More Wide Lead-Silver Intercepts at Rip n Tear
Released
Released
Announcement PDF
26 February 2024
More Wide Lead-Silver Intercepts at Rip n Tear as
Scale of Mineralised System Continues to Grow
Phase 1 diamond drilling near complete; Drilling to resume at Durnings
Highlights:
•
Assay results received from additional extensional diamond (DD) drill-holes completed recently
on EL8615 at the Rip n Tear Prospect, part of the 100%-owned Lachlan Project in NSW.
•
The diamond extension to MYRCD0002 was designed to test for depth extensions and
continuity of mineralisation from previous broad RC drill intercepts which terminated in
mineralisation at the northern MLEM anomaly. Diamond drilling wedged from 177.9m down the
original 232m deep RC hole. Results include:
MYRCD0002 (see ASX: TLM, 20 October 2023)
o
RC – 192m at 1.3% Pb, 10.1g/t Ag, 0.06% Zn from 40m to 232m end-of-hole
o
DD wedge – 70.1m at 1.3% Pb, 12.g/t Ag, from 177.9m to 248.0m and
- 24m at 0.8% Pb, 9.9g/t Ag, 0.01% Zn from 270.6m to 294.6m
o
•
Combined RC+DD wedge
§
208m at 1.2% Pb, 8.9/t Ag, 0.06% Zn from 40m to 248m; and
§
24m at 0.8% Pb, 9.9g/t Ag, 0.01% Zn from 270.6m to 294.6m
The diamond extension to MYRCD0004 was designed to test for depth extensions and
continuity of mineralisation from previous narrow RC intersections within the target horizon and
confirm geological continuity of mineralisation at the Southern MLEM anomaly. Diamond drilling
extended from the end of the original RC hole at 234m. Results include:
MYRCD0004 (see ASX: TLM, 6 December 2023)
o
RC – 18m at 0.28% Pb, 5.2g/t Ag, 0.01% Zn from 142m to 160m
o
DD wedge – 59.2m at 0.8% Pb, 1.5g/t Ag, 0.05% Zn from 255m to 314.2m
•
Extensional diamond drilling has also been completed at MYDD0012, located close to
MYRCD0002 and MYDD0013 at the eastern extension of the MLEM survey anomaly,
approximately 800m east of MYRCD0003. These holes were designed to target further
extensions of the prospective mineralised horizon. Assays are awaited.
•
The latest results have confirmed the depth extension and continuity of lead-silver-zinc
mineralisation at Rip n Tear over a strike length of more than 1.6km and down-hole widths of up
to 200m, highlighting the substantial scale of the mineralised system.
•
The diamond rig will move to complete extensional drilling on RC holes at the Durnings
discovery.
1
Talisman Mining Limited (ASX: TLM, Talisman) is pleased to advise that it has received further
significant assay results from diamond holes drilled in early 2024 targeting depth extensions of
previous broad zones of lead-silver mineralisation intersected in the initial Reverse Circulation (RC)
drilling at the Rip n Tear Prospect, part of its 100%-owned Lachlan Project in central NSW.
Rip n Tear is located approximately 35km north of Condobolin on EL8615. It lies approximately 20km
north-west of the Company’s Durnings discovery, both of which were tested as part of a 7,200m RC
drilling campaign completed in late 2023 across four priority prospects within the Lachlan Project
area (see Figure 1).
Assays have now been received for holes MYRCD0002 and MYRCD0004, diamond drill-hole
extensions of the discovery holes MYRC0002 and MYRC0004 completed in December.
Figure 1 – Lachlan Project location plan highlighting prospect locations along the Canbelego-Mineral Hill Volcanic Belt.
2
Background
The Rip N Tear prospect is an under-explored target on EL8615 defined by strongly anomalous base
metal soil geochemistry containing two large, coherent conductive MLEM anomalies (ASX: TLM, 8 May
2023).
The prospect is situated within a complex structural setting associated with NNE and NE trending
faults which are interpreted to provide a pathway for mineralised fluids from local granite intrusions.
Historic drilling was limited to three percussion holes (~61m deep, drilled in 1970’s). The initial
Talisman program consisted of seven RC holes designed to test two conductive anomalies at depth
at approximately 800m to 1,000m drill-hole spacing.
Results from the initial RC drilling (Table 3) (ASX: TLM, 20 October and 6 December, 2023). include:
•
MYRC0002 – 192m at 1.32% Pb, 10.1g/t Ag, 0.06% Zn from 40m to 232m end-of-hole;
•
MYRC0003 – 80m at 1.56% Pb, 14.7g/t Ag, 0.11% Zn from 188m to 268m end-of-hole;
•
MYRC0004 – 18m at 0.28% Pb, 5.2g/t Ag and 0.01% Zn from 142m to 160m;
•
MYRC0005 – 6m at 0.81% Pb and 5.6g/t Ag from 44m to 50m;
•
MYRC0006 – 10m at 0.85% Pb, 3.3g/t Ag and 0.02% Zn from 246m to 256m; and
•
MYRC0007 – 10m at 0.81% Pb, 12.4g/t Ag and 0.04% Zn from 222m to 232m.
RC drilling of a further four holes (MYRC008-MYRC0011) for 688m was completed in early
December targeting strike extensions of MYRC0002 and MYRC0003, guided by the extensive
MLEM anomaly (see Figure 2).
Drilled at approximately 500m spacing, these RC holes were designed to target a buried lead-silver
and sulphide-rich sedimentary unit which appears to host the mineralisation.
RC drilling has intersected broad zones of disseminated galena and silver with accessory sphalerite
with strong sulphide mineralisation in sericite and ankerite/siderite altered sedimentary rocks in the
target position.
As with the previous drilling program, RC drill penetration and sample quality has been reduced by
high water inflows at depth and therefore several of the RC holes were suspended in mineralisation
or above the targeted mineralised position.
Diamond drill tails were completed in December 2023 on RC holes (MYRC0002 and MYRC0003) in
the north and (MYRC0004) in the south of Rip n Tear. All holes intersected further significant zones
of sulphide mineralisation.
Assay results for the recent extensional diamond drilling are summarised in Table 3, detailed in Table
4 and Table 5. Significant results are illustrated in Figure 2 and include:
3
Northern Anomaly
MYRCD0002
o
o
Diamond wedge
§
70.1m at 1.31% Pb, 12.0g/t Ag, 0.01% Zn from 177.9m to 248m; and
§
24m at 0.80% Pb, 9.9g/t Ag, 0.01% Zn from 270.6m to 294.6m
Combining the parent RC hole with the diamond wedge results in:
§
208.0m at 1.2% Pb, 8.9g/t Ag, 0.06% Zn from 40m to 248m; and
§
24m at 0.80% Pb, 9.9g/t Ag, 0.01% Zn from 270.6m to 294.6m
MYRCDD0003 ((ASX: TLM, 30 January 2023)
o
o
Diamond Tail
§
41m at 0.3% Pb, 10.4g/t Ag, 0.02% Zn from 272m to 313m, including
§
21m at 0.5% Pb, 11.5g/t Ag, 0.02% Zn from 272m to 293m
Combining the parent RC hole with the diamond tail results in:
§
105.0m at 1.3% Pb, 13.5g/t Ag, 0.09% Zn from 188m to 293m.
Southern Anomaly
MYRCD0004
o
59.2m at 0.77% Pb, 1.5g/t Ag, 0.05% Zn from 255m to 314.2m
4
Figure 2 – Rip n Tear RC and diamond drilling results over MLEM Geophysical survey image. True width in MYRCDD002 and
MYCRDD003 is approximately 40% to 50% of downhole intersection. True with of MYRCDD0004 is approximately 80% of downhole
intersection.
Geology and Mineralisation
The Rip n Tear Prospect is located within EL8615 on the eastern edge of the Canbelego-Mineral Hill
Rift Zone (Figure 1), adjacent to a large, controlling, basin margin, NW-SE oriented structure.
Devonian-age sediments of the Ewolong Formation (sandstone and conglomerate) and Gwando
Siltstone host the prospect. To the west lies the older Ordovician-age Girilambone Group, which is
intruded by the early Devonian-age Yellow Mountain Granite.
The granite intrusion(s) are interpreted to be the source of heat, fluid and metal for several other
lead-silver-zinc and copper-gold deposits and mineralised prospects along the Mineral Hill Rift. Rip
N Tear is cut by two NW-SE trending faults interpreted to be transverse faults in a rift setting.
Anomalous lead-in-soil geochemistry results, and the coincident MLEM response illustrated in
Figures 2, highlight the proximity of the faults to the surface expression of the mineralisation.
5
The target horizon consists of broad zones of disseminated and blebby sulphides (galena, pyrite and
rare sphalerite) associated with sericite and ankerite/siderite alteration hosted in sandstone, siltstone
and coarse angular quartz breccia/conglomerate. Narrow veins of quartz and galena have also been
observed below the thick sedimentary horizon.
MYRCDD0002 and MYRCDD0003 are interpreted as being drilled at a moderate angle to the
mineralised zones. True width of mineralised zones in these holes are estimated at approximately
40% to 50% of downhole widths. MYDD0012 intersected Girilambone sediments close to surface
faulted against mineralised Devonian sediments at depth. A fault zone has been interpreted between
the collar positions of MYRCDD0012 and MYRCDD0002. (See Cross Section Figure 3).
Rip n Tear – Next Steps
The diamond rig has completed hole MYDD0012 (assays pending) located close by MYRC0002 to
gather structural and stratigraphic information on the widest part of the mineralised zone.
A strong MLEM anomaly extension defined a further 800m east of MYRCDD0003 (our easternmost
hole to date) has also been tested with diamond hole MYDD0013 (assays pending) to establish if
the mineralisation defined to date continues to the east (see Figure 2).
With assays confirming a wider than logged mineralised zone in MYRCDD0004 further sampling of
diamond core will be undertaken on this hole to further define the extent and grade of the mineralised
zones (Table 4).
The diamond drill rig will re-locate to Durnings in the next week to undertake RC hole extension
drilling over previously drilled RC holes at that location.
Figure 3 – Rip n Tear – Interpreted section (oblique to the interpreted dip and strike) of the Rip n Tear northern MLEM anomaly
deposit. True width of mineralisation in MYRCDD0002 is approximately 40% to 50% of downhole intersection.
6
Durnings – Exploration Update
Once diamond drilling is complete at Rip n Tear, the rig will mobilise to Durnings to complete
diamond drilling tails from three previous RC holes (DRRC0006, DRRC008 and DRRC0010) which
terminated in mineralisation. The diamond tails program has been designed to test depth extensions
of the mineralised zones. (ASX: TLM 14 December 2023 and 9 January 2024).
In addition, follow-up RC drilling will commence in early March, above and immediately along strike
from the discovery hole DRRD0006. This step-out RC drilling is designed to provide information on
the extent, dip and strike of the high-grade core of the mineralisation.
Currently, an auger drilling and soil geochemistry program is underway over the Eastern GAIP Target
at Durnings. The program is expected to take approximately three weeks to complete and will guide
the initial RC drilling of this large and previously undrilled target during the June Quarter (see Figure
4).
Figure 4 – Durnings – RC drill hole locations and Eastern GAIP target over GAIP Geophysical survey image on EL8680.
7
Management Comment
Talisman’s Managing Director, Andrew Munckton, said: “We are very encouraged to see more
significant assay results being returned from extensional diamond drilling at the Rip n Tear discovery.
“These new results demonstrate the continuity of the lead-silver mineralised horizon, hosted in a
folded and faulted sequence of sediments, in drilling over a strike extent of more than 1.6km and
downhole widths up to 200m. This clearly demonstrates the significant scale of the mineralised
system.
“The current diamond drilling program is nearing completion with results awaited for several holes
aimed at indicating the extent of the mineralisation with diamond tails from RC holes MYRC0008
and MYRC0009 and surface diamond holes MYDD0012 and MYDD0013. If confirmed, this will
further extend the mineralisation to a strike length of 2.3km and provide an overall picture of the
scale of the opportunity at Rip n Tear.
“Importantly, the diamond drilling and multi-element assaying at Rip n Tear provides detailed
geological context to the mineralisation – which appears extensive, consistent and detectable with
geophysics.
“While it is still very early in the exploration phase, the Rip n Tear project so far appears to have all
the indicators of an extensive mineralised system in a sedimentary basin setting.
“Meanwhile at Durnings, our focus remains on targeting mineralized extensions from the discovery
hole at this target, DRRC0006, which identified a sulphide-rich, 6m intersection from 274m downhole, which returned a high-grade assay result of 10.3% Pb, 3.5% Zn 126g/t Ag, 0.4% Cu and
1.93g/t Au.
“Step-out RC drilling above and along strike from the original RC intersection in DRRC0006 will
provide additional information on the size and direction of the high-grade core to this extensively
altered and mineralized position.
“Meanwhile, the untested Eastern GAIP target at the Durnings is currently being assessed with auger
drilling and soil geochemistry to identify the initial RC drilling locations for follow-up.
“Overall, our geologists are looking forward to integrating the geological knowledge derived from the
RC and diamond drilling programs with the full assay dataset and the proposed diamond tail drilling
program to gain a more accurate picture of the orientation and style of the lead-silver rich horizon at
Rip n Tear and the high grade lead-zinc-silver-copper-gold sulphide mineralisation at Durnings. This
information will allow us to fully test these extensive structural corridors later in the year.”
Ends
For further information, please contact:
Andrew Munckton - Managing Director
on +61 4 3563 5598
Nicholas Read (Media inquiries)
on +61 4199 29046
This release has been authorised by the Board of Talisman Mining Limited.
8
Table 1: Drill-hole information summary - Durnings
Details and coordinates of the RC holes relevant to this release.
Exploratio
n Licence
Prospect
Hole
Typ
e
Hole ID
Easting
Northing
RL
Dip
Azimuth
(MGA
94)
EOH
Depth
EL8680
Durnings
RC
DRRC0006
505927
6386293
291
-60
50
286
EL8680
Durnings
RC
DRRC0007
505819
6386566
287
-61
47
238
EL8680
Durnings
RC
DRRC0008
505691
6386868
282
-61
47
268
EL8680
Durnings
RC
DRRC0009
505639
6387024
285
-60
51
322
EL8680
Durnings
RC
DRRC0010
505829
6386739
290
-60
49
268
EL8680
Durnings
RC
DRRC0011
505988
6386156
283
-60
50
328
Table 2: Drill-hole information summary - Rip N Tear
Details and coordinates of the RC and Diamond Holes relevant to this release.
Exploration
Licence
Prospect
Hole
Type
Hole ID
Easting
Northing
RL
Dip
Azimuth
(MGA 94)
EOH
Depth
EL8615
Rip N Tear
RC
MYRC0008
489184
6413709
276
-60
345
178
EL8615
Rip N Tear
RC
MYRC0009
488279
6413817
270
-60
331
166
EL8615
Rip N Tear
RC
MYRC0010
487750
6413341
273
-60
328
178
EL8615
Rip N Tear
RC
MYRC0011
488445
6413579
273
-60
329
156
EL8615
Rip N Tear
RC
MYDD0012
488630
6413719
274
-60
323
447
EL8615
Rip N Tear
RC
MYDD0013
490425
6413807
264
-60
340
283
EL8615
Rip N Tear
RC
MYRCD0002
488727
6413960
282
-60
202
318
EL8615
Rip N Tear
RC
MYRCD0003
489671
6414071
264
-60
180
411
EL8615
Rip N Tear
RC
MYRCD0004
487799
6412334
270
-60
299
457
Table 3: RC and DD drill-hole assay intersections for Mineralized Zones (Significant Intersections)
Details of significant RC and DD drilling intersections received to date for the Rip n Tear prospects by Talisman
are provided below.
9
All Table 3 intersections are length-weighted assay intervals either from two metre assay intervals taken
directly from the RC drill rig splitter or 0.5 to 1.5 metre Diamond core assay samples. See Table 4 and 5 for
intervals of core loss and no sampling within the reported mineralised zones (Significant Intercepts) for
MYRCDD004 and MYRCDD002.
All listed intersections are reported as down hole intersections at 0.5% Pb and/or 5g/t Ag and/or 0.20 % Cu
and/or 0.5 % Zn and or 0.25g/t Au lower cut-off as indicated in the comments section of Table 3. True width is
approximately 40% to 50% of reported downhole intersection in MYRCDD002 and MYRCD003. Appendix 2
contains full details on sampling and data aggregation methods including cut-off grades.
Table 4: Sample and assay sheet for Mineralized Zones (Significant Intersections) within DD core in
MYRCDD004
10
11
Table 5: Sample and assay sheet for mineralized zones (Significant Intersections) within DD core in
MYRCDD002.
5
12
Table 5 (cont): Sample and assay sheets for mineralized zones (Significant Intersections) within DD core in
MYRCDD002.
13
Table 5 (cont): Sample and assay sheets for mineralized zones (Significant Intersections) within DD core in
MYRCDD002.
bout Talisman Mining
14
Talisman Mining Limited (ASX:TLM) is an Australian mineral development and exploration company. The Company’s aim is to
maximise shareholder value through exploration, discovery and development of complementary opportunities in base and
precious metals.
Talisman has secured tenements in the Cobar/Mineral Hill region in Central NSW through the grant of its own Exploration Licenses
and through a joint venture agreement. The Cobar/Mineral Hill region is a richly mineralised district that hosts several base and
precious metal mines including the CSA, Tritton, and Hera/Nymagee mines. This region contains highly prospective geology that
has produced many long-life, high-grade mineral discoveries. Talisman has identified several areas within its Lachlan Cu-Au
Project tenements that show evidence of base and precious metals endowment which have had very little modern systematic
exploration completed to date. Talisman believes there is significant potential for the discovery of substantial base metals and
gold mineralisation within this land package and is undertaking active exploration to test a number of these targets.
Talisman also has secured access to over 1000 km2 of highly prospective tenure in South Australia’s Gawler Craton known as
the Mabel Creek Project. Mabel Creek is prospective for large scale Iron Oxide Copper Gold (IOCG) deposits and intrusion related
rare earths and battery metals mineralisation. Mable Creek is surrounded by similar tenure owned and being actively explored by
Australia’s biggest resource companies including BHP, Rio Tinto and FMG.
Competent Person’s Statement
Information in this announcement that relates to Exploration Results and Exploration Targets is based on, and fairly represents
information and supporting documentation compiled by Dr Tim Sharp, who is a member of the Australasian Institute of
Geoscientists. Dr Sharp is a full-time employee of Talisman Mining Ltd and has sufficient experience which is relevant to the style
of mineralisation and types of deposits under consideration and to the activities undertaken to qualify as a Competent Person as
defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”.
Dr Sharp has reviewed the contents of this announcement and consents to the inclusion in this announcement of all technical
statements based on his information in the form and context in which they appear.
Forward-Looking Statements
This ASX release may include forward-looking statements. These forward-looking statements are not historical facts but rather
are based on Talisman Mining Ltd.’s current expectations, estimates and assumptions about the industry in which Talisman Mining
Ltd operates, and beliefs and assumptions regarding Talisman Mining Ltd.’s future performance. Words such as “anticipates”,
“expects”, “intends”, “plans”, “believes”, “seeks”, “estimates”, “potential” and similar expressions are intended to identify forwardlooking statements. Forward-looking statements are only predictions and are not guaranteed, and they are subject to known and
unknown risks, uncertainties, and assumptions, some of which are outside the control of Talisman Mining Ltd. Past performance
is not necessarily a guide to future performance and no representation or warranty is made as to the likelihood of achievement or
reasonableness of any forward-looking statements or other forecast. Actual values, results or events may be materially different
to those expressed or implied in this presentation. Given these uncertainties, recipients are cautioned not to place reliance on
forward looking statements. Any forward-looking statements in this announcement speak only at the date of issue of this
announcement. Subject to any continuing obligations under applicable law and the ASX Listing Rules, Talisman Mining Ltd does
not undertake any obligation to update or revise any information or any of the forward-looking statements in this announcement
or any changes in events, conditions, or circumstances on which any such forward looking statement is based.
15
Appendix 2
JORC Tables Section 1 & 2
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria
Sampling
techniques
Drilling
techniques
JORC Code explanation
•
Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down-hole gamma
sondes, or handheld XRF instruments, etc.).
These examples should not be taken as
limiting the broad meaning of sampling.
•
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
•
Aspects of the determination of mineralisation
that are Material to the Public Report. In
cases where ‘industry standard’ work has
been done this would be relatively simple
(e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3kg was
pulverised to produce a 30 g charge for fire
assay’). In other cases, more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed
information.
•
Drill type (e.g. core, reverse circulation, openhole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (e.g. core diameter,
triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether
core is oriented and if so, by what method,
etc).
Commentary
•
•
•
•
•
•
•
•
•
Drill sample
recovery
•
•
Method of recording and assessing core
and chip sample recoveries and results
assessed.
Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
RC Drilling samples are collected at two metre intervals via
a drill rig mounted cyclone and static cone splitter set to a
12% split to produce a nominal 4-7kg sample which was
collected in a pre-numbered sample bag.
RC samples undergo routine 2 metre composite pXRF
analysis using a Olympus Vanta M-series to aid in logging
and identifying zones of interest.
Diamond core samples, either PQ, HQ3 or NQ2 in size
diameter, were either cut in half longitudinally or a third
longitudinally, using an automated Almnonte core saw
Core was placed in boats, holding core in place. Core
sample intervals varied from 0.3 to 1.3m in length but were
predominantly aligned to 1m intervals or with sample
boundaries which respected geological contacts.
Sampling is controlled by Talisman protocols and QAQC
procedures as per industry standard and a chain of custody
maintained through transfer to ALS Laboratories in
Adelaide, SA.
RC /DD samples were dried, crushed (where required),
split and pulverised (total prep) to produce a master pulp.
From this master pulp, a 0.25g sub sample was taken for
multi-element analysis by four acid digest with an ICP-MS
finish. A 30g sub sample was also taken for fire assay for
gold with ICP-AES finish
RC drilling cited in this report was undertaken by Strike
Drilling Pty Ltd using a LC36 (KWL 700) truck-mounted
Reverse Circulation drill rig. A truck-mounted booster and
compressor provided high pressure air with an auxiliary
compressor used where ground conditions warranted.
RC drilling was completed with a face sampling hammer of
nominal 140mm size.
Diamond Drilling cited in this report was undertaken by
DDH1 Drilling Pty LTD ùsing an Evolution FH3000 or
UDR1200 truck mounted rig.
The core was orientated using a Reflex Ez-Ori Tool.
RC Drilling
•
•
•
•
RC drill sample recovery is generally high with sample
recoveries and quality recorded in the database by the
logging geologist
Sample recoveries were monitored in real-time by the
presence of Talisman personnel at the drill site.
•No known relationship exists between recovery and grade
16
Criteria
JORC Code explanation
•
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
Commentary
and no known bias exists.
Diamond Drilling
•
•
Logging
•
•
•
Core recovery data was recorded for each run by
measuring total length of core retrieved against the
downhole interval actually drilled and stored in the
database. TLM representatives continuously monitor core
recovery and core presentation quality as drilling is
conducted and issues or discrepancies are rectified
promptly to maintain industry best standards.
Core recoveries within mineralised zones (significant
intercepts) are shown in Table 4 and 5.
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate
Mineral Resource estimation, mining
studies and metallurgical studies.
RC Drilling
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc.) photography.
•
The total length and percentage of the
relevant intersections logged.
•
•
•
•
RC logging records lithology, mineralogy, mineralisation,
alteration, structure, weathering, colour and other primary
features of the rock samples and is considered to be
representative across the intercepted geological units.
RC logging is both qualitative and quantitative depending
on the field being logged.
All RC drill-holes are logged in full to end of hole.
All RC chip trays are photographed, and then stored onsite
in the Lachlan Copper-Gold Project.
All information collected is entered directly into laptop
computers or tablets, validated in the field, and then
transferred to the database. The level of logging detail is
considered appropriate for exploration and to support
appropriate mineral resource estimation, mining studies,
and metallurgical studies.
Diamond Drilling
•
•
•
•
•
•
•
DD logging is carried out on site once geology personnel
retrieve core trays from the drill rig site. Core is collected
from the rig daily.
DD logging records lithology, mineralogy, mineralisation,
alteration, structure, weathering, colour and other primary
features of the rock samples and is considered to be
representative across the intercepted geological units.
All DD drill-holes are logged in full to end of hole.
Drillhole collar coordinates, azimuth, dip, depth and
sampling intervals are also recorded. DD logging is to
geological contacts.
DD logging is both qualitative and quantitative depending
on the field being logged. Logging of diamond drilling
includes geotechnical data, RQD and core recoveries.
Drill core is photographed prior to any cutting and/or
sampling, and then stored onsite in the Lachlan Copper Gold Project. Photographs are available for every diamond
drillhole completed.
All information collected is entered directly into laptop
computers or tablets, validated in the field, and then
transferred to the database. The level of logging detail is
considered appropriate for exploration and to support
17
Criteria
JORC Code explanation
Commentary
appropriate mineral resource estimation, mining studies,
and metallurgical studies
Sub-sampling
techniques and
sample
preparation
•
If core, whether cut or sawn and whether
quarter, half or all core taken.
•
If non-core, whether riffled, tube sampled,
rotary split, etc. and whether sampled wet
or dry.
•
For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
•
Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
•
Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.
•
Whether sample sizes are appropriate to
the grain size of the material being
sampled.
RC Drilling
•
•
•
•
•
Diamond Drilling
•
•
•
•
•
•
Quality of ssay
data
and laboratory
tests
•
•
RC samples were dried, crushed (where required), split
and pulverised (total prep) to produce a 0.25g sub sample
for base metal analysis or a 30g sub sample for gold
analysis by fire assay.
QAQC protocols for all RC sampling involved the use of
Certified Reference Material (CRM) as assay standards.
All QAQC controls and measures were routinely reviewed.
Sample size is considered appropriate for geochemical
sampling for base-metal and gold mineralisation given the
nature of drilling and anticipated distribution of
mineralisation.
Field duplicates were collected at a 1 in 30 sample rate.
Diamond drill core (NQ3, HQ or PQ) samples collected for
analysis were longitudinally cut in half, and quarters for the
QAQC samples using a using an automated Almnonte core
saw. Core was placed in boats, holding core in place.
Half core or quarter core sample intervals typically varied
from 0.3m to 1.3m in length. 1m sample intervals were
favoured and are the most common method of sampling,
however sample boundaries do principally coincide with
geological contacts. The remaining core was retained in
core trays.
DD samples were dried, crushed (where required), split
and pulverised (total prep) to produce a 0.25g sub sample
for base metal analysis or a 30g sub sample for gold
analysis by fire assay.
QAQC protocols for all DD sampling involved the use of
Certified Reference Material (CRM) as assay standards.
All QAQC controls and measures were routinely reviewed.
Sample size is considered appropriate for geoch
Share your feedback
Discover