% Pb, 10.0g/t Ag and 0.06% Zn from 40m to 232m down-hole (MYRC0002), incl:
•
20m at 2.7% Pb, 25.4g/t Ag and 0.01% Zn from 194m to 214m, within
•
68m at 1.7% Pb, 16.6g/t Ag and 0.02% Zn from 164m to 232m End-of-Hole (EOH).
80m at 1.56% Pb, 14.7g/t Ag and 0.11% Zn from 180m to 268m down-hole (MYRC0003), incl:
•
42m at 1.95% Pb, 17.0g/t Ag, 0.15% Zn and 0.10% Cu from 226m to 268m, including:
•
6m at 2.56% Pb, 14.6g/t Ag and 0.70% Zn from 262m to 268m End-of-Hole (EOH).
• Deeper diamond drilling is now in progress at Rip N Tear to test underlying Moving Loop
Electromagnetics (MLEM) conductors.
Durnings2
• Wide intercepts of strong lead-zinc-silver-copper-gold mineralisation in RC drilling, targeting a
Gradient Array Induced Polarisation (GAIP) anomaly returned at Durnings:
o
24m at 1.5% Pb, 15.6g/t Ag, 0.2% Zn, 0.02% Cu, 0.04g/t Au from 18m to 42m (DRRC0006);
o
42m at 2.3% Pb, 25.3g/t Ag, 1.3% Zn, 0.09% Cu, 0.43g/t Au from 244m to 286m (DRRC0006)
including:
•
6m at 10.3% Pb, 126g/t Ag, 3.5% Zn, 0.4% Cu and 1.93g/t Au from 274m to 280m.
• A second, larger (GAIP) anomaly at Durnings, located ~800m east of the current drilling, will be
tested by additional RC drilling in the March Quarter.
Corporate
• Royalty cash receipts from the Wonmunna Iron Ore Project of $2.25 million received for the quarter
with a further $0.53 million received subsequent to quarter-end.
• Talisman remains well-funded with cash and investments of $7.90 million at 31 December.
1 Refer Talisman ASX announcement dated 20 October and 6 November 2023 for details.
2 Refer Talisman ASX announcement dated 14 December 2023 for details.
1
Lachlan Copper-Gold Project, NSW
Reverse Circulation (RC) Drilling
Talisman commenced a 7,200m Reverse Circulation (RC) drilling campaign in September 2023 to
test four high-priority prospects at its 100%-owned Lachlan Project in NSW – Rip N Tear, Durnings,
Noisy Ned and Carpina North.
The Lachlan Project spans the Canbelego-Mineral Hill Volcanic Belt between Condobolin and
Canbelego in NSW and is prospective for large-scale porphyry copper-gold and VMS style copperlead-zinc-silver deposits (see Figure 1).
Figure 1 – Lachlan Project location plan highlighting prospect locations along the Canbelego Mineral-Hill Volcanic Belt.
2
During the December Quarter, positive results were reported from drilling at both the Rip N Tear and
Durnings prospects, highlighting the potential for significant mineral discoveries at both projects.
Rip & Tear1
The Rip N Tear prospect is an under-explored target defined by strongly anomalous base metal soil
geochemistry containing two large, coherent conductive MLEM anomalies (see ASX announcement
8 May 2023).
The prospect is situated within a complex structural setting associated with NNE and NE trending
faults which are interpreted to provide a pathway for mineralised fluids from local granite intrusions.
Historic drilling has been limited to three percussion holes (~61m deep, drilled in 1970’s). The drilling
program completed prior to Christmas consisted of seven RC holes designed to test the two
conductive anomalies at depth at approximately 800m to 1,000m drill-hole spacing.
Northern MLEM Anomaly (see Figure 3):
•
RC drilling has so far intersected two broad zones of disseminated galena, silver, minor
sphalerite and pyrite. Results include:
o
o
MYRC0002 – 192m at 1.3% Pb, 10.1g/t Ag and 0.06% Zn from 40m to 232m at Endof-Hole (EOH), including:
§
20m at 2.7% Pb, 25.4g/t Ag and 0.01% Zn from 194m to 214m, within:
§
68m at 1.7% Pb, 16.6g/t Ag and 0.02% Zn from 164m to 232m EOH.
MYRC0003 – 80m at 1.56% Pb, 14.7g/t Ag, 0.11% Zn and 0.05% Cu from 188m to
268m at End-of-Hole (EOH), including:
§
42m at 1.95% Pb, 16.7g/t Ag, 0.19% Zn and 0.01% Cu from 226m to 268m,
including:
§
6m at 2.56% Pb, 14.6g/t Ag and 0.70% Zn from 262m to 268m EOH.
•
Both MYRC0002 and MYRC0003, which are located approximately 1,000m apart, were
suspended in mineralisation due to difficult RC drilling conditions. Diamond tails were
completed for these two RC holes to fully test the targeted MLEM conductor. MYRCD0002
was completed from 232m to 318m and MYRC0003 has been completed from 268m to
411m. Assay results for these diamond tails are pending.
•
MYRC0002 RC results were first reported in late October (see ASX announcement 20
October). MYRC0003 RC results were reported 6 November (see ASX announcement 6
November).
Southern MLEM Anomaly (see Figure 2):
•
Five RC holes completed – MYRC0001 and MYRCD0004 to MYRC0007.
•
MYRC0001 was suspended at 194m – 100m, short of its intended target due to RC drilling
conditions.
3
•
Holes MYRCD0004 to MYRC0007 intersected narrow zones of disseminated galena, silver,
minor sphalerite and pyrite located above the targeted MLEM conductor.
•
Assay results include:
o
MYRCD0004 – 18m at 0.28% Pb, 5.2g/t Ag and 0.01% Zn from 142m to 160m;
o
MYRC0005 – 6m at 0.81% Pb and 5.6g/t Ag from 44m to 50m;
o
MYRC0006 – 10m at 0.85% Pb, 3.3g/t Ag and 0.02% Zn from 246m to 256m; and
o
MYRC0007 – 10m at 0.81% Pb, 12.4g/t Ag and 0.04% Zn from 222m to 232m.
Figure 2 – Rip N Tear drilling over Southern MLEM conductivity heat map and underlying geology and structural interpretation.
•
MYRCD0004 was extended with diamond drilling from 299m to 457m successfully
penetrating the target horizon and underlying unmineralized sediments.
Rip N Tear – Next Steps
Diamond drilling to extend existing RC holes at Rip N Tear re-commenced on 6 January 2024.
RC drilling was completed at an additional four holes (MYRC0008 to MYRC0011) at Rip N Tear,
targeted at the northern MLEM conductor. See Figure 3 for hole locations.
4
These additional RC holes were aimed at intersecting the target horizon at shallow depths and all
were drilled with a northerly azimuth. Diamond drilling to extend these RC holes at Rip N Tear is the
priority work for the diamond rig over January and February 2024.
Figure 3 – Rip N Tear. Locations of additional 4 RC holes MYRC0008 to MYRC0011 and Phase 2 MLEM station locations (red dots)
Durnings2
The Durnings Prospect is a lightly explored project defined by strongly anomalous base metal soil
geochemistry and contains two large, coherent conductive Gradient Array Induced Polarisation
(GAIP) anomalies located along strike from and to the east of previous RC drilling results returned
from earlier exploration by Talisman Mining (see ASX announcement 15 May 2023).
The prospect is situated within a complex structural setting associated with NNW trending faults
interpreted to be part of the Mineral Hill Fault Zone, which is interpreted to provide a pathway for
mineralised fluids to move upwards from deeper local granite intrusions.
Historical drilling at the Durnings Project includes Talisman drilling conducted from early 2023
(DRRC0001 to DRRC0005) and previous percussion drilling (KSRC0008 to KSRC0014). See Figure
4 for drill-hole locations.
Results from earlier RC drilling include3:
3
Refer ASX announcement 12 May 2023 for details.
5
•
DRRC0001 - 8m at 0.27% Pb, 6.3g/t Ag, 0.36% Zn, 0.77% Cu, 6.3g/t Au from 82m
•
DRRC0002 - 12m at 7.72g/t Ag from 74m
•
DRRC0003 - 8m at 15.98g/t Ag and 0.15g/t Au from 98m
•
DRRC0004 - 14m at 7.14g/t Ag and 0.22g/t Au from 64m
•
DRRC0005 - 10m at 5.52g/t Ag from 34m
RC drilling totalling six holes (DRC0006-DRC0011) for 1,710m was completed in late November
2023 targeted at the western GAIP anomaly. All six RC holes drilled at approximately 200m spacing
were designed to target a buried GAIP anomaly modelled to between 50m and 200m below surface.
Results from RC drilling indicate two broad zones of disseminated galena, silver, sphalerite,
chalcopyrite and gold associated with strong sulphide mineralisation in sericite altered volcaniclastic
rocks. Results include4:
Southern Anomaly:
DRRC0006
• 24m at 1.5% Pb, 15.6g/t Ag, 0.2% Zn, 0.02% Cu, 0.04g/t Au from 18m to 42m and;
•
42m at 2.3% Pb, 25.3g/t Ag, 1.3% Zn, 0.09% Cu, 0.43g/t Au from 244m to 286m end of hole
(eoh) including:
o
20m at 3.9% Pb, 45.2g/t Ag, 2.1% Zn, 0.16% Cu and 0.73g/t Au from 260m to 280m
o
6m at 10.3% Pb, 126g/t Ag, 3.5% Zn, 0.4% Cu and 1.93g/t Au from 274m to 280m.
DRRC0007
• 8m at 0.5% Pb, 2.1g/t Ag, 1.3% Zn, 0.02% Cu, 0.11g/t Au from170m-178m.
DRRC0011
• Assays pending
Northern Anomaly:
DRRC0008
• 28m at 0.4% Pb, 7.8g/t Ag, 0.7% Zn, 0.02% Cu, 0.11g/t Au from 4m to 32m including:
o
•
10m at 0.5% Pb, 10.8g/t Ag, 1.8% Zn, 0.03% Cu, 0.15g/t Au from 22m to 32m
30m at 0.4% Pb, 2.7g/t Ag, 0.8% Zn, 0.01% Cu, 0.07g/t Au from 124m to 154m
DRRC0009
• 4m at 0.1% Pb, 14.1g/t Ag, 0.1% Zn, 0.77% Cu, 0.42g/t Au from 32m to 36m and;
•
4
6m at 0.5% Pb, 5.4g/t Ag, 0.7% Zn, 0.19% Cu, 0.29g/t Au from 74m to 80m.
Refer ASX announcement 9 January 2023 for details.
6
DRRC0010
• 10m at 0.9% Pb, 7.1g/t Ag, 2.2% Zn, 0.04% Cu, 0.24g/t Au from 156m to 166m and;
•
10m at 0.4% Pb, 3.9g/t Ag, 0.7% Zn, 0.01% Cu, 0.39g/t Au from 232m to 242m end of hole.
•
Assays for DRRC0011 were submitted to the laboratory approximately 10 days after holes
DRRC0008 to DRRC0010 due to wet weather which hampered access to the drill site.
Results for this hole are expected within the next two weeks.
•
Three of the six holes (DRRC0006, DRRC0010 and DRRC0011) were suspended in sulphide
mineralisation at their various termination depths due to high water inflows. These holes will
be extended with diamond core drilling once the diamond drill rig completes its current
program at the nearby Rip n Tear prospect.
Durnings – Next Steps
The diamond drill rig is scheduled to mobilise to Durnings to extend holes DRRC0006, DRRC0010
and DRRC0011 once drilling at Rip N Tear has been completed. Logging of the RC chips and assay
results indicates that these holes did not penetrate (fully test) beyond the altered sulphide-rich zone
of interest.
In addition to the current target at Durnings, an extensive additional GAIP target located
approximately 800m further east of the recent drilling has been identified in the GAIP survey. See
Figure 6.
This eastern GAIP anomaly spans approximately 1,600m by 250m and is considerably stronger and
larger than the western GAIP anomaly that produced the recent strong RC drilling results.
The new target will be tested with additional RC drill program to determine the source of the
chargeability anomaly. This additional RC drilling program is scheduled to commence in the March
Quarter 2024.
Additional ground-based GAIP surveys may commence following the testing of the eastern
anomaly (subject to encouragement from assay data from DRRC0011 and the additional RC
drilling) to investigate if the target horizon extends further south-east beyond the extent of the
existing GAIP survey See Figure 6.
7
Figure 4 – Durnings RC drilling over GAIP survey image.
8
Figure 5 – Durnings – other targets over GAIP survey image.
Carpina North and Noisy Ned – Exploration Update
RC drilling at both Carpina North and Noisy Ned was completed in November 2023.
No significant assay results were received from either prospect in the 6-hole/1696m RC program
completed at Carpina North or the 5-hole/1,580m program completed at Noisy Ned. Both projects
remain active exploration opportunities and have both been re-prioritised in light of the exploration
results and ongoing work programs at Durnings and Rip N Tear.
Mabel Creek IOCG Project, South Australia
Talisman acquired 100% ownership of the Mabel Creek IOCG Project in June 2023, providing
ownership of a significant land package approximately 30km west of Coober Pedy. The land package
covers 1,048km2 of strategic tenure (Figure 7) and spans a major deep-seated east-west trending
fault system which is interpreted to host multiple intrusive lithologies, including the Hiltaba Granite
9
Suite within the Gawler Craton. The region that is prospective for large-scale Iron Oxide CopperGold (IOCG) discoveries and hosts numerous world-class deposits such as Olympic Dam,
Carrapateena and Prominent Hill as well as significant recent discoveries such as Oak Dam and
Emmie Bluff. This region is fast becoming Australia’s premier copper producing area.
Since completing the project acquisition, Talisman’s work at Mabel Creek has consisted of the
acquisition of geological and geophysical datasets from the SA government database, discussion
and access agreement with Traditional Owners and pastoral leaseholders. The Company expects
to complete heritage and ground based geophysical surveys in the March 2024 quarter.
Figure 6 – Location map of Mabel Creek Project, South Australia.
Corporate
Iron Ore Royalty
During the quarter, Talisman received $2.25 million in royalty payments from iron ore sales that
occurred between 1 September 2023 and 30 November 2023 from Wonmunna Iron Ore Pty Ltd
(Wonmunna), a wholly owned subsidiary of Mineral Resources Limited (ASX: MIN, MRL), the owner
and operator of the Wonmunna Iron Ore Mine (WIOM) in the Pilbara region of Western Australia. An
additional royalty payment of $0.53 million was received subsequent to quarter-end for iron ore
sales from WIOM that occurred during the month of December 2023.
The increase in iron ore royalty receipts in recent months reflects the impact of higher global iron ore
pricing on both WIOM sales made during the quarter and final price adjustments on iron ore sales
10
made in the previous quarter, in accordance with Wonmunna sales contracts5.
Since the commencement of iron ore production at the WIOM in March 2021, total royalty payments
of $15.1 million have been received by Talisman as at the date of this announcement.
New Project Opportunities
During the quarter, Talisman continued to review potential mineral growth opportunities in Australia
and elsewhere. Talisman continues to adopt a judicious approach to the review of all growth
opportunities to ensure only value-accretive transactions that have the potential to create long-term
shareholder value are pursued.
Proposed Grant of Incentive Options to Managing Director
Talisman has agreed, subject to Shareholder approval, to grant 1,250,000 options (Options) to the
Company’s Managing Director, Mr Andrew Munckton.
The Options will have an exercise price of $0.25 per share, a 4-year term (expiring 31 October 2027)
and are subject to a 3-year vesting period (vesting 31 October 2026). Further terms and conditions
of the Employee Options is set out in Appendix 1 of the Company’s ASX Announcement dated 19
October 2023.
Proposed 2024 Incentive Awards
During the Quarter, Talisman made offers in respect of 7,822,400 proposed new incentive options
to Directors and Staff (Incentive Options).
The Incentive Options will have an exercise price of $0.264 per share, will expire 4 years from issue,
are subject to a vesting period (3 years from grant) and are otherwise to be governed by the terms
of the Employee Securities Incentive Plan approved by Shareholders at the Company’s 2023 AGM
(ESIP).
4,981,700 of the Incentive Options are proposed to be issued under the ESIP to eligible participants
under Listing Rule 7.2 Exception 13. The remaining 2,840,700 Incentive Options are proposed to be
issued to Directors (and / or their nominees) and the issue will therefore be subject to shareholder
approval. The number of Incentive Options proposed to be issued to each Director are as follows:
Director
Number of Director Options
Andrew Munckton
1,618,500
Kerry Harmanis
425,100
Peter Benjamin
265,700
Brian Dawes
265,700
Jeremy Kirkwood
265,700
ASX Appendices 3B in respect of the proposed grants were lodged with the ASX on 11 December
2023.
5
Refer ASX announcement 15 April 2021 for Royalty details.
11
Cash Balance
At 31 December 2023, Talisman had $7.426 million cash and $0.475 million investment available
for its operating and investing activities.
Expenditure on mining exploration activities
In accordance with ASX Listing Rule 5.3.1, the Company advises its exploration and evaluation
expenditure during the December 2023 quarter totalled $2.464M. This amount is included at Item
1.2(a) of the Appendix 5B and relates to activities undertaken on the Company’s Lachlan Base
Metals and Mabel Creek Copper-Gold Projects. Expenditure during the quarter included RC drilling,
Diamond drilling, assaying, geophysical surveying, auger drilling, geological mapping activities,
tenement management, and exploration activity planning.
Payments to related parties of the entity and their associates
In accordance with Section 6.1 of the December 2023 quarter Appendix 5B, Talisman provides the
following in relation to payments made during the quarter to related parties:
Description
Directors Fees
$A’000
156
Explanation
Short term and post-employment benefits paid to non-executive
directors.
Ends
For further information, please contact:
Andrew Munckton – Managing Director
on +61 8 93804230
Nicholas Read (Media inquiries)
on +61 419 929 046
This release has been authorised by the Board of Talisman Mining Limited.
About Talisman Mining
Talisman Mining Limited (ASX:TLM) is an Australian mineral development and exploration company. The Company’s aim is to
maximise shareholder value through exploration, discovery and development of complementary opportunities in base and
precious metals.
Talisman has secured tenements in the Cobar/Mineral Hill region in Central NSW through the grant of its own Exploration Licenses
and through a joint venture agreement. The Cobar/Mineral Hill region is a richly mineralised district that hosts several base and
precious metal mines including the CSA, Tritton, and Hera/ Nymagee mines. This region contains highly prospective geology that
has produced many long-life, high-grade mineral discoveries. Talisman has identified a number of areas within its Lachlan Cu-Au
Project tenements that show evidence of base and precious metals endowment which have had very little modern systematic
exploration completed to date. Talisman believes there is significant potential for the discovery of substantial base metals and
gold mineralisation within this land package and is undertaking active exploration to test a number of these targets.
Competent Person’s Statement
Information in this announcement that relates to Exploration Results and Exploration Targets is based on, and fairly represents
information and supporting documentation complied by Dr Tim Sharp, who is a member of the Australasian Institute of
Geoscientists. Mr Sharp is a full-time employee of Talisman Mining Ltd and has sufficient experience which is relevant to the style
of mineralisation and types of deposits under consideration and to the activities undertaken to qualify as a Competent Person as
defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”.
Mr Sharp has reviewed the contents of this announcement and consents to the inclusion in this announcement of all technical
statements based on his information in the form and context in which they appear.
12
Forward-Looking Statements
This ASX release may include forward-looking statements. These forward-looking statements are not historical facts but rather
are based on Talisman Mining Ltd.’s current expectations, estimates and assumptions about the industry in which Talisman Mining
Ltd operates, and beliefs and assumptions regarding Talisman Mining Ltd.’s future performance. Words such as “anticipates”,
“expects”, “intends”, “plans”, “believes”, “seeks”, “estimates”, “potential” and similar expressions are intended to identify forwardlooking statements. Forward-looking statements are only predictions and are not guaranteed, and they are subject to known and
unknown risks, uncertainties and assumptions, some of which are outside the control of Talisman Mining Ltd. Past performance
is not necessarily a guide to future performance and no representation or warranty is made as to the likelihood of achievement or
reasonableness of any forward-looking statements or other forecast. Actual values, results or events may be materially different
to those expressed or implied in this presentation. Given these uncertainties, recipients are cautioned not to place reliance on
forward looking statements. Any forward looking statements in this announcement speak only at the date of issue of this
announcement. Subject to any continuing obligations under applicable law and the ASX Listing Rules, Talisman Mining Ltd does
not undertake any obligation to update or revise any information or any of the forward looking statements in this announcement
or any changes in events, conditions or circumstances on which any such forward looking statement is based.
13
Appendix 1
Talisman Tenement Holdings
Project /
Tenement
Location
and
Blocks
(Area)
CENTRAL
LACHLAN
PROJECT
New South Wales
Interest at
Beginning
of Quarter
Interest at
End of
Quarter
Acquired
during
Quarter
Surrendered
during
Quarter
Joint Venture
Partner
EL8615
(726km2)
100%
100%
-
-
EL8659
(373km2)
100%
100%
-
-
N/A
EL8677
(193km2)
100%
100%
-
EL8414
(174km2)
89%
89%
Peel Mining Ltd
(205km2)
100%
100%
-
-
EL8547
EL8571
(258km2)
100%
100%
-
-
EL8658
2
(256km )
100%
100%
-
-
EL8680
(20km2)
100%
100%
-
-
EL8719
(191km2)
100%
100%
-
-
EL9298
2
(440km )
100%
100%
-
-
EL9299
(199km2)
100%
100%
-
-
EL9302
(108km2)
100%
100%
-
-
EL9306
2
(327km )
100%
100%
-
-
EL9315
(103km2)
100%
100%
-
-
EL9379
(878km2)
100%
100%
-
-
EL9462
(8km2)
100%
100%
-
-
ELVIS
PROJECT
-
New South Wales
EL8977
(463km2)
100%
100%
-
-
EL9395
(75km2)
100%
100%
-
-
EL9396
2
100%
100%
-
-
HILLSTON
PROJECT
N/A
(229km )
N/A
New South Wales
EL8907
(372km2)
100%
100%
-
-
EL9394
2
100%
100%
-
-
N/A
100%
100%
-
-
N/A
51%
51%
-
-
Lucknow Gold Ltd
89%
89%
-
-
Peel Mining Ltd
DANDALOO
PROJECT
EL9324
LUCKNOW
PROJECT
EL6455
OTHER
EL8451
(399km )
New South Wales
(474km2)
New South Wales
(29km2)
New South Wales
(276km2)
14
Appendix 2
Lachlan Copper- Gold Project tenure
Appendix 3
15
Lucknow Gold Project tenure
16
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Talisman Mining Limited
ABN
Quarter ended (“current quarter”)
71 079 536 495
31 December 2023
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(6 months)
$A’000
-
-
(2,464)
(4,217)
(b) development
-
-
(c) production
-
-
(d) staff costs
(385)
(939)
(e) administration and corporate costs
(148)
(529)
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
(a) exploration & evaluation
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
65
145
1.5
Interest and other costs of finance paid
(1)
(2)
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
55
1.8
Other (Wonmunna Iron Ore Royalties)
2,186
3,794
1.9
Net cash from / (used in) operating
activities
(747)
(1,693)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
(9)
(19)
(d) exploration & evaluation
-
-
(e) investments
-
(500)
(f)
-
-
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Current quarter
$A’000
Year to date
(6 months)
$A’000
(a) entities
-
-
(b) tenements
-
9
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other - Tenement security deposit
(payments) / refunds
(114)
(88)
2.6
Net cash from / (used in) investing
activities
(123)
(598)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
-
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
-
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (ROU Lease Repayments)
(20)
(39)
03.1
0
Net cash from / (used in) financing
activities
(20)
(39)
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
8,316
9,756
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(747)
(1,693)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(123)
(598)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
(20)
(39)
Consolidated statement of cash flows
2.2
Proceeds from the disposal of:
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(6 months)
$A’000
-
-
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
7,426
7,426
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
2,786
3,676
5.2
Call deposits
4,640
4,640
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
7,426
8,316
6.
Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
156
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
$A’000
8.1
Net cash from / (used in) operating activities (item 1.9)
(747)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(747)
8.4
Cash and cash equivalents at quarter end (item 4.6)
7,426
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
7,426
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
9.94
-
-
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
....................15 January 2024...................................
Authorised by: ..............By the Board................................................
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly
Share your feedback