Building momentum with the drill rig
Closing-in on the next significant discovery in the Lachlan Fold Belt, NSW
Resources Rising Stars Gold Coast Conference - May 2023
Focused Australian Mineral Resources Company
Disclaimer
This presentation has been prepared by Talisman Mining Limited.
This document contains background information about Talisman Mining Ltd current at the date of this presentation. The presentation is in summary form, has not been independently
verified and does not purport be all inclusive or complete nor does it contain all the information that a prospective investor may require in evaluating a possible investment in Talisman
Mining Ltd or its assets.
Recipients should conduct their own investigations and perform their own analysis in order to satisfy themselves as to the accuracy and completeness of the information, statements and
opinions contained in this presentation.
This presentation is for information purposes only. Neither this presentation nor the information contained in it constitutes an offer, invitation, solicitation or recommendation in relation
to the purchase or sale of securities in any jurisdiction. This document is not a prospectus and does not contain all of the information which would be required to be disclosed in a
prospectus. This presentation may not be distributed in any jurisdiction except in accordance with the legal requirements applicable in such jurisdiction. Recipients should inform
themselves of the restrictions that apply in their own jurisdiction. A failure to do so may result in a violation of securities laws in such jurisdiction.
This presentation does not constitute investment advice and has been prepared without taking into account the recipient's investment objectives, financial circumstances or particular
needs and the opinions and recommendations in this presentation are not intended to represent recommendations of particular investments to particular persons. Recipients should
seek their own professional, legal, tax, business and/or financial advice when deciding if an investment is appropriate. All securities transactions involve risks, which include (among
others) the risk of adverse or unanticipated market, financial or political developments. To the fullest extent permitted by law, Talisman Mining Ltd and its related bodies corporate, its
directors, officers, employees and representatives (including its agents and advisers), disclaim all liability and take no responsibility for any part of this presentation, or for any errors in or
omissions from this presentation arising out of negligence or otherwise and do not make any representation or warranty, express or implied, as to the currency, accuracy, reliability or
completeness of any information, statements, opinions, estimates, forecasts, conclusions or other representations contained in this presentation. This presentation may include forwardlooking statements. These forward-looking statements are not historical facts but rather are based on Talisman Mining Ltd.'s current expectations, estimates and assumptions about the
industry in which Talisman Mining Ltd operates, and beliefs and assumptions regarding Talisman Mining Ltd.'s future performance. Words such as “anticipates”, “expects”, “intends”,
“plans”, “believes”, “seeks”, “estimates”, “potential” and similar expressions are intended to identify forward-looking statements. Forward-looking statements are only predictions and
are not guaranteed, and they are subject to known and unknown risks, uncertainties and assumptions, some of which are outside the control of Talisman Mining Ltd. Past performance is
not necessarily a guide to future performance and no representation or warranty is made as to the likelihood of achievement or reasonableness of any forward-looking statements or
other forecast. Actual values, results or events may be materially different to those expressed or implied in this presentation. Given these uncertainties, recipients are cautioned not to
place reliance on forward looking statements. Any forward looking statements in this presentation speak only at the date of issue of this presentation. Subject to any continuing
obligations under applicable law and the ASX Listing Rules, Talisman Mining Ltd does not undertake any obligation to update or revise any information or any of the forward looking
statements in this presentation or any changes in events, conditions or circumstances on which any such forward looking statement is based.
Focused Australian Mineral Resources Company
2
Talisman Profile – Highly leveraged to exploration success
■
Highly prospective gold and base metal exploration portfolio:
➢
Central Lachlan
Cu-Au Project
Dandaloo
Copper Project
NSW Lachlan Orogen:
Five projects covering ~6,200km2 in known mineralized areas
■ Multiple commodity opportunities
■
➢
SA Gawler Craton# 1:
Mabel Creek IOCG project covering ~1,000km2 in underexplored terrain
■ Proximal to operating world class mines - Tier-1 discovery potential
■
■
Unique advantage in junior exploration space - income stream
➢
Hillston Cu-Au
Project
Elvis Porphyry
Cu-Au Project
Lucknow Gold
Project
Wonmunna Iron Ore Royalty 2:
Uncapped 1% gross revenue royalty
■ Iron ore production commenced March 2021
■ $13.6M in royalty receipts received to date
■
■
Multiple field programs in progress and well funded (cash ~$9.7M*)
■
Experienced Board and Management with ownership (~20%)
■
Actively pursuing new Australian growth opportunities
# Subject to acquisition completion
* As at 31 March 2023
Focused Australian Mineral Resources Company
3
Corporate Overview
Experienced Board and Management
Capital Structure
Kerry Harmanis
- Non-Exec Chairman
Shares on Issue
Shaun Vokes
Russ Gregory
- Chief Executive Officer
- Exploration Manager
Unlisted Options (Exercise Prices: 20.1c – 31.0c)
12.7M
Peter Benjamin
- Non-Exec Director
Market Capitalisation (Market Close 12-May-2023)
A$32M
Brian Dawes
- Non-Exec Director
Cash (31-Mar-2023)
A$10M
Jeremy Kirkwood
- Non-Exec Director
Debt
187.7M
Nil
Enterprise Value
A$22M
Shareholding (12 May 2023)
Substantial Holders - Kerry Harmanis
~19%
Top 20 holders
~35%
Share Price Performance since Jun-22
Focused Australian Mineral Resources Company
4
Pathway to Discovery: Our Exploration methodology
STAGED EXPLORATION PIPELINE
FOCUSED, SYSTEMATIC, COST-EFFECTIVE EXPLORATION
FEEDBACK
Learnings from drilling results help to
constrain next targeting.
IDENTIFY
4
1
Conceptual targets and prospect
areas identified from regional
geophysics or geochemistry
RESOURCE
Resource definition program
proving economic size and grade.
TEST
3
2
Advance most prospective targets to
drill testing. Mineralization followed up
immediately.
Focused Australian Mineral Resources Company
DEFINE
Drill targets defined and ranked
using detailed geochemistry and
targeted geophysics
5
NSW Lachlan Project
Extensive and highly prospective gold and base
metals tenure
RC Drilling at the Bonzer VTEM anomaly, EL8680
Focused Australian Mineral Resources Company
6
Lachlan Project NSW – Proven mineralised area with significant metal endowment
Regional geological interpretation ■
Mature mineral field, but bias of known regional mineralisation
is to areas of residual exposure – implies that areas under
cover have not been well explored to date
■
Mineralisation is structurally controlled and structure below
cover is poorly understood
■
All significant deposits have a gravity anomaly related to
structure or alteration (usually identified post-discovery)
■
Airborne electro-magnetic (AEM) surveys are a proven
discovery tool with a history of significant recent success
■
Need to narrow the search space to identify robust exploration
targets
Cenozoic cover
So, from an Exploration Methodology point of view, how
have we progressed?
Focused Australian Mineral Resources Company
7
Lachlan Project NSW – Focused, Systematic, Cost-effective Exploration
Stage 1 - Identification
■
Developed a regional metallogenic framework and identified
regional scale metallogenic corridors
■
Identified applicable mineral system models to drive mineral
potential mapping
■
Undertaken large scale geological mapping and regolith
geochemistry progams
■
Aim is to identify anomalies related to Cu-Au-Pb-Zn-Ag systems
■
Initial focus on the Central Lachlan Cu-Au Project
■
Completed two regional scale airborne geophysical surveys in
the first half of 2022 3 :
➢
Falcon® Airborne Gravity Gradiometry (AGG) survey – ~15,500
line kms @ 200m spacing
➢
Targeted VTEM™ Max Airborne Electromagnetic (AEM) survey ~6,300 line kms @ 200m spacing
Focused Australian Mineral Resources Company
8
Lachlan Project NSW – Focused, Systematic, Cost-effective Exploration
Stage 2 - Definition
Rip & Tear Prospect
Stella & Carpina
North Prospects
■
Interpretation of regional airborne geophysical surveys
identified over 50 conductivity and gravity anomalies for
follow-up 4
■
12 of these geophysical targets identified as drill ready and
prioritised for drill testing 5
■
15 target areas identified as requiring additional ground
geophysics - moving-loop electromagnetic (MLEM) and PoleDipole Induced Polarisation (PDIP)
■
23 target areas identified as requiring additional geochemistry
(utilising Talisman’s own auger rig)
■
Portable PPB technology purchased – allows low level gold
detection from auger drilling samples within 8 hours using
portable XRF analysis
➢
Permits rapid, field based, adaptive sampling where follow-up
programs can be undertaken in days rather than months
Durnings Prospect
Focused Australian Mineral Resources Company
9
Lachlan Project NSW – Focused, Systematic, Cost-effective Exploration
Stage 2 – Geophysics Generating Positive Results
■
Two discrete priority chargeable anomalies from
Induced Polarisation (IP) surveys identified at the
Stella Prospect (EL8571) 6
■
Stella Prospect associated with historic high-grade
copper workings
■
High chargeability values (up to 23 mV/V)
compared with chargeability values of ~10-15
mV/V common at drill targets throughout the
Cobar Basin
■
Additionally, two conductive plate models and a
chargeable anomaly identified at the Rip & Tear
Prospect (EL8615)
■
Drill testing of Stella Prospect planned for Q2 2023
and Rip and Tear Prospect in Q3 2023
Focused Australian Mineral Resources Company
10
Lachlan Project NSW – Focused, Systematic, Cost-effective Exploration
Stage 3 – Drill Testing
■
4,175m over 7 targets still to be drilled
Program to be extended to include additional RC drilling at
✔
■
✔
➢
■
Rip & Tear Prospect
Drilling completed
6,754m over 8 targets drilled
~3,182 samples submitted for multi-element analysis – 77% of
assays returned to date
✔
Stella & Carpina
North Prospects
➢
■
✔
✔
~11,000m RC drilling program testing priority geophysical
targets commenced in late January 20235. To date:
➢
Stella and Rip and Tear Prospects
➢
Carpina North Gold Prospect
➢
Previous drilling intersected extensive low grade gold system
➢
CNRC0012 – 40m @ 0.51g/t Au from 24m downhole including 14m @
0.85g/t Au from 44m downhole 7
Diamond drilling program to commence in June 2023 at Elaine
Copper Prospect
✔
✔
Durnings Prospect
Focused Australian Mineral Resources Company
11
Lachlan Project NSW – Focused, Systematic, Cost-effective Exploration
Stage 3 – Drilling Generating Positive Results
Durnings (EL8680)
▪
➢
Polymetallic opportunity along strike from Mineral Hill Mine
– recent intersection of Au-Cu-Zn-Pb-Ag mineralization 8
➢
Base and precious metal mineralisation seen to the end-ofhole, suggesting mineralisation continues at depth
➢
Encouraging base and precious metal intersections were also
seen in extensional holes drilled to the north-east
➢
DRRC0001
8m @ 6.3 g/t Au, 0.77% Cu, 0.27% Pb, 0.36% Zn & 6.3g/t Ag from 82m,
including 2m @ 17.5g/t Au, 1.4% Cu, 0.32% Pb, 0.36% Zn and 12.8g/t Ag
from 88m 8
Focused Australian Mineral Resources Company
12
Lachlan Project NSW – Focused, Systematic, Cost-effective Exploration
Stage 3 – Drilling Generating Positive Results
Durnings (EL8680)
▪
➢
Recent results suggests that the high-grade intercept forms
part of a much larger mineralising system being the Kaolin
Shaft – Durnings trend
➢
Further mineralization has been encountered stepping out
under shallow cover from historically explored outcropping
areas
➢
KSRRC0013
8m @ 0.75g/t Au and 8.5g/t Ag from 52m 8
➢
Follow-up drilling currently being planned
Focused Australian Mineral Resources Company
13
Mabel Creek Project SA – Exposure to Tier-1 deposit discovery potential
Mabel Creek IOCG Project
■
3 continuous Exploration Licences covering an area of
1,048km2 west of Coober Pedy
■
Area initially identified as part of the South Australian
Government’s “Gawler Challenge” in 2020
■
Highly prospective for IOCG and Gawler Craton-style
gold mineralisation
■
No on-ground exploration activities in the area since
2014
Focused Australian Mineral Resources Company
14
Mabel Creek Project SA – Exposure to Tier-1 deposit discovery potential
Mabel Creek IOCG Project
■
Tenure spans a major deep-seated east-west trending
fault system – potentially host to intrusive lithologies
including Hiltaba Granite Suite
■
Recent aeromagnetic data from the GSSA highlights
demagnetised areas – suggestive of extensive alteration
associated with the fault system
■
Post-mineral cover across tenure relatively shallow (30m
to 150m) compared to other areas of the Gawler Craton
Focused Australian Mineral Resources Company
15
Mabel Creek Project SA – Exposure to Tier-1 deposit discovery potential
Mabel Creek IOCG Project
■
Project tenements surrounded by tenure held by major
mineral companies – BHP/OZ, RIO, FMG
■
Regional presence of majors highlights the exploration
opportunity for additional significant copper-gold
discoveries in the Gawler Craton
■
Known copper-gold bearing IOCG deposits and
exploration ground held by majors located along an
arcuate “Prospective IOCG Corridor”
■
Project acquisition completion forecast for late Q2 2023
■
Negotiate Native Title Land Access Agreement
■
On-ground activities (geophysics and diamond drilling)
late 2023 or early 2024
Focused Australian Mineral Resources Company
16
Exploration Work Programs – Systematic exploration of new & existing targets
■
■
■
Concurrent workstreams in progress across our NSW Lachlan Project for the remainder of 2023 and into 2024
Initial generative work programs across several new targets ongoing with the aim of delivering drill ready anomalies
Maiden work programs at the Mabel Creek Project in SA planned for late 2023/early 2024
Focused Australian Mineral Resources Company
17
Talisman – Creating the next multi billion-dollar minerals business
All the right ingredients:
✔
Substantial highly prospective tenure across multiple projects in a Tier 1 jurisdiction
✔
Multiple commodity exposure
✔
Systematic and methodical exploration approach
✔
Multiple active on-ground exploration programs and an extensive pipeline of
planned exploration activity
✔
Well Funded - ongoing royalty revenue stream + strong cash balance
✔
Focused and experienced team
✔
Actively reviewing additional growth opportunities in base and precious metals
Focused Australian Mineral Resources Company
18
talismanmining.com.au
Thank You
For further information please contact:
Mr Shaun Vokes
CEO
Mr Russ Gregory
Exploration Manager
Telephone: +61 8 9380 4230
Email:
info@talismanmining.com.au
Website: talismanmining.com.au
Resources Rising Stars Gold Coast Conference
May 2023
Focused Australian Mineral Resources Company
19
Appendix 1: Competent Persons’ Statements
Exploration Results and Exploration Targets
Information in this presentation that relates to Exploration Results an Exploration Targets is based on, and fairly represents information and supporting
documentation complied by Mr Russ Gregory, who is a member of the Australasian Institute of Geoscientists. Mr Gregory is a full-time employee of Talisman
Mining Ltd and has sufficient experience which is relevant to the style of mineralisation and types of deposits under consideration and to the activities
undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves”. Mr Gregory has reviewed the contents of this presentation and consents to the inclusion in this presentation of all technical statements
based on his information in the form and context in which they appear.
No new information that is considered material is included in this document. All information relating to exploration results has been previously released to
the market and is appropriately referenced in this document. JORC tables are not considered necessary to accompany this document.
References:
1 Refer ASX Announcement dated 30 January 20223 for full details of tenement acquisition.
2 Refer ASX Announcements dated 17 February 2011, 30 October 2020, 15 April 2021, 30 July 2021,
and 18 October 2021 for full details of the Wonmunna Iron Ore Royalty.
3 Refer ASX Announcements dated 17 January 2022, 30 March 2022, 26 July 2022 and 5 September 2022 for full details.
4 Refer ASX Announcement dated 16 November 2022 for full details.
5 Refer ASX Announcement dated
24 January 2023 for full details.
6 Refer ASX Announcement dated
8 May 2023 for full details.
7 Refer ASX Announcement dated 26 July 2022 for full details.
8 Refer ASX Announcement dated 15 May 2023 for full details.
Focused Australian Mineral Resources Company