Updated Presentation Materials - Resources Rising Stars
Released
Released
Announcement PDF
ASX Code: TLM
talismanmining.com.au
Closing-in on breakthrough mineral discoveries
on Australia’s Eastern Seaboard
A well-funded explorer with a diversified portfolio in NSW and South Australia
The Talisman Investment Proposition
Well-funded, strong exploration DNA, highly leveraged to exploration success
Bourke
NSW Lachlan Orogen
•
•
•
•
Five projects covering ~6,200km2
World-class metal province
Major new phase of drilling underway
Significant zone of lead-zinc-silver
mineralisation intersected at Rip N Tear
Cobar
Dubbo
Mudgee
SA Gawler Craton
•
•
•
Bathurst
Mabel Creek IOCG Project
~1,000km2 in under-explored terrain
Close to major world-class mines
(Carrapateena, Olympic Dam)
HEAD OFFICE
Hillston Cu-Au Project
Wonmunna Iron Ore Royalty
•
•
•
•
Uncapped 1% gross revenue royalty
Operated by Mineral Resources (ASX: MIN)
Production commenced March 2021
$13.6m in receipts to date
Central Lachlan Cu-Au Project
Dandaloo Copper Project
Elvis Porphyry Cu-Au Project
Lucknow Gold Project
Our Purpose
To generate superior returns for our
shareholders through the exploration,
discovery, development and
commercialisation of high-value
mineral resource opportunities in base
and precious metals with Australia.
SAFETY
PEOPLE
ACCOUNTABILITY
The safety and well-being of
our people is at the forefront
of everything we do.
We aim to employ and
retain the best people
with the skills, belief
and commitment to add
value to our company
We take ownership for
ourselves and our work.
We think and act like
owners and will always
strive to “do the right thing”
for our business and our
stakeholders.
We will never compromise on
safety and we will always
stop work if it’s not safe to
continue.
INTEGRITY
INNOVATION
We act with honesty, fairness
and transparency and we are
sensitive to the environment
and communities in which we
operate.
We do what we say and we
treat all stakeholders with
dignity and respect.
We embrace innovation
and strive for continuous
improvement in
everything we do.
Corporate Overview
Capital Structure
Shareholder Ownership
Board and Management
187.7M
Shares on issue
HNW Investors
Harmanis Holdings
Retail
8M
Unlisted options (Exercise Prices: 20.1c – 31.0c)
Experienced Board and Management
A$28.1M
Market Capitalisation (Market Close 8 Nov 2023)
A$8.0M
Cash (30 September 2023)
Nil
A$20.1M
Debt
Kerry Harmanis
Andrew Munckton
Tim Sharp
Non-Executive Chairman
Managing Director
Exploration Manager
Peter Benjamin
Brian Dawes
Jeremy Kirkwood
Non-Executive Director
Non-Executive Director
Non-Executive Director
Enterprise value
Wonmunna – 1% Iron ore royalty stream - Fully Funds exploration
Wonmunna
■
Owned and operated by Mineral
Resources in Pilbara of WA
■
Part of MinRes Utah Point Hub. Ore mined
and trucked to Port Hedland for shipping
and sale
■
Wonmunna is the larger of the two mines
(Iron Valley is the smaller) that supply ore
for Utah Point Hub.
■
Utah Point FY23 production 9.8Mt
■
FY24 guidance 9.0Mt to 10.5Mt of Iron ore
Lump (15%) and Fines.
■
FY24 Ore Reserve 57Mt at 58% Fe
■
Talisman FY23 royalty payments $7.8M
Focused Australian Mineral Resources Company
5
NSW Lachlan Project
Extensive and highly prospective base metals and copper-gold tenure in a world-class district
Lachlan Base Metals and Copper-Gold Project
Extensive, high-quality portfolio in a world-class minerals district
• Highly prospective ~6,200km2 exploration portfolio in the Lachlan Fold Belt, NSW
• World-class mineral field, hosting numerous Tier-1 deposits:
•
Cadia, Cowal, North Parkes porphyry copper-gold
•
Cobar Basin VMS-style lead-zinc-silver-copper
•
Vein-style high-grade gold-silver
• Recent significant discoveries and mine developments:
•
Boda copper-gold, Tomingley gold, Hera/Federation copper-lead-zinc-silver
• Talisman tenure spans significant controlling structures:
•
Areas under cover have not been well explored
•
All significant deposits are structurally controlled
• Exploration targeting refined based on geophysics and structural geology
• Large-scale lead-silver-zinc system intersected at Rip N Tear
Lachlan Project NSW – Focused, Systematic, Cost-effective Exploration
■
Completed two regional scale airborne geophysical surveys in
2022:
➢
➢
Falcon® Airborne Gravity Gradiometry (AGG) survey – ~15,500
kms @ 200m spacing
VTEM™ Max Airborne Electromagnetic (AEM) survey - ~6,300
kms @ 200m spacing
■
Interpretation of regional airborne geophysical surveys
identified over 50 conductivity and gravity anomalies
■
12 of these geophysical targets identified as drill ready and
shortlisted for testing
■
15 Prospects identified as requiring ground geophysics - movingloop electromagnetic (MLEM) and Pole-Dipole Induced
Polarisation (PDIP)
■
4 Prospects being drill tested in December 2023 half
Focused Australian Mineral Resources Company
8
Lachlan Project NSW – Rip n Tear PROSPECT
Stage 1 – Initial Drill Test
■
Rip N Tear Prospect associated with strong base
metals soil geochemistry (Pb)
■
Canbelego Mineral Hill Fault
■
2 Large MLEM anomaly 3km and 2km strike
■
Previous results
■
■
■
1970s RC drilling to ~200 ft (61m)
■
Anomalous Cu and malachite staining
■
Pb/Ag rich gossans at surface
1650m RC drill tested in 7 RC holes
■
MYRC0002 - 192m at 1.3% Pb and 10g/t Ag
■
MYRC0003 - 84m at 1.5% Pb and 15g/t Ag
MYRC0004-MYRC0007 Assays pending
Focused Australian Mineral Resources Company
9
Lachlan Project NSW – Rip n Tear PROSPECT
Stage 1 – Initial Drill Test
■
Rip N Tear Prospect associated with strong base
metals soil geochemistry (Pb)
■
Canbelego Mineral Hill Volcanic belt
■
Northern MLEM anomaly – 3km strike length
■
1650m RC drill testing 7 holes
■
MYRC0002 192m at 1.3% Pb and 10g/t Ag
■
MYRC0003 84m at 1.5% Pb and 15g/t Ag
■
MYRC0004-MYRC0007 Assays pending
■
Diamond drilling to extend 6 holes – November
■
RC rig returns in November to add additional 3
RC holes to test continuity of Northern MLEM
anomaly
■
Further MLEM surveys planned to test for other
large chargeable targets
Focused Australian Mineral Resources Company
10
Lachlan Project NSW – Noisy Ned PROSPECT
Stage 2 – Initial Drill Test
■
Noisy Ned Prospect associated with strong base
metals soil geochemistry
■
Canbelego Mineral Hill Volcanic belt
■
Two Large Gravity Lows – 10km x 5km implying
substantial intrusion underlies area
■
Detailed ground gravity shows complex internal
and reactivated structure
■
Large chargeable feature at depth – never tested
■
Previous results
■
■
112m at 0.16% Zn from surface
■
21m at 0.33% Cu from 22m
Targets at 150m to 300m downhole
Focused Australian Mineral Resources Company
11
Lachlan Project NSW – Noisy Ned PROSPECT
Stage 2 – Initial Drill Test
■
Noisy Ned Prospect associated with strong base
metals soil geochemistry
■
Canbelego Mineral Hill Volcanic belt
■
Detailed gravity shows complex internal and
reactivated structure between regional gravity lows
■
NW-SE oriented “bridge” intruded by porphyry
providing further smaller scale gravity targets
■
Chargeable feature at depth – tested by NNRC0019
■
1500m, 5 RC hole drill testing complete. Assays
pending for NNRC0018-NNRC0022
■
Other Prospects Carpina North and Durnings to
follow pending results from Rip n Tear and Noisy
Ned follow up
Focused Australian Mineral Resources Company
12
Mabel Creek Project SA – Exposure to Tier-1 deposit discovery potential
Mabel Creek IOCG- Rare Earths Project
■
Project acquisition completion – 1,048km2. West of
Coober Pedy in Gawler Craton
■
Project tenements surrounded by tenure held by major
mineral companies – BHP/OZ, RIO, FMG
■
Regional presence of majors highlights the exploration
opportunity for additional significant copper-gold
discoveries in the Gawler Craton
■
Known copper-gold bearing IOCG deposits and
exploration ground held by majors located along an
arcuate “Prospective IOCG Corridor”
■
Negotiating Native Title Land Access Agreement
■
On-ground activities (geophysics and drilling) late 2023
or early 2024
Focused Australian Mineral Resources Company
13
Mabel Creek Project SA – Exposure to Tier-1 deposit discovery potential
Mabel Creek IOCG – Rare Earths Project
■
3 continuous Exploration Licences
■
Tenure spans a major deep-seated east-west trending
fault system – host to intrusive lithologies including
Hiltaba Granite Suite
■
Recent detailed aeromagnetic data from the GSSA
■
Coincident gravity-magnetic anomalies on major faults
■
Post-mineral cover across tenure relatively shallow (30m
to 150m) compared to other areas of the Gawler Craton
■
Previous explorers - Mammoth, Teck, Vale
■
No on-ground exploration activities in the area since 2014
■
Detailed gravity data being acquired, TO engagement for
on-ground activities
■
Plan to be drill testing late 2023/ early 2024
Focused Australian Mineral Resources Company
14
Key investment takeaways
Highly leveraged to discovery success
All the right ingredients
✓Highly prospective tenure across multiple projects in a
Tier-1 jurisdiction
✓Multiple commodity exposure
✓Systematic and methodical exploration approach
✓Active on-ground exploration programs and pipeline of
planned exploration
✓Reliable funding – ongoing royalty revenue stream +
strong cash balance
✓Focused and experienced team
✓Substantial IOCG exploration opportunity in Gawler
Craton – South Australia
talismanmining.com.au
Thank You
For further information please contact:
Mr Andrew Munckton
Managing Director
Mr Tim Sharp
Exploration Manager
Telephone: +61 8 9380 4230
Email:
info@talismanmining.com.au
Website: talismanmining.com.au
Focused Australian Mineral Resources Company
16
Appendix 1: Competent Persons’ Statements
Exploration Results and Exploration Targets
Information in this presentation that relates to Exploration Results an Exploration Targets is based on, and fairly represents information and supporting
documentation complied by Mr Alex Mangl, who is a member of the Australasian Institute of Geoscientists. Mr Mangl is a full-time employee of Talisman
Mining Ltd and has sufficient experience which is relevant to the style of mineralisation and types of deposits under consideration and to the activities
undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves”. Mr Mangl has reviewed the contents of this presentation and consents to the inclusion in this presentation of all technical statements
based on his information in the form and context in which they appear.
No new information that is considered material is included in this document. All information relating to exploration results has been previously released to
the market and is appropriately referenced in this document. JORC tables are not considered necessary to accompany this document.
References:
1 Refer ASX Announcement dated 30 January 20223 for full details of tenement acquisition.
2 Refer ASX Announcements dated 17 February 2011, 30 October 2020, 15 April 2021, 30 July 2021,
and 18 October 2021 for full details of the Wonmunna Iron Ore Royalty.
3 Refer ASX Announcements dated 17 January 2022, 30 March 2022, 26 July 2022 and 5 September 2022 for full details.
4 Refer ASX Announcement dated 16 November 2022 for full details.
5 Refer ASX Announcement dated
24 January 2023 for full details.
6 Refer ASX Announcement dated
8 May 2023 for full details.
7 Refer ASX Announcement dated 26 July 2022 for full details.
8 Refer ASX Announcement dated 15 May 2023 for full details.
Focused Australian Mineral Resources Company
17
Share your feedback
Discover